IP Library Granted Patent US 11,421,329
Granted Patent B2
US 11,421,329 · App. 17/272,835 · Granted Aug 23, 2022

Hydrogen production system

Inventors: Shinya Marushima (Yokohama, JP); Atsushi Tsutsumi (Yokohama, JP); Yoshimasa Ando (Yokohama, JP); Kazunori Fujita (Yokohama, JP); Tadateru Tanioka (Yokohama, JP)
Assignee: MITSUBISHI HEAVY INDUSTRIES, LTD.
C25B1/04C25B15/02C25B15/085F01K7/16F01K11/00F01K13/02F01K19/10F01K25/005F22B1/003F22B31/0076Y02E60/36Y02E70/30
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,421,329
App. No.
17/272,835
Granted
Aug 23, 2022
Kind
B2
Abstract

A hydrogen production system includes: a hydrogen production device connected to an electric power system and configured to produce hydrogen by electrolyzing pure water; an output control unit capable of controlling an amount of power supplied from the electric power system to the hydrogen production device according to request from the electric power system; a first pure water line for supplying pure water to the hydrogen production device; a first adjustment device capable of adjusting an amount of pure water supplied to the hydrogen production device via the first pure water line; and a first control unit configured to control the first adjustment device, based on a power amount signal indicating information on an amount of power supplied from the electric power system to the hydrogen production device.

Claims (38)

1. A hydrogen production system, comprising:

a hydrogen production device connected to an electric power system and configured to produce hydrogen by electrolyzing pure water;

an output control unit capable of controlling an amount of power supplied from the electric power system to the hydrogen production device according to request from the electric power system;

a first pure water line for supplying pure water to the hydrogen production device;

a first adjustment device capable of adjusting an amount of pure water supplied to the hydrogen production device via the first pure water line; and

a first control unit configured to control the first adjustment device, based on a power amount signal indicating information on an amount of power supplied from the electric power system to the hydrogen production device.

2. The hydrogen production system according to claim 1 , further comprising a power meter for measuring an amount of power supplied from the electric power system to the hydrogen production device,

wherein the power amount signal is an output signal of the power meter, and

wherein the first control unit is configured to control the first adjustment device based on the output signal of the power meter.

3. The hydrogen production system according to claim 1 ,

wherein the power amount signal is a control signal by which the output control unit controls an amount of power supplied to the hydrogen production device, and

wherein the first control unit is configured to control the first adjustment device based on the control signal of the output control unit.

4. The hydrogen production system according to claim 1 ,

wherein the first pure water line is connected to a second pure water line for supplying pure water to a steam cycle including a boiler and a steam turbine driven by steam of the boiler at a position downstream of the steam turbine and upstream of the boiler.

5. The hydrogen production system according to claim 4 , further comprising a hydrogen line for supplying hydrogen produced by the hydrogen production device to the boiler.

6. The hydrogen production system according to claim 5 , further comprising a hydrogen storage device for storing hydrogen produced by the hydrogen production device,

wherein a generator driven by the steam turbine is connected to the electric power system.

7. The hydrogen production system according to claim 4 , further comprising:

a pure water production device configured to produce pure water by removing an impurity from raw water to supply pure water to the second pure water line; and

a pure water tank for storing pure water produced by the pure water production device, the pure water tank being disposed upstream of a connection position between the second pure water line and the first pure water line and downstream of the pure water production device.

8. The hydrogen production system according to claim 4 , further comprising:

a second adjustment device capable of adjusting an amount of pure water supplied to the boiler via the second pure water line; and

a second control unit configured to control the second adjustment device, based on a first signal indicating information on an amount of pure water supplied from the first pure water line to the hydrogen production device.

9. The hydrogen production system according to claim 8 ,

wherein the second control unit is configured to be able to execute a limit mode which limits an amount of pure water supplied from the second pure water line to the boiler such that supply of pure water to the hydrogen production device is prioritized over supply of pure water to the steam cycle.

10. The hydrogen production system according to claim 9 ,

wherein, in the limit mode, the second control unit is configured to limit a period for supplying pure water to the steam cycle to a period during which supply of pure water to the hydrogen production device is stopped or to a period during which an amount of pure water supplied to the hydrogen production device is equal to or less than a reference amount.

11. The hydrogen production system according to claim 9 , further comprising:

a pure water tank for storing pure water produced by a pure water production device; and

a remaining amount detection unit for detecting a remaining amount of the pure water tank,

wherein the second control unit is configured to execute the limit mode when the remaining amount detected by the remaining amount detection unit falls below a reference value.

12. The hydrogen production system according to claim 8 , further comprising:

a blow-down water line for discharging blow-down water of the boiler;

a blow-down water amount adjustment device for adjusting an amount of blow-down water discharged from the blow-down water line; and

a blow-down water control unit configured to control the blow-down water amount adjustment device, based on a second signal indicating information on an amount of pure water supplied from the first pure water line to the hydrogen production device.

13. The hydrogen production system according to claim 12 , further comprising a water meter for measuring an amount of the blow-down water discharged from the blow-down water line,

wherein the first signal is an output signal of the water meter, and

wherein the second control unit is configured to control the second adjustment device based on the output signal of the water meter.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 6, 2022
From: MITSUBISHI POWER, LTD.
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 059519/0494 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 2, 2021
From: MARUSHIMA, SHINYA; TSUTSUMI, ATSUSHI; ANDO, YOSHIMASA; FUJITA, KAZUNORI; TANIOKA, TADATERU
To: MITSUBISHI POWER, LTD.
Reel/Frame 055461/0690 →
Priority Claims (1)
JP JP2018-167528 · Sep 7, 2018 · national
Continuity (1)
Related Publication 20210262100A1 · Aug 26, 2021