IP Library Patent Application 17356729
Patent Application
App. No. 17/356,729

SYSTEM AND METHOD FOR PARALLEL OBJECT MODIFICATION IN AN ENTERPRISE RESOURCE PLANNING APPLICATION

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
17/356,729
Abstract

A system for parallel object modification is disclosed. A request receiving module receives a processing request released from a first project executed at a first project wave landscape of the enterprise resource planning application. A parallel processing module instantiates one or more objects for parallel execution at a second project wave landscape. An object modification determination module detects one or more scenarios of modification of the one or more objects corresponding to the first project wave landscape and the second project wave landscape respectively, wherein the one or more scenarios includes a conflict scenario, a semi-computerized scenario and a non-conflict scenario. An object lock solution manager identifies one or more conflicted objects and one or more corresponding dependencies at the first project wave and the second project wave respectively, enables a taskforce in retrofitting of one or more modifications for attaining synchronization between the first project wave landscape and the second project wave landscape respectively.

Claims (27)

1 . A system for parallel object modification in an enterprise resource planning application, comprising:

a processing subsystem hosted on a server and configured to execute on a network to control bidirectional communications among a plurality of modules comprising:

a request receiving module configured to receive a processing request released from a first project executed at a first project wave landscape of the enterprise resource planning application;

a cross-system solution manager comprising:

a parallel processing module operatively coupled to the request receiving module, wherein the parallel processing module is configured to instantiate one or more objects for parallel execution at a second project wave landscape based on the processing request received from the first project wave landscape;

an object modification determination module operatively coupled to the parallel processing module, wherein the object modification module is configured to detect one or more scenarios of modification of the one or more objects corresponding to the first project wave landscape and the second project wave landscape respectively, wherein the one or more scenarios comprises a conflict scenario, a semi-computerized scenario and a non-conflict scenario;

an object lock solution manager operatively coupled to the object modification determination module and the parallel processing module, wherein the object lock solution manager is configured to:

identify one or more conflicted objects and one or more corresponding dependencies at the first project wave and the second project wave respectively when the conflict scenario and the semi-computerized scenario are detected; and

enable a taskforce in retrofitting of one or more modifications for attaining synchronization between the first project wave landscape and the second project wave landscape respectively based on the one or more conflicted objects and the one or more corresponding dependencies identified; and

a notification generation module operatively coupled to the object lock solution manager, wherein the notification generation module is configured to notify the taskforce to perform the retrofitting of the one or more modifications corresponding to a predefined project schedule for addressing cross project wave object locks via a notification means.

2 . The system as claimed in claim 1 , wherein the first project wave landscape comprises a primary project wave landscape for project execution of a plurality of enterprise resource projects.

3 . The system as claimed in claim 1 , wherein the second project wave landscape comprises a project wave with a second set of development and quality assurance structure to develop, configure or adjust a similar object corresponding to the primary landscape.

4 . The system as claimed in claim 1 , wherein the non-conflict scenario comprises synchronization of the object in the first project wave and the second project wave respectively with an indication of a first status.

5 . The system as claimed in claim 1 , wherein the semi-computerized scenario comprises checking a manual synchronization or an automated synchronization executable for the one or more conflicted objects identified by using a workbench set or a business configuration set of the enterprise resource planning application.

6 . The system as claimed in claim 5 , wherein the semi-computerized scenario is indicated by a second status.

7 . The system as claimed in claim 1 , wherein the conflict scenario is indicated by a third status.

8 . The system as claimed in claim 1 , wherein the object lock solution manager is configured to track of the one or more modifications or configurations associated with the first project wave and the second project wave respectively.

9 . The system as claimed in claim 1 , wherein the taskforce comprises a team comprising a technical, functional and a change advisory board to perform retrofitting of the one or more modifications for attaining synchronization when the one or more conflicted objects are identified in the first project wave and second project wave.

10 . The system as claimed in claim 1 , wherein the cross-system solution manager comprising a project management dashboard configured to represent statistics of at least one of a number of the one or more objects locking scenarios addressed, a number of the one or more objects locking scenarios unaddressed, work in progress, time saved, effort saved, cost saved, plan for one or more enterprise resource planning projects.

11 . The system as claimed in claim 1 , wherein the cross-system solution manager comprising a process mechanization module configured to execute one or more short-listed activities representative of retrofitting the one or more modifications assigned to the task force for attaining synchronization.

12 . A method comprising:

receiving, by a request receiving module, a processing request released from a first project executed at a first project wave landscape of the enterprise resource planning application;

instantiating, by a parallel processing module, one or more objects for parallel execution at a second project wave landscape based on the processing request received from the first project wave landscape;

detecting, by an object modification determination module, one or more scenarios of modification of the one or more objects corresponding to the first project wave landscape and the second project wave landscape respectively, wherein the one or more scenarios comprises a conflict scenario, a semi-computerized scenario and a non-conflict scenario;

identifying, by an object lock solution manager, one or more conflicted objects and one or more corresponding dependencies at the first project wave and the second project wave respectively when the conflict scenario and the semi-computerized scenario are detected;

enabling, by the object lock solution manager, a taskforce in retrofitting of one or more modifications for attaining synchronization between the first project wave landscape and the second project wave landscape respectively based on the one or more conflicted objects and the one or more corresponding dependencies identified; and

notifying, by a notification generation module, the taskforce to perform the retrofitting of the one or more modifications corresponding to a predefined project schedule for addressing cross project wave object locks via a notification means.

Assignments (4)
RELEASE OF SECURITY INTEREST Recorded Aug 6, 2025
From: FIFTH THIRD BANK, NATIONAL ASSOCIATION, AS ADMINISTRATIVE AGENT
To: MARLABS LLC
Reel/Frame 071951/0001 →
NOTICE OF GRANT OF SECURITY INTEREST IN PATENTS Recorded Jan 20, 2022
From: MARLABS LLC
To: FIFTH THIRD BANK, AS ADMINISTRATIVE AGENT
Reel/Frame 058785/0855 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 21, 2021
From: MARLABS INNOVATIONS PRIVATE LIMITED
To: MARLABS INCORPORATED
Reel/Frame 057856/0431 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 29, 2021
From: GARRE, RAVI KUMAR VENKATA RANGA; VISWAMBHARAN, KIRAN MANNUMKATTIL
To: MARLABS INNOVATIONS PRIVATE LIMITED
Reel/Frame 057631/0477 →