IP Library Granted Patent US 11,401,800
Granted Patent B2
US 11,401,800 · App. 17/259,835 · Granted Aug 2, 2022

Method for reservoir monitoring, method of preparing a reservoir, and reservoir adapted for monitoring

Inventors: Justin Tippit (Pasadena, TX); Chun-tian Zhao (Billingham Cleveland, GB)
Assignee: Johnson Matthey Public Limited Company
E21B47/11E21B43/14
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,401,800
App. No.
17/259,835
Granted
Aug 2, 2022
Kind
B2
Abstract

A method for monitoring the production from different zones/sections along a well bore in a subsurface reservoir to draw inferences regarding production gases emerging from the subsurface reservoir, comprising: dividing the reservoir into a plurality of different zones/sections along the well bore; in a completion stage, deploying along the well bore in each such zone/section a release system for the release of at least one oil and/or water tracer material, such that a unique tracer formulation is provided in association with each respective such zone section; in a production stage, producing fluid from the reservoir, separating, sampling and testing liquids from the produced fluid and detecting the tracer materials in the produced liquids, drawing inferences from the detected levels of the tracer materials in the produced liquids regarding the production gases emerging from the subsurface reservoir.

Claims (8)

1. A method for monitoring the production of tracers from different zones/sections along a well bore in a subsurface reservoir to monitor production gases emerging from the different zones/sections the subsurface reservoir, comprising:

dividing the reservoir into a plurality of different zones/sections along the well bore;

in a completion stage, deploying along the well bore in each such zone/section at least one release system for the release of at least one non-radioactive oil and/or water chemical tracer material, such that at least one unique tracer formulation is provided in association with each respective such zone/section;

in a production stage, producing fluid from the reservoir, separating, sampling and testing liquids from the produced fluid and detecting the tracer materials in the produced liquids to monitor gas production from each zone/section based on the detected levels of the tracer materials in the produced liquids emerging from the subsurface reservoir, wherein the reservoir production fluid from each respective zone/section comprises gaseous products and liquids and the detection of the tracer material in the produced liquids carried in the gaseous products is used to monitor gas production from each zone/section.

2. A method according to claim 1 wherein the reservoir production fluid is one in which gaseous products predominate.

3. A method according to claim 1 wherein there is deployed along the well bore in each defined zone/section a release system by means of which one or more tracers are deployed at a desired location in each zone to be released progressively over time into liquids carried in the production fluid during the production stage of operation.

4. A method according to claim 1 wherein the release system comprises one or more tracers immobilized at a desired location along the well bore, and the step of deploying a release system along the well bore in each zone/section comprises immobilizing one or more tracers at a desired location along the well bore in each such zone/section.

5. A method according to claim 1 wherein the release system comprises one or more tracers contained in a release formation such as to be eluted from the formation over time as fluid flows past or through the formation and the step of deploying a release system along the well bore in each zone/section comprises including one or more tracers in each of a plurality of release formations and locating at least one such release formation at a desired location along the well bore in each such zone/section.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 6, 2023
From: JOHNSON MATTHEY PLC
To: TRACERCO LIMITED
Reel/Frame 065178/0308 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 12, 2021
From: TIPPIT, JUSTIN; ZHAO, CHUN-TIAN
To: JOHNSON MATTHEY PUBLIC LIMITED COMPANY
Reel/Frame 054894/0959 →
Priority Claims (1)
GB 1813981 · Aug 28, 2018 · national
Continuity (2)
Provisional Application 62714181 · Aug 3, 2018
Related Publication 20210301651A1 · Sep 30, 2021
Cited By (3)
US 12,435,623 US 12,570,893 US 12,571,303