IP Library Granted Patent US 11,362,582
Granted Patent B2
US 11,362,582 · App. 16/938,219 · Granted Jun 14, 2022

Multi-phase converter control system and method for interleaving multi-phase converters

Inventors: Charles E. Green (Fenton, MO); Paul Rancuret (St. Louis, MO)
Assignee: Emerson Climate Technologies, Inc.
H02M1/4208H02M1/38H02M1/0009H02M1/32H02M1/44H02P27/06
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,362,582
App. No.
16/938,219
Granted
Jun 14, 2022
Kind
B2
Abstract

A desired OFF period module is configured to determine a desired OFF period for a plurality of switches of a PFC circuit based on an input voltage and an output voltage. A blanking timer module is configured to output a blanking signal, set the blanking signal to a first state when a countdown timer is greater than zero, and set the blanking signal to a second state when the countdown timer reaches zero. A switching control module is configured to: transition a first switch of the plurality of switches from an ON state to an OFF state in response to (i) a measured current through an inductor of the PFC circuit being greater than a demanded current through the inductor and (ii) the blanking signal being in the second state; and maintain the first switch in the OFF state for the desired OFF period after the transition.

Claims (87)

1. A power factor correction (PFC) system comprising:

a desired OFF period module configured to determine a desired OFF period for a plurality of switches of a PFC circuit based on an input voltage to the PFC circuit and an output voltage of the PFC circuit;

a blanking timer module configured to output a blanking signal, to set the blanking signal to a first state when a countdown timer is greater than zero, and to set the blanking signal to a second state when the countdown timer reaches zero; and

a switching control module configured to:

transition a first switch of the plurality of switches from an ON state to an OFF state in response to (i) a measured current through an inductor of the PFC circuit being greater than a demanded current through the inductor and (ii) the blanking signal being in the second state; and

maintain the first switch of the plurality of switches in the OFF state for at least the desired OFF period after the transition from the ON state to the OFF state.

2. The PFC system of claim 1 wherein the desired OFF period module is configured to set the desired OFF period using one of:

(i) an equation that relates input voltages and output voltages to desired OFF periods; and

(ii) a look-up table that relates input voltages and output voltages to desired OFF periods.

3. The PFC system of claim 1 wherein the desired OFF period module is configured to set the desired OFF period using the equation:

D

O

P

=

t

p

*

V

I

V

O

,

where DOP is the desired OFF period, t p is a predetermined switching period, v i is the input voltage, and v 0 is the output voltage.

4. The PFC system of claim 1 further comprising a first timer module configured to output a first time representative of a first period that the first switch of the plurality of switches has been in the OFF state, wherein:

the switching control module is configured to:

determine a maximum off period for the first switch of the plurality of switches based on an OFF period of a converter leg associated with the first switch of the plurality of switches, and

in response to determining that the first time is greater than or equal to (i) the desired OFF period and (ii) the maximum off period, transition the first switch of the plurality of switches from the OFF state to the ON state.

5. The PFC system of claim 4 further comprising a second timer module configured to output a second time representative of a second period that has passed since a second switch of the plurality of switches was transitioned from the OFF state to the ON state,

wherein the switching control module is configured to:

determine a threshold value associated with the second switch of the plurality of switches based on the OFF period of the converter leg, and

in response to determining that (i) the first time is greater than or equal to the desired OFF period and (ii) the second time is greater than or equal to the determined threshold value, transition the first switch of the plurality of switches from the OFF state to the ON state.

6. The PFC system of claim 5 wherein the switching control module is configured to, in response to transitioning the first switch of the plurality of switches from the ON state to the OFF state, delay for a predetermined dead time and, once the predetermined dead time has passed, transition a third switch of the plurality of switches from the OFF state to the ON state.

7. The PFC system of claim 6 wherein transitioning the first switch of the plurality of switches from the OFF state to the ON state includes:

transitioning a third switch of the plurality of switches from the ON state to the OFF state; and

delaying for the predetermined dead time,

after the predetermined dead time has passed, transitioning the first switch of the plurality of switches from the OFF state to the ON state.

8. The PFC system of claim 5 wherein the blanking timer module is configured to reset the countdown timer in response to one of:

the first switch of the plurality of switches transitioning from the ON state to the OFF state; and

the second switch of the plurality of switches transitioning from the ON state to the OFF state.

9. The PFC system of claim 4 wherein the switching control module is configured to, in response to the measured current through the inductor of the PFC circuit being greater than the demanded current through the inductor, store the first time output by the first timer module as the OFF period of the converter leg.

10. The PFC system of claim 1 wherein the desired OFF period module is configured to determine the desired OFF period based on a switching period associated with the first switch of the plurality of switches.

11. A power factor correction (PFC) method comprising:

determining a desired OFF period for a plurality of switches of a PFC circuit based on an input voltage to the PFC circuit and an output voltage of the PFC circuit;

outputting a blanking signal;

setting the blanking signal to a first state when a countdown timer is greater than zero;

setting the blanking signal to a second state when the countdown timer reaches zero;

transitioning a first switch of the plurality of switches from an ON state to an OFF state in response to (i) a measured current through an inductor of the PFC circuit being greater than a demanded current through the inductor and (ii) the blanking signal being in the second state; and

maintaining the first switch of the plurality of switches in the OFF state for at least the desired OFF period after the transition from the ON state to the OFF state.

12. The PFC method of claim 11 wherein setting the desired OFF period includes setting the desired OFF period using one of:

(i) an equation that relates input voltages and output voltages to desired OFF periods; and

(ii) a look-up table that relates input voltages and output voltages to desired OFF periods.

13. The PFC method of claim 11 setting the desired OFF period includes setting the desired OFF period using the equation:

D

O

P

=

t

p

*

V

I

V

O

,

where DOP is the desired OFF period, t p is a predetermined switching period, v i is the input voltage, and v o is the output voltage.

14. The PFC method of claim 11 further comprising:

outputting a first time representative of a first period that the first switch of the plurality of switches has been in the OFF state;

determining a maximum off period for the first switch of the plurality of switches based on an OFF period of a converter leg associated with the first switch of the plurality of switches; and

in response to determining that the first time is greater than or equal to (i) the desired OFF period and (ii) the maximum off period, transitioning the first switch of the plurality of switches from the OFF state to the ON state.

15. The PFC method of claim 14 further comprising:

outputting a second time that represents a second period that has passed since a second switch of the plurality of switches was transitioned from the OFF state to the ON state;

determining a threshold value associated with the second switch of the plurality of switches based on the OFF period of the converter leg; and

in response to determining that (i) the first time is greater than or equal to the desired OFF period and (ii) the second time is greater than or equal to the determined threshold value, transitioning the first switch of the plurality of switches from the OFF state to the ON state.

16. The PFC method of claim 15 further comprising, in response to transitioning the first switch of the plurality of switches from the ON state to the OFF state, delaying for a predetermined dead time and, once the predetermined dead time has passed, transitioning a third switch of the plurality of switches from the OFF state to the ON state.

17. The PFC method of claim 16 wherein transitioning the first switch of the plurality of switches from the OFF state to the ON state includes:

transitioning a third switch of the plurality of switches from the ON state to the OFF state; and

delaying for the predetermined dead time,

after the predetermined dead time has passed, transitioning the first switch of the plurality of switches from the OFF state to the ON state.

18. The PFC method of claim 15 further comprising resetting the countdown timer in response to one of:

the first switch of the plurality of switches transitioning from the ON state to the OFF state; and

the second switch of the plurality of switches transitioning from the ON state to the OFF state.

19. The PFC method of claim 14 further comprising, in response to the measured current through the inductor of the PFC circuit being greater than the demanded current through the inductor, storing the first time output as the OFF period of the converter leg.

20. The PFC method of claim 11 further comprising determining the desired OFF period based on a switching period associated with the first switch of the plurality of switches.

Assignments (6)
SECURITY INTEREST Recorded Jul 9, 2024
From: COPELAND LP
To: U.S. BANK TRUST COMPANY, NATIONAL ASSOCIATION, AS NOTES COLLATERAL AGENT
Reel/Frame 068241/0264 →
SECURITY INTEREST Recorded Jul 17, 2023
From: COPELAND LP
To: ROYAL BANK OF CANADA, AS COLLATERAL AGENT
Reel/Frame 064278/0598 →
SECURITY INTEREST Recorded Jul 17, 2023
From: COPELAND LP
To: U.S. BANK TRUST COMPANY, NATIONAL ASSOCIATION, AS NOTES COLLATERAL AGENT
Reel/Frame 064279/0327 →
SECURITY INTEREST Recorded Jul 17, 2023
From: COPELAND LP
To: WELLS FARGO BANK, NATIONAL ASSOCIATION, AS COLLATERAL AGENT
Reel/Frame 064280/0695 →
ENTITY CONVERSION Recorded Jun 22, 2023
From: EMERSON CLIMATE TECHNOLOGIES, INC.
To: COPELAND LP
Reel/Frame 064058/0724 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 27, 2020
From: GREEN, CHARLES E.; RANCURET, PAUL
To: EMERSON CLIMATE TECHNOLOGIES, INC.
Reel/Frame 053314/0623 →
Continuity (2)
Provisional Application 62879162 · Jul 26, 2019
Related Publication 20210028692A1 · Jan 28, 2021