IP Library Granted Patent US 12,438,578
Granted Patent B2
US 12,438,578 · App. 17/376,505 · Granted Oct 7, 2025

Method for enabling efficient MIMO processing for O-RAN fronthaul interface in cloud RAN systems

Inventors: Wessam Afifi Ahmed (Plano, TX); Sung Joon Maeng (Raleigh, NC); Young-Han Nam (Plano, TX); Sridhar Rajagopal (Plano, TX)
Assignee: Mavenir Networks, Inc.
H04B7/0456H04B7/0452H04L5/0048H04W72/21
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,438,578
App. No.
17/376,505
Granted
Oct 7, 2025
Kind
B2
Abstract

A method of generating and applying combining weights to Physical Uplink Shared Channel (PUSCH) symbols for Open Radio Access Network (O-RAN) fronthaul interface between O-RAN radio unit (O-RU) and O-RAN distributed unit (O-DU) includes: calculating, by the O-DU, a codebook; sending, by the O-DU, the codebook to O-RU; generating, by the O-RU, an RU combiner matrix, using the codebook; applying, by the O-RU, the RU combiner matrix to In-phase and Quadrature (IQ) data to generate compressed IQ data; sending, by the O-RU, the compressed IQ data to O-DU; calculating, by the O-DU, a DU combiner matrix from compressed demodulation reference signal (DMRS); and applying, by the O-DU, the DU combiner matrix to data.

Claims (11)

1. A method of optimizing an uplink massive multiple input, multiple output (mMIMO) combining operation in an Open Radio Access Network (O-RAN) fronthaul interface between O-RAN radio unit (O-RU) and O-RAN distributed unit (O-DU), comprising:

splitting an uplink (UL) massive multiple input, multiple output (mMIMO) combiner into i) an O-RU combiner for the UL mMIMO residing in the O-RU and ii) an O-DU combiner for the UL mMIMO residing in the O-DU;

compressing, at the O-RU combiner, a first number of received signal streams and associated demodulation reference signal (DMRS) symbols from multiple antennas to a second number of signal streams and associated streams of compressed DMRS less than the first number of the received signal streams;

sending, by the O-RU combiner, the compressed second number of signal streams and associated streams of compressed DMRS to the O-DU via the fronthaul interface;

generating, at an MU-MIMO combiner generator of the O-DU, an MU-MIMO combiner matrix based on the streams of compressed DMRS;

sending, by the O-DU combiner, the generated MU-MIMO combiner matrix based on the streams of compressed DMRS to a O-RU combiner buffer;

implementing, at the O-DU combiner, multiuser, multiple input, multiple output (MU-MIMO) combining by applying the MU-MIMO combining matrix to the compressed second number of signal streams; and

reducing, by the O-DU combiner, the output streams of the MU-MIMO combining at the O-DU combiner to the number of users streams.

2. The method according to claim 1 , further comprising:

providing, by the O-RU to the O-DU, an indication of whether the O-RU supports a split UL mMIMO combining mode; and

configuring, by the O-DU, the O-RU to utilize the split UL mMIMO combining mode in the case the O-RU supports the split UL mMIMO combining mode.

Assignments (13)
RELEASE OF SECURITY INTEREST IN COLLATERAL RECORDED AT REEL 069115 AND FRAME 0815 Recorded Jul 31, 2025
From: GLAS USA LLC
To: MAVENIR NETWORKS, INC.
Reel/Frame 072307/0408 →
GRANT OF SECURITY INTEREST - PATENTS Recorded Jul 29, 2025
From: MAVENIR NETWORKS, INC.; MAVENIR SYSTEMS, INC.; ARGYLE DATA, INC.; MAVENIR, INC.; AQUTO CORPORATION; MAVENIR IPA UK LIMITED; MAVENIR SYSTEMS UK LIMITED; MAVENIR LTD.; MAVENIR US INC.
To: GLAS USA LLC
Reel/Frame 072245/0764 →
RELEASE OF SECURITY INTERESTS (SIDECAR) Recorded Jul 29, 2025
From: JPMORGAN CHASE BANK, N.A.
To: MAVENIR NETWORKS, INC.
Reel/Frame 072262/0363 →
RELEASE OF SECURITY INTERESTS (SYNDICATED) Recorded Jul 29, 2025
From: JPMORGAN CHASE BANK, N.A.
To: MAVENIR NETWORKS, INC.
Reel/Frame 072262/0409 →
RELEASE OF SECURITY INTEREST IN COLLATERAL RECORDED AT REEL 067554 AND FRAME 0789 Recorded Jul 29, 2025
From: WILMINGTON SAVINGS FUND SOCIETY, FSB
To: MAVENIR NETWORKS, INC.
Reel/Frame 072263/0211 →
SECURITY INTEREST Recorded Jul 28, 2025
From: MAVENIR NETWORKS, INC.; MAVENIR SYSTEMS, INC.; ARGYLE DATA, INC.; MAVENIR, INC.; AQUTO CORPORATION; MAVENIR IPA UK LIMITED; MAVENIR SYSTEMS UK LIMITED; MAVENIR LTD.; MAVENIR US INC.
To: BLUE TORCH FINANCE LLC
Reel/Frame 072268/0439 →
INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded Oct 4, 2024
From: MAVENIR NETWORKS, INC.
To: GLAS USA LLC
Reel/Frame 069115/0815 →
RELEASE OF SECURITY INTEREST RECORDED AT R/F 068453/0642 Recorded Oct 4, 2024
From: WILMINGTON SAVINGS FUND SOCIETY, FSB
To: MAVENIR NETWORKS, INC.
Reel/Frame 069117/0074 →
SECURITY INTEREST Recorded Aug 30, 2024
From: MAVENIR NETWORKS, INC.
To: WILMINGTON SAVINGS FUND SOCIETY, FSB
Reel/Frame 068453/0642 →
SECURITY INTEREST Recorded May 29, 2024
From: MAVENIR NETWORKS, INC.
To: WILMINGTON SAVINGS FUND SOCIETY, FSB
Reel/Frame 067554/0789 →
SECURITY AGREEMENT Recorded Jul 13, 2022
From: MAVENIR NETWORKS, INC.
To: JPMORGAN CHASE BANK, N.A.
Reel/Frame 060640/0125 →
SECURITY AGREEMENT Recorded Aug 18, 2021
From: MAVENIR NETWORKS, INC.
To: JPMORGAN CHASE BANK, N.A.
Reel/Frame 057221/0866 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 30, 2021
From: AHMED, WESSAM AFIFI; MAENG, SUNG JOON; NAM, YOUNG-HAN; RAJAGOPAL, SRIDHAR
To: MAVENIR NETWORKS, INC.
Reel/Frame 057038/0710 →
Continuity (2)
Provisional Application 63053967 · Jul 20, 2020
Related Publication 20220021423A1 · Jan 20, 2022
References Cited (13)
US 11528683B2 · Rhim · 2022 [cited by examiner]
US 20190174527A1 · Park et al. · 2019 [cited by applicant]
US 20210006371A1 · Raghothaman · 2021 [cited by examiner]
US 20220329289A1 · Huang · 2022 [cited by examiner]
WO WO2020256609A1 · 2020 [cited by examiner]
5G fundamental: functional split overview (Year: 2019). [cited by examiner]
3GPP TSG RAN WG3 NR#98 R3-174415, Further discussion on LLS (Year: 2017). [cited by examiner]
O-RAN-Next-Generation-Fronthaul-Conformance-Testing (Year: 2020). [cited by examiner]
Extended European Search Report for corresponding European application EP21186189.3, 18 pages, dated Apr. 4, 2022. [cited by applicant]
ORAN-WG4.CUS.0-v03.00 O-RAN Fronthaul Working Group “Control, User and Synchronization Plane Specification”, O-RAN Alliance, Apr. 2020. [cited by applicant]
ZTE “Further Discussion of LLS” 3GPP Draft; R3-174415 Further Discussion on LLS, 3rd Generation Partnership Project (3GPP); Nov. 2017. [cited by applicant]
Partial European Search Report for corresponding European application EP21186189.3, 14 pages, dated Dec. 22, 2021. [cited by applicant]
ORAN-WG4.CUS.0-v02.00 “O-RAN Fronthaul Working Group Control, User and Synchronization Plane Specification”, O-RAN Alliance, Aug. 2019. [cited by applicant]