IP Library Granted Patent US 11,473,025
Granted Patent B2
US 11,473,025 · App. 17/253,652 · Granted Oct 18, 2022

Method for processing biomass by co-grinding with a second biomass feedstock

Inventors: Thomas Plennevaux (Rueil-Malmaison, FR); Jeremy Gazarian (Rueil-Malmaison, FR); Laurent Bournay (Rueil-Malmaison, FR); Norbert Ullrich (Essen, DE); Michael Hecquet (Octeville sur Mer, FR)
Assignees: IFP Energies Nouvelles; Axens; Commissariat A L'Energie Atomique Et Aux Energies Alternatives; Total Raffinage Chimie; Thyssenkrupp Industrial Solutions AG; Avril; Bionext
C10J3/62C10B49/02C10B53/02C10B57/10C10B57/14C10L5/366C10L5/44C10L9/083C10J2300/0906C10J2300/0909C10J2300/0916C10L2200/0469C10L2290/08C10L2290/28
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,473,025
App. No.
17/253,652
Granted
Oct 18, 2022
Kind
B2
Abstract

The present invention concerns a process for the treatment of a feed comprising biomass, said process comprising at least the following steps: a) a step for drying said feed at a temperature in the range 20° C. to 180° C. for a period in the range 5 to 180 minutes, b) a step for torrefaction of the dried feed obtained from step a) in order to produce at least one solid torrefied biomass effluent, and c) a step for co-grinding the solid torrefied biomass effluent obtained from step b) in the presence of a second biomass feed in order to obtain a powder.

Claims (18)

1. A process comprising treatment of a first solid biomass feed, by the following:

a) drying said feed at a temperature in the range 20° C. to 180° C. for a period in the range 5 to 180 minutes,

b) torrefaction of the dried feed obtained from a) in order to produce at least one solid torrefied biomass effluent, and

c) co-grinding the solid torrefied solid biomass effluent obtained from b) in the presence of a second solid biomass feed in order to obtain a powder, and

d) final drying of powder obtained from c), carried out simultaneously with the co-grinding in c, in which the second solid biomass feed entering the co-grinding c) has a moisture content in the range 4 to 25% by weight.

2. The process as claimed in claim 1 , wherein in d) final drying of the powder obtained from c) is at a temperature in the range 100° C. to 300° C.

3. The process as claimed in claim 1 , in which the first and second solid biomass feed are solid lignocellulosic biomass.

4. The process as claimed in claim 1 , in which the first and second solid biomass feed are identical.

5. The process as claimed in claim 1 , comprising i) pre-treatment of the first solid biomass feed by primary grinding.

6. The process as claimed in claim 1 , in which the torrefaction b) is carried out at a temperature of 200° C. to 350° C., for a period of 5 to 180 minutes, and at an absolute operating pressure which is 0.01 to 1.5 MPa.

7. The process as claimed in claim 1 , comprising ii) combustion of the torrefaction gases obtained from b).

8. The process as claimed in claim 7 , in which the energy obtained from ii) combustion of the torrefaction gases is used to supply the necessary thermal energy to a), b) and/or d).

9. The process as claimed in claim 1 , in which the second solid biomass feed undergoes iii) preliminary drying and/or primary grinding.

10. The process as claimed in claim 1 , in which the solid torrefied biomass effluent obtained from b) is introduced into the co-grinding c) in a percentage by weight between the solid torrefied biomass effluent in the total solid feed of 1% to 99% by weight, said total solid feed being the sum of the solid torrefied biomass effluent and the second solid biomass feed.

11. The process as claimed in claim 1 , in which the second solid biomass feed entering the co-grinding c) has a moisture content in the range 5 to 20% by weight.

12. The process as claimed in claim 1 , comprising e) storing one or more effluents obtained from one or any of steps of the process.

13. The process as claimed in claim 1 , further comprising f) transport of effluent of c) or d).

14. The process as claimed in claim 1 , comprising g) gasification at a temperature in the range 800° C. to 1800° C. and at a pressure which is 2 to 12 MPa.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 5, 2023
From: TOTALENERGIES RAFFINAGE CHIMIE
To: TOTALENERGIES ONETECH
Reel/Frame 063941/0503 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 8, 2021
From: PLENNEVAUX, THOMAS; GAZARIAN, JEREMY; BOURNAY, LAURENT; ULLRICH, NORBERT; HECQUET, MICHAEL
To: IFP ENERGIES NOUVELLES; AXENS; COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES; TOTAL RAFFINAGE CHIMIE; THYSSENKRUPP INDUSTRIAL SOLUTIONS AG; AVRIL; BIONEXT
Reel/Frame 055864/0770 →
Priority Claims (1)
FR FR1855487 · Jun 21, 2018 · national
Continuity (1)
Related Publication 20210253963A1 · Aug 19, 2021