IP Library Granted Patent US 11,815,216
Granted Patent B2
US 11,815,216 · App. 17/351,575 · Granted Nov 14, 2023

System and method for installing pipe liners

Inventor: Alejandro Gutierrez Katze (Houston, TX)
Assignees: United Pipeline Systems, Inc.; United Pipeline De Mexico, SA. DE. CV
F16L55/1652F16L55/18F16N7/38F16N2210/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,815,216
App. No.
17/351,575
Granted
Nov 14, 2023
Kind
B2
Abstract

A method and apparatus for moving pipe rehabilitation objects, such as a pipe liner through a host pipeline. Flexible tubing is used to connect to the pipe rehabilitation object and to apply a force to cause the pipe rehabilitation objection to move through host pipeline. The flexible tubing is also capable of conveying a fluid, such as a lubricant through the tubing.

Claims (14)

1. A method of moving a pipe rehabilitation object through a host pipe having a length, the method comprising:

moving the pipe rehabilitation object along the length of the host pipeline by applying a force to tubing connected to the pipe rehabilitation object, so that the tubing transfers the force applied to the pipe rehabilitation object causing the pipe rehabilitation object to move along the length of the host pipe; and

delivering lubricant through the same tubing to which the force is applied to lubricate an inner surface of the host pipeline.

2. The method as set forth in claim 1 , wherein said delivering the lubricant is performed simultaneously with said moving the pipe rehabilitation object.

3. The method as set forth in claim 1 , wherein said delivering the lubricant is performed before said moving the pipe rehabilitation object.

4. The method as set forth in claim 1 , wherein said moving the pipe rehabilitation object comprises pulling the pipe rehabilitation through the host pipe using the tubing.

5. The method as set forth in claim 4 wherein pulling the pipe rehabilitation object includes winding the tubing onto a reel.

6. The method as set forth in claim 1 wherein moving the pipe rehabilitation object comprises moving a liner into the host pipe.

7. The method as set forth in claim 6 further comprising affixing a strain gauge on a pull head attached to the liner, connecting a communication line extending along the flexible tubing to the strain gauge, pulling the liner into the host pipeline by the tubing connected to the leading end of the liner; and while pulling the liner into the host pipeline, outputting a signal from the strain gauge representing strain on the liner to a control and/or monitoring device via the communication line extending along the flexible tube.

8. The method as set forth in claim 1 wherein moving the pipe rehabilitation object comprises moving at least one of a pipe preparation apparatus and a pipe inspection apparatus.

9. A method of moving a pipe rehabilitation object through a host pipe, the method comprising:

moving the pipe rehabilitation object into a host pipeline by tubing connected to the pipe rehabilitation object;

delivering lubricant through the tubing to lubricate an inner surface of the host pipeline; and

delivering fluid in the tubing to a sealed longitudinal section of a host pipeline to test hydrostatic pressure capacity of the longitudinal section of the host pipeline.

Assignments (5)
SECURITY INTEREST Recorded Jun 15, 2022
From: JEFFERIES FINANCE LLC
To: UNITED PIPELINE SYSTEMS, INC.
Reel/Frame 060214/0891 →
RELEASE OF SECURITY INTEREST Recorded Jun 15, 2022
From: JEFFERIES FINANCE LLC
To: UNITED PIPELINE SYSTEMS, INC.
Reel/Frame 060215/0290 →
SECURITY INTEREST Recorded Jun 15, 2022
From: UNITED PIPELINE SYSTEMS, INC.
To: BMO HARRIS BANK, N.A.
Reel/Frame 060216/0323 →
CORRECTIVE ASSIGNMENT TO CORRECT THE COVERSHEET DATA FROM ONE ASSIGNEE TO TWO ASSIGNEES PREVIOUSLY RECORDED AT REEL: 057781 FRAME: 0001. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Jan 5, 2022
From: KATZE, ALEJANDRO GUTIERREZ
To: UNITED PIPELINE SYSTEMS, INC.; UNITED PIPELINE DE MEXICO, S.A. DE C.V.
Reel/Frame 058645/0031 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 13, 2021
From: KATZE, ALEJANDRO GUTIERREZ
To: UNITED PIPELINE SYSTEMS, INC.
Reel/Frame 057781/0001 →