IP Library Granted Patent US 11,629,806
Granted Patent B2
US 11,629,806 · App. 17/245,549 · Granted Apr 18, 2023

Method of installing liner assembly for pipeline repair or reinforcement, and liner assembly and steam generator for same

Inventors: Paul Corneil (Ajax, CA); Grant Duxbury (Ajax, CA); Cameron Manners (Ajax, CA)
Assignee: Aquam Corporation
F16L55/1654B29C63/0004B29C63/28B29C63/341B29C73/12F16L11/12F16L55/1656F16L55/18F22B1/285B29C35/049B29C49/26B29C63/0069B29C63/34B29C65/4835B29C66/301B29C66/52B29C66/612B29C73/10B29L2023/22E03F2003/065
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,629,806
App. No.
17/245,549
Granted
Apr 18, 2023
Kind
B2
Abstract

A method of installing a liner assembly for pipeline repair or reinforcement includes: pulling a prepared liner assembly into position in the pipeline, the liner assembly including a tubular liner wetted with a curable compound; introducing fluid into the inflatable bladder to bring the tubular liner into firm contact with an interior surface of the pipeline; flowing the fluid continuously through the bladder and discharging the fluid into the pipeline, while maintaining the liner assembly in an inflated condition; measuring a flow rate and a temperature of the fluid entering the bladder; calculating a time period sufficient for the tubular liner to cure based on: an amount of heat required for curing, based on dimensional information of the liner, and the measured flow rate and temperature of the fluid; and maintaining the liner assembly in an inflated condition for the time period sufficient for the tubular liner to cure.

Claims (17)

1. A method of installing a liner assembly for repair or reinforcement of a pipeline, the method comprising:

pulling the liner assembly into position in the pipeline, the liner assembly including an outer tubular liner and an inner inflatable bladder positioned longitudinally within the tubular liner, the tubular liner being wetted with a curable compound;

introducing fluid into the inflatable bladder so that the inflatable bladder expands to bring the tubular liner into firm contact with an interior surface of the pipeline;

flowing the fluid continuously through the bladder and discharging the fluid into the pipeline, while maintaining the liner assembly in an inflated condition;

measuring a flow rate and a temperature of the fluid entering the bladder;

calculating a time period sufficient for the tubular liner to cure based on:

an amount of total heat required for curing, based on dimensional information of the liner, and

the measured flow rate and the measured temperature of the fluid; and

maintaining the liner assembly in an inflated condition for the time period sufficient for the tubular liner to cure.

2. The method of claim 1 , further comprising deflating the inflatable bladder and retrieving at least a portion of the liner assembly from the pipeline.

3. The method of claim 1 , wherein the measuring further comprises measuring the flow rate and the temperature of the fluid using a temperature sensor and a flow rate meter, and wherein the calculating is carried out by a processing structure in communication with the temperature sensor and the flow rate meter.

4. The method of claim 3 , wherein the processing structure is a computer.

5. The method of claim 1 , further comprising:

measuring a temperature of the fluid being discharged into the pipeline, wherein the calculating of the time period is further based on:

a difference between the temperature of the fluid entering the bladder and the temperature of the fluid being discharged into the pipeline.

6. The method of claim 1 , wherein the curable compound is an epoxy, and the calculating of the time period is further based on:

thermal properties of the epoxy.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 15, 2023
From: AQUAM CORPORATION
To: NU FLOW TECHNOLOGIES 2000 INC.
Reel/Frame 064922/0103 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 26, 2021
From: CORNEIL, PAUL; DUXBURY, GRANT
To: AQUAM CORPORATION
Reel/Frame 058212/0483 →
EMPLOYMENT AGREEMENT Recorded Nov 26, 2021
From: MANNERS, CAMERON
To: AQUAM CORPORATION
Reel/Frame 058251/0382 →
Continuity (5)
Continuation 16420577 · May 23, 2019
Provisional Application 62808210 · Feb 20, 2019
Provisional Application 62678527 · May 31, 2018
Provisional Application 62675750 · May 23, 2018
Related Publication 20210254775A1 · Aug 19, 2021