IP Library Granted Patent US 11,796,601
Granted Patent B2
US 11,796,601 · App. 17/198,401 · Granted Oct 24, 2023

Battery management system and battery management method

Inventors: Doo Jin Jeong (Daejeon, KR); Jeong Min Seo (Daejeon, KR); Kyu Min Hwang (Daejeon, KR); Byung Eun Lee (Daejeon, KR)
Assignee: SK On Co., Ltd.
G01R31/392G01R31/382G01R31/396H01M10/4257H01M2010/4271
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,796,601
App. No.
17/198,401
Granted
Oct 24, 2023
Kind
B2
Abstract

Provided are a battery management system and a battery management method using the same. According to the present invention, it is possible to select high-risk battery cells that are highly likely to be out of an operating voltage range by applying a change amount according to SoH for each of the battery cells to each SoC for each of the battery cells, and calculate the representative SoH of the battery pack based on the selected high-risk battery cells, and then calculate the actual usable capacity of the battery pack.

Claims (31)

1. A battery management system for selecting, from a plurality of battery cells constituting a battery pack, a high-risk battery cell that has a risk that a terminal voltage during charging or a terminal voltage during discharging is out of an operating voltage, the battery management system comprising:

a state information calculator that calculates state information of each of the plurality of battery cells; and

a cell selector that selects the high-risk battery cell using the state information,

wherein the state information calculated by the state information calculator includes at least one of a state of charge (SoC) and a state of health (SoH),

wherein the cell selector selects the high-risk battery cell by using the state information of at least one of the SoC of each of the plurality of battery cells and the SoH of each of the plurality of battery cells; and

wherein the cell selector selects the high-risk battery cell by applying a change amount of the SoC according to the SoH of each of the plurality of battery cells to the SoC of each of the plurality of battery cells at a current measurement time point.

2. The battery management system of claim 1 , wherein the cell selector selects a battery cell to be fully charged first as the high-risk battery cell when applying the change amount of the SoC according to the SoH of each of the plurality of battery cells based on the SoC of each of the plurality of battery cells at the current measurement time point, and selects a battery cell to be fully discharged first as the high-risk battery cell when applying the change amount of the SoC according to the SoH of each of the plurality of battery cells based on the SoC of each of the plurality of battery cells at the current measurement time point.

3. The battery management system of claim 2 , wherein when a current flows into the selected high-risk battery cell at 1 C-rate based on the initial usable capacity of the plurality of battery cells, the cell selector calculates a representative SoH of the battery pack by applying the following Equation 1 to K which is a summed value of a time from the current measurement time point until the battery cell to be fully discharged first is fully discharged and a time from the current measurement time point until the battery cell to be fully charged first is fully charged,

SoH pack =K× 100   [Equation 1]

where SoH pack is the representative SoH of the battery pack, and the unit of K is time (hr).

4. The battery management system of claim 3 , further comprising:

a capacity calculator that calculates the actual usable capacity of the battery pack,

wherein the actual usable capacity of the battery pack calculated by the capacity calculator is calculated through the following Equation 2,

CP pack =SoH pack ×CP BOL    [Equation 2]

where CP pack is the actual usable capacity of the battery pack, SoH pack is the representative SoH of the battery pack, and CP BOL is the initial usable capacity of the battery cell.

5. The battery management system of claim 1 , wherein the cell selector selects a battery cell having the lowest SoH among the plurality of battery cells as the high-risk battery cell.

6. A battery management method using a battery management system for selecting, from a plurality of battery cells constituting a battery pack, a high-risk battery cell that has a risk that a terminal voltage during charging or a terminal voltage during discharging is out of an operating voltage, the battery management method comprising:

calculating state information of each of the plurality of battery cells; and

selecting the high-risk battery cell using the state information,

wherein the state information includes at least one of SoC and SoH, and the high-risk battery cell is selected by using the state information of at least one of the SoC of each of the plurality of battery cells and the SoH of each of the plurality of battery cells in the selecting of the high-risk battery cell, and

wherein the high-risk battery cell is selected by applying a change amount of the SoC according to the SoH of each of the plurality of battery cells to the SoC of each of the plurality of battery cells at a current measurement time point.

7. The battery management method of claim 6 , wherein in the selecting of the high-risk battery cell, a battery cell to be fully charged first is selected as the high-risk battery cell when applying the change amount of the SoC according to the SoH of each of the plurality of battery cells based on the SoC of each of the plurality of battery cells at the current measurement time point, and a battery cell to be fully discharged first is selected as the high-risk battery cell when applying the change amount of the SoC according to the SoH of each of the plurality of battery cells based on the SoC of each of the plurality of battery cells at the current measurement time point.

8. The battery management method of claim 6 , wherein in the selecting of the high-risk battery cell, a battery cell having a lowest SoH among the plurality of battery cells is selected as the high-risk battery cell.

9. The battery management method of claim 6 , further comprising:

after the selecting of the high-risk battery cell, calculating a representative SoH of the battery pack by applying the following Equation 3 to K which is a summed value of a time from the current measurement time point until the battery cell to be fully discharged first is fully discharged and a time from the current measurement time point until the battery cell to be fully charged first is fully charged, when a current flows into the selected high-risk battery cell at 1 C-rate based on the initial usable capacity of the plurality of battery cells,

SoH pack =K× 100   [Equation 3]

where SoH pack is the representative SoH of the battery pack, and the unit of K is time (hr).

10. The battery management method of claim 9 , further comprising:

after the calculating of the representative SoH of the battery pack, calculating the actual usable capacity of the battery pack through the following Equation 4,

CP pack =SoH pack ×CP BOL    [Equation 4]

wherein CP pack is the actual usable capacity of the battery pack, SoH pack is the representative SoH of the battery pack, and CP BOL is the initial usable capacity of the battery cell.

Assignments (2)
NUNC PRO TUNC ASSIGNMENT Recorded Nov 7, 2022
From: SK INNOVATION CO., LTD.
To: SK ON CO., LTD.
Reel/Frame 062034/0198 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 11, 2021
From: JEONG, DOO JIN; SEO, JEONG MIN; HWANG, KYU MIN; LEE, BYUNG EUN
To: SK INNOVATION CO., LTD.
Reel/Frame 055559/0749 →