IP Library Patent Application 17087068
Patent Application
App. No. 17/087,068

LOAD LEVELING POWER STORAGE SYSTEM FOR ELECTRIC HYDRAULIC FRACTURING

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
17/087,068
Abstract

A fracturing system includes a generator having a specific set point, a power storage system, a microgrid, and one or more fracturing system components configured to receive power from the microgrid. In some embodiments, the power storage system includes a chargeable power storage device. The generator provides power to the microgrid via a first circuit breaker. The power storage system is electrically coupled to a second circuit breaker to controllably supply power to or receive power from the microgrid via the second circuit breaker. The power storage system charges when the first and second circuit breakers are both closed. The power storage system stops charging when the one or more fracturing system component requires power. The power storage system discharges power to the microgrid when a load requirement of the one or more fracturing system components is above the set point.

Claims (41)

1 . A fracturing system, comprising:

a generator having a specific set point;

a power storage system comprising a chargeable power storage device;

a microgrid comprising:

a first circuit breaker, wherein the generator provides power to the microgrid via the first circuit breaker; and

a second circuit breaker, wherein the power storage system is electrically coupled to the second circuit breaker to controllably supply power to or receive power from the microgrid via the second circuit breaker, wherein the first and second circuit breakers are connected to a common bus for load sharing; and

one or more fracturing system components configured to receive power from the microgrid,

wherein the power storage system charges when the first and second circuit breakers are both closed, and the power storage system stops charging when the one or more fracturing system component requires power, and the power storage system discharges power to the microgrid when a load requirement of the one or more fracturing system components is above the set point.

2 . The fracturing system of claim 1 , wherein the chargeable power storage device is a solid state battery, a flow battery, a flywheel, or a capacitor.

3 . The fracturing system of claim 1 , wherein the power storage device powers the one or more fracturing system component during conditions in which the generator is down.

4 . The fracturing system of claim 1 , wherein the generator charges the power storage device when the first and second circuit breakers are both closed.

5 . The fracturing system of claim 1 , wherein the power storage device disconnects from receiving power from the generator when the one or more fracturing system components draw power.

6 . The fracturing system of claim 1 , wherein the power storage device provides power to auxiliary devices and starters for one or more generators.

7 . The fracturing system of claim 1 , further comprising:

one or more additional power storage systems coupled to the microgrid.

8 . A fracturing system, comprising:

a generator set at a specific set point;

a power storage system comprising a chargeable power storage device, wherein the power storage system receives power from the generator;

a microgrid configured to receive power from the power storage system;

one or more fracturing system components configured to receive power from the microgrid;

an incoming breaker coupled between the generator and the chargeable power storage device; and

an outgoing breaker between the chargeable power storage device and the microgrid,

wherein during conditions in which the one or more fracturing system components require a load below the set point, the power storage system is charged by the generator; and

wherein during conditions in which the one or more fracturing system components require a load above the set point, the one or more fracturing system components are powered by both the generator and the power storage system.

9 . The fracturing system of claim 8 , wherein the chargeable power storage device is a solid state battery, a flow battery, a flywheel, or a capacitor.

10 . The fracturing system of claim 8 , wherein the power storage device powers the one or more fracturing system component during conditions in which the generator is down.

11 . The fracturing system of claim 8 , wherein the generator and the power storage system are electrically coupled in series.

12 . The fracturing system of claim 8 , wherein the power storage device disconnects from receiving power from the generator when the one or more fracturing system components draw power.

13 . The fracturing system of claim 8 , wherein the power storage device provides power to auxiliary devices and starters for one or more generators.

14 . The fracturing system of claim 8 , further comprising:

one or more additional power storage systems coupled to the microgrid.

15 . A method of powering a fracturing system, comprising:

supplying power to one or more components of the fracturing system from a generator;

charging a power storage system from the generator during one or more conditions in which the load requirement of the one or more components of the fracturing system is below the set point of the generator; and

supplying power to the one or more components of the fracturing system from both the generator and the power storage system during one or more conditions in which the load requirement of the one or more components of the fracturing system is above the set point of the generator.

16 . The method of claim 15 , wherein the power storage system includes a chargeable power storage device.

17 . The method of claim 15 , further comprising:

supplying power to the one or more components of the fracturing system from the power storage system during conditions in which the generator is down.

18 . The method of claim 15 , wherein the power storage device disconnects from receiving power from the generator when the one or more fracturing system components draw power.

19 . The method of claim 15 , wherein the power storage device provides power to auxiliary devices and starters for one or more generators.

20 . The method of claim 15 , wherein the generator and the power storage system are electrically coupled in series.

Assignments (6)
INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded Jan 3, 2024
From: FTS INTERNATIONAL SERVICES, LLC; U.S. WELL SERVICES, LLC; PROFRAC SERVICES, LLC; U.S. WELL SERVICES HOLDINGS, LLC; BEST PUMP AND FLOW, LLC
To: U.S. BANK TRUST COMPANY, NATIONAL ASSOCIATION, AS COLLATERAL AGENT
Reel/Frame 066186/0752 →
RELEASE OF SECURITY INTEREST Recorded Dec 21, 2023
From: WILMINGTON SAVINGS FUND SOCIETY, FSB, AS COLLATERAL AGENT
To: U.S. WELL SERVICES, LLC
Reel/Frame 066091/0133 →
SECURITY INTEREST Recorded Dec 16, 2022
From: U.S. WELL SERVICE HOLDINGS, LLC; USWS HOLDINGS LLC; U.S. WELL SERVICES, LLC; USWS FLEET 10, LLC; USWS FLEET 11, LLC
To: JPMORGAN CHASE BANK, N.A.
Reel/Frame 062142/0927 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 30, 2022
From: HINDERLITER, BRANDON; OEHRING, JARED; RILEY, STEVEN
To: U.S. WELL SERVICES, LLC
Reel/Frame 061924/0517 →
SECURITY INTEREST Recorded Nov 2, 2022
From: U.S. WELL SERVICES, LLC
To: PIPER SANDLER FINANCE LLC
Reel/Frame 061875/0001 →
SECURITY INTEREST Recorded Jun 30, 2021
From: U.S. WELL SERVICES, LLC
To: WILMINGTON SAVINGS FUND SOCIETY, FSB
Reel/Frame 057434/0429 →