IP Library Granted Patent US 11,398,795
Granted Patent B2
US 11,398,795 · App. 17/123,831 · Granted Jul 26, 2022

Roof integrated photovoltaic system

Inventors: Brian Edward Atchley (Petaluma, CA); Peter Clemente (Warren, NJ); Nazar Dzoba (Edison, NJ); Anthony Folk (Whitehouse Station, NJ); Amy Ochsenrieter (Morristown, NJ); Daniel East (Petaluma, CA)
Assignee: GAF Energy LLC
H02S20/23E04D3/38
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,398,795
App. No.
17/123,831
Granted
Jul 26, 2022
Kind
B2
Abstract

A roof integrated photovoltaic system includes a starter bar having a foot base and configured to be installed to a roof deck, a plurality of water shedding layers, and a photovoltaic module. One of the plurality of water shedding layers is configured to be installed over the foot base of the starter bar, and one of another of which is configured to overlap and be installed over the one of the plurality of water shedding layers. The system further includes a foot module configured to be attached to an upper portion of the photovoltaic module. A lower portion of the photovoltaic module is configured to align with the foot base of the starter bar, and the foot module is configured to be affixed on a last overlapping layer of the plurality of water shedding layers to the roof deck.

Claims (72)

1. A method, comprising:

installing a starter bar to a roof deck,

wherein the starter bar includes first and second foot bases;

wherein the first and second foot bases extend along a length of the starter bar;

installing one of a first plurality of water shedding layers over the first and second foot bases of the starter bar;

overlapping at least one of another of the first plurality of water shedding layers over the one of the first plurality of water shedding layers;

installing first and second foot modules on at least one of the first plurality of water shedding layers;

overlapping one layer of a second plurality of water shedding layers over both

the first and second foot modules, and

at least one of the first plurality of water shedding layers;

installing a first photovoltaic module, the first photovoltaic module having

a top surface,

a bottom surface,

an upper portion,

a lower portion, and

a pair of side portions, each of which extends from the upper portion to the lower portion,

wherein the upper portion of the first photovoltaic module attaches to the first and second foot modules,

wherein the lower portion of the first photovoltaic module overlaps the first and second foot bases of the starter bar and connects to the starter bar,

wherein the starter bar extends along the entire length of the lower portion of the photovoltaic module.

2. The method of claim 1 , wherein the last overlapping layer of the at least one of another of the first plurality of water shedding layers includes a second water shedding layer.

3. The method of claim 2 , further comprising the step of affixing the one of the first plurality of water shedding layers and the second water shedding layer to the roof deck.

4. The method of claim 1 , wherein the at least one of another of the first plurality of water shedding layers includes a second water shedding layer overlapping the one of the first plurality of water shedding layers, and a third water shedding layer overlapping the second water shedding layer, the third water shedding layer being the last overlapping layer of the at least one of another of the first plurality of water shedding layers.

5. The method of claim 4 , further comprising the step of affixing the one of the first plurality of water shedding layers and the second and third water shedding layers to the roof deck.

6. The method of claim 4 , wherein the second water shedding layer includes a first edge that is positioned offset from the first foot base of the starter bar, and the third water shedding layer includes a first edge that is positioned offset from the first edge of the second water shedding layer.

7. The method of claim 1 , wherein the at least one of another of the first plurality of water shedding layers includes a second water shedding layer overlapping the one of the first plurality of water shedding layers, a third water shedding layer overlapping the second water shedding layer, and a fourth water shedding layer overlapping the third water shedding layer, the fourth water shedding layer being the last overlapping layer of the at least one of another of the first plurality of water shedding layers.

8. The method of claim 7 , further comprising the step of affixing the one of the first plurality of water shedding layers and the second, third and fourth water shedding layers to the roof deck.

9. The method of claim 7 , wherein the second water shedding layer includes a first edge that is positioned offset from the first foot base of the starter bar, the third water shedding layer includes a first edge that is positioned offset from the first edge of the second water shedding layer, and the fourth water shedding layer includes a first edge that is positioned offset from the first edge of the third water shedding layer.

10. The method of claim 7 , further comprising the step of:

installing third and fourth foot modules; and

installing at least one second photovoltaic module, the at least one second photovoltaic module having

a top surface,

a bottom surface,

an upper portion,

a lower portion, and

a pair of side portions, each of which extends from the upper portion of the at least one second photovoltaic module to the lower portion of the second photovoltaic module, and

wherein the upper portion of the second photovoltaic module attaches to the third and fourth foot modules,

wherein the lower portion of the second photovoltaic module is aligned with the first and second foot modules, and

wherein third and fourth foot modules are affixed on a last overlapping layer of the second plurality of water shedding layers to the roof deck.

11. A system, comprising:

a starter bar installed on a roof deck,

wherein the starter bar includes first and second foot bases;

wherein the first and second foot bases extend along a length of the starter bar;

a first plurality of water shedding layers, one of which installed over the first and second foot bases of the starter bar, and at least one of another of which installed over the one of the first plurality of water shedding layers;

first and second foot modules installed on at least one of the first plurality of water shedding layers;

a second plurality of water shedding layers, one of which installed over both

the first and second foot modules, and

at least one of the first plurality of water shedding layers;

a first photovoltaic module having

a top surface,

a bottom surface,

an upper portion,

a lower portion, and

a pair of side portions, each of which extends from the upper portion to the lower portion; and

wherein the upper portion of the first photovoltaic module attached to the first and second foot modules,

wherein the lower portion of the first photovoltaic module overlapping the first and second foot base of the starter bar and connecting to the starter bar, and

wherein the starter bar extends along the entire length of the lower portion of the photovoltaic module.

12. The system of claim 11 , wherein the last overlapping layer of the at least one of another of the first plurality of water shedding layers includes a second water shedding layer.

13. The system of claim 11 , wherein the at least one of another of the first plurality of water shedding layers includes a second water shedding layer overlapping the one of the first plurality of water shedding layers, and a third water shedding layer overlapping the second water shedding layer, the third water shedding layer being the last overlapping layer of the at least one of another of the first plurality of water shedding layers.

14. The system of claim 11 , wherein the at least one of another of the first plurality of water shedding layers includes a second water shedding layer overlapping the one of the first plurality of water shedding layers, a third water shedding layer overlapping the second water shedding layer, and a fourth water shedding layer overlapping the third water shedding layer, the fourth water shedding layer being the last overlapping layer of the at least one of another of the first plurality of water shedding layers.

15. The system of claim 11 , further comprising:

a second photovoltaic module,

the second photovoltaic module having

a top surface,

a bottom surface,

an upper portion,

a lower portion, and

a pair of side portions, each of which extends from the upper portion of the second photovoltaic module to the lower portion of the second photovoltaic module; and

third and fourth foot modules attached to the upper portion of the at least one second photovoltaic module,

wherein the lower portion of the second photovoltaic module aligns with the first and second foot modules, and

the third and fourth foot modules affixed on a last overlapping layer of the second plurality of water shedding layers to the roof deck.

16. The system of claim 11 , further comprising a bracket for at least one module-level power electronic, the bracket attached to the at least one first photovoltaic module, and the at least one module-level power electronic positioned under the bottom surface of the at least one first photovoltaic module.

17. The system of claim 16 , wherein the bracket includes at least one hook member removably attached to at least one of the top portion, the lower portion and either of the side portions of the at least one first photovoltaic module.

Assignments (1)
SECURITY INTEREST Recorded Sep 23, 2021
From: BMIC LLC; ELKCORP; ELK COMPOSITE BUILDING PRODUCTS, INC.; ELK PREMIUM BUILDING PRODUCTS, INC.; HBP ACQUISITION LLC; GAF ENERGY LLC; SIPLAST, INC.; SPECIALTY GRANULES INVESTMENTS LLC
To: DEUTSCHE BANK AG NEW YORK BRANCH
Reel/Frame 057572/0607 →
Continuity (2)
Provisional Application 62951300 · Dec 20, 2019
Related Publication 20210194411A1 · Jun 24, 2021