IP Library Granted Patent US 11,173,544
Granted Patent B2
US 11,173,544 · App. 17/184,954 · Granted Nov 16, 2021

Casting apparatus and method for producing castings using it

Inventors: Masahide Kawabata (Moka, JP); Toru Iwanaga (Moka, JP); Kiyoshi Suehara (Moka, JP); Yutaka Morita (Moka, JP); Masafumi Kokubo (Moka, JP)
Assignee: HITACHI METALS, LTD.
B22D27/13B22C9/08B22D18/02B22D18/04B22D27/09B22D41/58
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,173,544
App. No.
17/184,954
Granted
Nov 16, 2021
Kind
B2
Abstract

A casting apparatus for producing a casting by pouring a metal melt into a gas-permeable casting mold by gravity, comprising: a gas-permeable casting mold comprising a cavity including a sprue composed of a tubular portion and a cup portion having a larger diameter than that of the tubular portion to receive the metal melt, a runner constituting a flow path of the metal melt supplied through the sprue, and a product-forming cavity to be filled with the metal melt sent through the runner; a means for pouring the metal melt into the sprue by gravity; a gas-blowing unit comprising a gas-ejecting member to be connected to the sprue; and a mechanism for moving the gas-ejecting member; the gas-ejecting-member-moving mechanism placing the gas-ejecting member at a position just above the tubular portion and not interfering with gravity pouring of the metal melt, and moving it downward for connection to the tubular portion; the gas-blowing unit having blowing a gas to fill the product-forming cavity with the metal melt.

Claims (8)

1. A method for producing a casting comprises the steps of:

pouring a metal melt by gravity into a gas-permeable casting mold comprising a cavity including a sprue composed of a tubular portion and a cup portion having a larger diameter than that of the tubular portion to receive the metal melt, a runner constituting a flow path of the metal melt supplied through the sprue, and a product-forming cavity to be filled with the metal melt sent through the runner; and then blowing a gas into the cavity of the gas-permeable casting mold from a gas-ejecting member of a gas-blowing unit, to fill the product-forming cavity with the metal melt;

wherein the gas-ejecting member is placed at a position just above the tubular portion and not interfering with gravity pouring of the metal melt, and moved downward to the sprue for connection to the tubular portion after gravity-pouring ends;

the method further comprising the steps of placing a stream of the metal melt poured from a pouring means just above or near the tubular portion at an early stage of a pouring step, and moving the stream away therefrom within a region of the cup portion at a late stage of the pouring step.

2. The method for producing a casting according to claim 1 , wherein the gas-ejecting member is placed such that a gas-ejecting port of the gas-ejecting member is below an upper edge of the cup portion.

3. The method for producing a casting according to claim 1 , wherein the gas-ejecting member is placed such that a gas-ejecting port of the gas-ejecting member comes into contact with the metal melt residing in the cup portion.

4. The method for producing a casting according to claim 1 , wherein the pouring means is placed at a position away from the position just above or near the tubular portion at least at the end of pouring of the melt so that the pouring means is located at a position away from an operation range of the gas-ejecting member.

5. The method for producing a casting according to claim 1 , further comprising the step of controlling the position of the gas-ejecting member of the gas-blowing unit according to a surface position of the metal melt residing in the sprue.

Assignments (3)
CHANGE OF ADDRESS Recorded Dec 9, 2025
From: HITACHI METALS, LTD.
To: HITACHI METALS, LTD.
Reel/Frame 073917/0124 →
CHANGE OF NAME Recorded Dec 9, 2025
From: HITACHI METALS, LTD.
To: PROTERIAL, LTD.
Reel/Frame 073917/0160 →
CHANGE OF ADDRESS Recorded Nov 20, 2025
From: HITACHI METALS, LTD.
To: HITACHI METALS, LTD.
Reel/Frame 073636/0806 →
Priority Claims (1)
JP 2013-203824 · Sep 30, 2013 · national
Continuity (3)
Division 15903187 · Feb 23, 2018
Continuation 15025600
Related Publication 20210178463A1 · Jun 17, 2021