IP Library Granted Patent US 11,240,829
Granted Patent B2
US 11,240,829 · App. 16/937,414 · Granted Feb 1, 2022

Methods and apparatuses for scheduling request resource prioritization for beam failure recovery

Inventors: Hsin-Hsi Tsai (Taipei, TW); Heng-Li Chin (Taipei, TW); Chie-Ming Chou (Taipei, TW)
Assignee: Hannibal IP LLC
H04W72/1242H04W28/0278H04W72/046H04W72/1268
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,240,829
App. No.
16/937,414
Granted
Feb 1, 2022
Kind
B2
Abstract

A method for Scheduling Request (SR) resource prioritization for Beam Failure Recovery (BFR) includes a User Equipment (UE) receiving a first SR configuration from a Base Station (BS), receiving a second SR configuration from the BS, triggering a first SR procedure for a BFR procedure based on the first SR configuration, triggering a second SR procedure for a Buffer Status Report (BSR) procedure based on the second SR configuration, in a case that the first SR procedure and the second SR procedure are triggered and not cancelled and the first SR resource overlaps the second SR resource in the time domain, prioritizing the first SR resource over the second SR resource, and transmitting an SR on the first SR resource after prioritizing the first SR resource over the second SR resource.

Claims (50)

1. A method performed by a User Equipment (UE) for Scheduling Request (SR) resource prioritization, the method comprising:

receiving, from a Base Station (BS), a first SR configuration indicating a first SR index associated with a first SR resource;

receiving, from the BS, a second SR configuration indicating a second SR index associated with a second SR resource;

triggering a first SR procedure for a Beam Failure Recovery (BFR) procedure based on the first SR configuration;

triggering a second SR procedure for a Buffer Status Report (BSR) procedure based on the second SR configuration; and

in a case that the first SR procedure and the second SR procedure are triggered and not cancelled, and the first SR resource overlaps the second SR resource in a time domain,

prioritizing the first SR resource over the second SR resource; and

transmitting an SR on the first SR resource rather than the second SR resource after prioritizing the first SR resource over the second SR resource.

2. The method of claim 1 , wherein the first SR resource and the second SR resource are Physical Uplink Control Channel (PUCCH) resources.

3. The method of claim 1 , further comprising:

determining that the first SR resource overlaps the second SR resource when at least a part of the first SR resource overlaps the second SR resource in the time domain.

4. The method of claim 1 , wherein the BFR procedure is triggered by the UE when a beam failure event is detected by the UE on a Secondary Cell (SCell) of the BS.

5. The method of claim 1 , wherein the BSR procedure is triggered by the UE when Uplink (UL) data for a logical channel of the UE becomes available.

6. The method of claim 1 , further comprising:

determining whether a prohibit timer configured by the first SR configuration is running; and

transmitting the SR on the first SR resource when the prohibit timer is not running.

7. The method of claim 6 , further comprising:

starting the prohibit timer after transmitting the SR on the first SR resource.

8. The method of claim 6 , further comprising:

stopping the prohibit timer when the first SR procedure is cancelled by the UE or when a Medium Access Control (MAC) Protocol Data Unit (PDU) that includes a BFR MAC Control Element (CE) is transmitted from the UE to the BS.

9. The method of claim 1 , further comprising:

determining whether the first SR resource overlaps a measurement gap in the time domain; and

transmitting the SR on the first SR resource when the first SR resource does not overlap the measurement gap in the time domain.

10. The method of claim 1 , wherein the first SR resource has a highest priority for SR transmission among all SR resources configured to the UE.

11. A User Equipment (UE) comprising:

a memory; and

at least one processor coupled to the memory, the at least one processor being configured to:

receive, from a Base Station (BS), a first Scheduling Request (SR) configuration indicating a first SR index associated with a first SR resource;

receive, from the BS, a second SR configuration indicating a second SR index associated with a second SR resource;

trigger a first SR procedure for a Beam Failure Recovery (BFR) procedure based on the first SR configuration;

trigger a second SR procedure for a Buffer Status Report (BSR) procedure based on the second SR configuration; and

in a case that the first SR procedure and the second SR procedure are triggered and not cancelled, and the first SR resource overlaps the second SR resource in a time domain,

prioritize the first SR resource over the second SR resource; and

transmit an SR on the first SR resource rather than the second SR resource after prioritizing the first SR resource over the second SR resource.

12. The UE of claim 11 , wherein the first SR resource and the second SR resource are Physical Uplink Control Channel (PUCCH) resources.

13. The UE of claim 11 , wherein the at least one processor is further configured to:

determine that the first SR resource overlaps the second SR resource when at least a part of the first SR resource overlaps the second SR resource in the time domain.

14. The UE of claim 11 , wherein the BFR procedure is triggered by the UE when a beam failure event is detected by the UE on a Secondary Cell (SCell) of the BS.

15. The UE of claim 11 , wherein the BSR procedure is triggered by the UE when Uplink (UL) data for a logical channel of the UE becomes available.

16. The UE of claim 11 , wherein the at least one processor is further configured to:

determine whether a prohibit timer configured by the first SR configuration is running; and

transmit the SR on the first SR resource when the prohibit timer is not running.

17. The UE of claim 16 , wherein the at least one processor is further configured to:

start the prohibit timer after transmitting the SR on the first SR resource.

18. The UE of claim 16 , wherein the at least one processor is further configured to:

stop the prohibit timer when the first SR procedure is cancelled by the UE or when a Medium Access Control (MAC) Protocol Data Unit (PDU) that includes a BFR MAC Control Element (CE) is transmitted from the UE to the BS.

19. The UE of claim 11 , wherein the at least one processor is further configured to:

determine whether the first SR resource overlaps a measurement gap in the time domain; and

transmit the SR on the first SR resource when the first SR resource does not overlap the measurement gap in the time domain.

20. The UE of claim 11 , wherein the first SR resource has a highest priority for SR transmission among all SR resources configured to the UE.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 15, 2021
From: FG INNOVATION COMPANY LTD.
To: HANNIBAL IP LLC
Reel/Frame 057487/0504 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 23, 2020
From: TSAI, HSIN-HSI; CHIN, HENG-LI; CHOU, CHIE-MING
To: FG INNOVATION COMPANY LIMITED
Reel/Frame 053298/0010 →
Cited By (1)
US 12,563,589