IP Library Granted Patent US 11,368,932
Granted Patent B2
US 11,368,932 · App. 16/916,347 · Granted Jun 21, 2022

Method and apparatus for acquiring uplink transmission timing advance and communication system

Inventors: Qinyan Jiang (Beijing, CN); Lei Zhang (Beijing, CN)
Assignee: FUJITSU LIMITED
H04W56/0045
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,368,932
App. No.
16/916,347
Granted
Jun 21, 2022
Kind
B2
Abstract

A method and apparatus for acquiring uplink transmission timing advance and a communication system. The method includes: a network device obtains a timing advance command value (T A ), the T A being related to a first reference subcarrier spacing (SCS) used by a terminal equipment for calculating timing advance (T TA ); and the network device transmits a timing advance command (TA command), the TA command including the T A . Hence, the terminal equipment may be assisted in obtaining accurate timing advance of uplink transmission.

Claims (21)

1. An apparatus for acquiring uplink transmission timing advance and adjusting uplink transmission timing, configured in a terminal equipment, the apparatus comprising:

a receiver configured to receive a timing advance command (TA command) so as to obtain a timing advance command value (T A ) in the TA command; and

a controller configured to determine a first reference subcarrier spacing (SCS) related to the T A , and to calculate a timing advance (T TA ) based on the first reference SCS,

wherein, in a case that the terminal equipment changes an active Uplink (UL) Bandwidth Part (BWP) between a time of receiving the TA command and a time of applying a corresponding adjustment for the uplink transmission timing, the first reference SCS is the largest SCS of active UL BWPs in a Timing Advance Group (TAG) to which the TA command corresponds when the terminal equipment applies the corresponding adjustment for the uplink transmission timing.

2. The apparatus according to claim 1 , wherein the first reference SCS is predefined.

3. The apparatus according to claim 1 , wherein, the controller calculates or adjusts the timing advance (T TA ) based on a reference SCS at the terminal equipment side to which an uplink transmission time corresponds.

4. The apparatus according to claim 1 , wherein in a case that the terminal equipment changes an active UL BWP after applying an adjustment for the uplink transmission timing, the terminal equipment assumes a same absolute timing advance command value before and after the active UL BWP change.

5. The apparatus according to claim 1 , wherein in a case that the terminal equipment changes an active UL BWP to a second UL BWP between the time of receiving the TA command and the time of applying the corresponding adjustment for the uplink transmission timing the first reference SCS is the reference SCS of the second UL BWP.

6. An apparatus for controlling uplink transmission timing advance, configured in a network device, the apparatus comprising:

a controller configured to obtain a timing advance command value (T A ), the T A being related to a first reference subcarrier spacing (SCS) used by a terminal equipment for calculating timing advance (T TA ); and

a transmitter configured to transmit a timing advance command (TA command), the TA command including the T A ,

wherein, in a case that an active Uplink (UL) Bandwidth Part (BWP) is changed between a time of the terminal equipment receiving the TA command and a time of the terminal equipment applying a corresponding adjustment for the uplink transmission timing, the first reference SCS is the largest SCS of active UL BWPs in a Timing Advance Group (TAG) to which the TA command corresponds when the terminal equipment applies corresponding adjustment for the uplink transmission timing.

7. The apparatus according to claim 6 , wherein the first reference SCS is predefined.

8. A communication system, comprising:

a network device configured to:

obtain a timing advance command value (T A ), the T A being related to a first reference subcarrier spacing (SCS);

transmit a timing advance command (TA command), the TA command including the T A ; and

a terminal equipment configured to:

receive the TA command so as to obtain the timing advance command value (T A ) in the TA command;

determine a first reference SCS related to the T A ; and

calculate a timing advance (T TA ) based on the first reference SCS, wherein, in a case that an active Uplink (UL) Bandwidth Part (BWP) is changed between a time of the terminal equipment receiving the TA command and a time of the terminal equipment applying a corresponding adjustment for uplink transmission timing, the first reference SCS is the largest SCS of active UL BWPs in a Timing Advance Group (TAG) to which the TA command corresponds when the terminal equipment applies the corresponding adjustment for the uplink transmission timing.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 13, 2025
From: FUJITSU LIMITED
To: 1FINITY INC.
Reel/Frame 072436/0098 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 30, 2020
From: JIANG, QINYAN; ZHANG, LEI
To: FUJITSU LIMITED
Reel/Frame 053091/0463 →
Continuity (2)
Continuation PCTCN2018072163 · Jan 10, 2018
Related Publication 20200337011A1 · Oct 22, 2020
Cited By (1)
US 12,672,083