IP Library Granted Patent US 11,675,320
Granted Patent B2
US 11,675,320 · App. 17/205,215 · Granted Jun 13, 2023

Systems and methods for controlling equipment operation using granular asset and general asset models to determine asset allocation

Inventors: John H. Burroughs (Wauwatosa, WI); Andrew J. Przybylski (Franksville, WI); Michael J. Wenzel (Grafton, WI); Matthew J. Ellis (Milwaukee, WI)
Assignee: Johnson Controls Tyco IP Holdings LLP
G05B13/041F24F11/49G05B13/04G05B15/02G05B19/418H04L12/28
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,675,320
App. No.
17/205,215
Granted
Jun 13, 2023
Kind
B2
Abstract

A method for controlling equipment includes grouping a plurality of granular assets to form one or more general assets and generating models of the general assets based on the granular assets that form the general assets. Each model corresponds to a general asset and defines a relationship between resources produced by the general asset and resources consumed by the general asset. The method includes performing a first control process using the models of the general assets to determine a first allocation of resources among the general assets. The first allocation defines amounts of the resources to be consumed, produced, or stored by each of the general assets. The method includes operating the equipment to consume, produce, or store the resources in accordance with the first allocation.

Claims (62)

1. A method for controlling equipment that operate to produce, consume, or store one or more resources, the method comprising:

grouping a plurality of granular assets to form one or more general assets, each of the granular assets representing one or more devices of the equipment, and each of the general assets comprising a plurality of the granular assets and representing a plurality of the devices of the equipment;

generating models of the general assets based on the granular assets that form the general assets, each model corresponding to a general asset and defining a relationship between one or more of the resources produced by the general asset and one or more of the resources consumed by the general asset;

performing a first control process using the models of the general assets to determine a first allocation of the one or more resources among the general assets, the first allocation defining amounts of the one or more resources to be consumed, produced, or stored by each of the general assets; and

operating the plurality of the devices of the equipment represented by the general assets to consume, produce, or store the amounts of the one or more resources defined by the first allocation.

2. The method of claim 1 , wherein generating the models of the general assets comprises, for each general asset, combining a plurality of granular models of the plurality of granular assets that form the general asset to create a combined model for the general asset.

3. The method of claim 1 , wherein generating the models of the general assets comprises, for each general asset:

obtaining resource production and consumption data for the plurality of granular assets that form the general asset; and

performing a regression process using the resource production and consumption data to determine a relationship between amounts of the one or more resources produced by the general asset and amounts of the one or more resources consumed by the general asset.

4. The method of claim 1 , further comprising:

obtaining a resource diagram defining a number and type of the plurality of granular assets and interconnections between the plurality of granular assets; and

using the resource diagram to perform at least one of grouping the plurality of granular assets to form the one or more general assets or generating the models of the general assets.

5. The method of claim 1 , wherein operating the plurality of the devices of the equipment to consume, produce, or store the amounts of the one or more resources defined by the first allocation comprises:

using the first allocation of the one or more resources among the general assets to formulate a second control process for each general asset;

performing the second control process for each general asset to determine a second allocation of the one or more resources among the plurality of granular assets that form the general asset, the second allocation defining amounts of the one or more resources to be consumed, produced, or stored by each of the granular assets that form the general asset; and

operating the equipment to consume, produce, or store the amounts of the one or more resources defined by the second allocation.

6. The method of claim 1 , wherein one or more of the general assets comprise multiple sub-general assets, each of the sub-general assets comprising a plurality of the granular assets; and

the method further comprises performing an intermediate control process for each general asset to determine an intermediate allocation of the one or more resources among the multiple sub-general assets within the general asset.

7. The method of claim 1 , further comprising:

generating constraints based on the first allocation defining the amounts of the one or more resources to be consumed, produced, or stored by each of the general assets; and

using one or more of the constraints that apply to a general asset to constrain a second control process for the general asset.

8. A controller for equipment that operate to produce, consume, or store one or more resources, the controller comprising one or more processing circuits configured to:

group a plurality of granular assets to form one or more general assets, each of the granular assets representing one or more devices of the equipment, and each of the general assets comprising a plurality of the granular assets and representing a plurality of the devices of the equipment;

generate models of the general assets based on the granular assets that form the general assets, each model corresponding to a general asset and defining a relationship between one or more of the resources produced by the general asset and one or more of the resources consumed by the general asset;

perform a first control process using the models of the general assets to determine a first allocation of the one or more resources among the general assets, the first allocation defining amounts of the one or more resources to be consumed, produced, or stored by each of the general assets; and

operate the plurality of the devices of the equipment represented by the general assets to consume, produce, or store the amounts of the one or more resources defined by the first allocation.

9. The controller of claim 8 , wherein generating the models of the general assets comprises, for each general asset, combining a plurality of granular models of the plurality of granular assets that form the general asset to create a combined model for the general asset.

10. The controller of claim 8 , wherein generating the models of the general assets comprises, for each general asset:

obtaining resource production and consumption data for the plurality of granular assets that form the general asset; and

performing a regression process using the resource production and consumption data to determine a relationship between amounts of the one or more resources produced by the general asset and amounts of the one or more resources consumed by the general asset.

11. The controller of claim 8 , wherein the one or more processing circuits are further configured to:

obtain a resource diagram defining a number and type of the plurality of granular assets and interconnections between the plurality of granular assets; and

use the resource diagram to perform at least one of grouping the plurality of granular assets to form the one or more general assets or generating the models of the general assets.

12. The controller of claim 8 , wherein operating the plurality of the devices of the equipment to consume, produce, or store the amounts of the one or more resources defined by the first allocation comprises:

using the first allocation of the one or more resources among the general assets to formulate a second control process for each general asset;

performing the second control process for each general asset to determine a second allocation of the one or more resources among the plurality of granular assets that form the general asset, the second allocation defining amounts of the one or more resources to be consumed, produced, or stored by each of the granular assets that form the general asset; and

operating the equipment to consume, produce, or store the amounts of the one or more resources defined by the second allocation.

13. The controller of claim 8 , wherein one or more of the general assets comprise multiple sub-general assets, each of the sub-general assets comprising a plurality of the granular assets; and

the method further comprises performing an intermediate control process for each general asset to determine an intermediate allocation of the one or more resources among the multiple sub-general assets within the general asset.

14. The controller of claim 8 , wherein the one or more processing circuits are further configured to:

generate constraints based on the first allocation defining the amounts of the one or more resources to be consumed, produced, or stored by each of the general assets; and

use one or more of the constraints that apply to a general asset to constrain a second control process for the general asset.

15. A method for controlling equipment that operate to produce, consume, or store one or more resources, the method comprising:

grouping a plurality of granular assets to form one or more general assets, each of the granular assets representing one or more devices of the equipment, and each of the general assets comprising a plurality of the granular assets and representing a plurality of the devices of the equipment;

performing a first control process to determine a first allocation of the one or more resources among the general assets, the first allocation defining amounts of the one or more resources to be consumed, produced, or stored by each of the general assets;

using the first allocation of the one or more resources among the general assets to formulate a second control process for each general asset;

performing the second control process for each general asset to determine a second allocation of the one or more resources among the plurality of granular assets that form the general asset, the second allocation defining amounts of the one or more resources to be consumed, produced, or stored by each of the granular assets that form the general asset; and

operating the plurality of the devices of the equipment to consume, produce, or store the amounts of the one or more resources defined by the second allocation.

16. The method of claim 15 , wherein:

the plurality of granular assets comprise one or more subplants configured to convert one or more input resources into one or more output resources, one or more storage devices configured to store one or more of the resources, and one or more sinks configured to consume one or more of the resources; and

at least one of the general assets comprises a plurality of the one or more subplants, the one or more storage devices, and the one or more sinks.

17. The method of claim 15 , wherein one or more of the general assets comprise multiple sub-general assets, each of the sub-general assets comprising a plurality of the granular assets; and

the method further comprises performing an intermediate control process for each general asset to determine an intermediate allocation of the one or more resources among the multiple sub-general assets within the general asset.

18. The method of claim 15 , further comprising:

generating constraints based on the first allocation defining the amounts of the one or more resources to be consumed, produced, or stored by each of the general assets; and

using one or more of the constraints that apply to a general asset to constrain the second control process performed for the general asset.

19. The method of claim 15 , further comprising:

obtaining a resource diagram defining a number and type of the plurality of granular assets and defining interconnections between the plurality of granular assets; and

using the resource diagram to group the plurality of granular assets to form the one or more general assets.

20. The method of claim 15 , further comprising:

generating a model of each general asset, the model defining a relationship between one or more of the resources produced by the general asset and one or more resources consumed by the general asset; and

using the model to perform the first control process.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 9, 2024
From: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
To: TYCO FIRE & SECURITY GMBH
Reel/Frame 067056/0552 →
NUNC PRO TUNC ASSIGNMENT Recorded Feb 4, 2022
From: JOHNSON CONTROLS TECHNOLOGY COMPANY
To: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
Reel/Frame 058959/0764 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 18, 2021
From: BURROUGHS, JOHN H.; PRZYBYLSKI, ANDREW J.; WENZEL, MICHAEL J.; ELLIS, MATTHEW J.
To: JOHNSON CONTROLS TECHNOLOGY COMPANY
Reel/Frame 055636/0282 →
Continuity (2)
Continuation 16415170 · May 17, 2019
Related Publication 20210208547A1 · Jul 8, 2021
Cited By (1)
US 12,710,186