Method for starting up a gas turbine engine of a combined cycle power plant

Inventors: Kok-Mun Tham (Oviedo, FL); Christian Keune (Heiligenhaus, DE); Nicolas Benjamin Wappler (Düsseldorf, DE)
Assignee: Siemens Energy Global GmbH & Co. KG
F01D19/00F01K13/02F02C9/54F05D2220/32F05D2220/72F05D2260/85
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,255,218
App. No.
16/963,620
Granted
Feb 22, 2022
Kind
B2
Abstract

The invention relates to a method for starting up a gas turbine engine of a combined cycle power plant. The method includes applying load to the gas turbine engine and increasing the load until a predetermined combustor firing temperature is reached, while keeping the adjustable inlet guide vanes in a start position adapted to reduce the mass flow of air into the compressor; further increasing the load of the gas turbine engine while opening the adjustable inlet guide vanes and keeping the predetermined combustor firing temperature constant until the inlet guide vanes reach an end position adapted to increase the mass flow of air into the compressor; further increasing the load of the gas turbine engine while keeping the adjustable inlet guide vanes in the end position until a predetermined load of the gas turbine engine is reached.

Claims (8)

1. A method for starting up a gas turbine engine of a combined cycle power plant, the gas turbine engine including a compressor, a combustor and a turbine, the compressor providing compressed air to the combustor for combustion with a fuel to produce a working fluid and the turbine receiving the working fluid to produce power; the compressor comprising adjustable inlet guide vanes, the adjustable inlet guide vanes being adjustable between a fully closed position for minimizing the mass flow of air into the compressor and a fully open position for providing the maximum mass flow of air into the compressor; wherein the method comprises the steps of:

step 1: applying load to the gas turbine engine and increasing the load until a predetermined combustor firing temperature is reached, while keeping the adjustable inlet guide vanes in a start position adapted to reduce the mass flow of air into the compressor, whereby the predetermined combustor firing temperature is chosen to be an emission-compliant temperature,

step 2: further increasing the load of the gas turbine engine while opening the adjustable inlet guide vanes and keeping the predetermined combustor firing temperature constant until the inlet guide vanes reach an end position adapted to increase the mass flow of air into the compressor,

step 3: further increasing the load of the gas turbine engine while keeping the adjustable inlet guide vanes in the end position until a predetermined load of the gas turbine engine is reached.

2. A method according claim 1 , wherein the predetermined combustor firing temperature is between 1000° C. and 1850° C.

3. A method according to claim 1 , wherein in step 3 the predetermined load is a base load of the gas turbine engine.

4. A method according to claim 1 , wherein in step 1 the start position of the adjustable inlet guide vanes is the fully closed position.

5. A method according to claim 1 , wherein in step 3 the end position of adjustable inlet guide vanes is the fully open position.

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 28, 2021
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS ENERGY GLOBAL GMBH & CO. KG
Reel/Frame 058597/0317 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 27, 2021
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS ENERGY GLOBAL GMBH & CO. KG
Reel/Frame 058480/0716 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 21, 2020
From: THAM, KOK-MUN
To: SIEMENS ENERGY, INC.
Reel/Frame 053265/0454 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 21, 2020
From: KEUNE, CHRISTIAN; WAPPLER, NICOLAS BENJAMIN
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 053265/0546 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 21, 2020
From: SIEMENS ENERGY, INC.
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 053265/0649 →