IP Library Granted Patent US 11,624,682
Granted Patent B2
US 11,624,682 · App. 17/376,794 · Granted Apr 11, 2023

Sampling system and sampling method

Inventors: Jun Tsunoda (Yokohama, JP); Ryoichi Okura (Yokohama, JP); Kazuhiko Sato (Yokohama, JP)
Assignee: Mitsubishi Heavy Industries, Ltd.
G01N1/2035G01N2001/205
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,624,682
App. No.
17/376,794
Granted
Apr 11, 2023
Kind
B2
Abstract

To sample cooling water from a discharge pipe under vacuum, with a simple structure and without using a large-scale device. Provided is a sampling system for sampling cooling water flowing through a discharge pipe extending from a condenser to a sea. The sampling system includes: a bypass pipe branched off from the discharge pipe and joining the discharge pipe; two shutoff valves provided in the bypass pipe; a sampling pipe branched off from the bypass pipe between the two shutoff valves; a vent pipe branched off from the bypass pipe between the two shutoff valves; a sampling valve provided in the sampling pipe; and a vent valve provided in the vent pipe.

Claims (24)

1. A sampling system for sampling cooling water flowing through a discharge pipe extending from a condenser to a sea, the sampling system comprising:

a bypass pipe branched off from the discharge pipe and joining the discharge pipe;

two shutoff valves provided in the bypass pipe;

a sampling pipe branched off from the bypass pipe between the two shutoff valves;

a vent pipe branched off from the bypass pipe between the two shutoff valves;

a sampling valve provided in the sampling pipe;

a vent valve provided in the vent pipe;

a makeup water pipe connected to the bypass pipe;

a makeup water valve provided in the makeup water pipe;

an operating device that outputs an instruction signal for an instruction on sampling of the cooling water; and

a control unit that controls the two shutoff valves, the vent valve, the sampling valve, and the makeup water valve with the instruction signal from the operating device as a trigger, wherein

the two shutoff valves are normal open type power-driven on-off valves, whereas the vent valve, the sampling valve, and the makeup water valve are normal close type power-driven on-off valves, and

the control unit, when the instruction signal is inputted from the operating device, sequentially commands closure of the two shutoff valves,

opening of the sampling valve and the vent valve,

closure of the sampling valve,

opening of the makeup water valve,

closure of the makeup water valve,

closure of the vent valve, and

opening of the two shutoff valves.

2. The sampling system according to claim 1 , wherein the bypass pipe is disposed at a higher position than a tide level.

3. The sampling system according to claim 1 , wherein the sampling system is disposed at a lower position relative to the discharge pipe.

4. The sampling system according to claim 1 , wherein

an inlet of the bypass pipe projects into an inside of the discharge pipe and an opening of the inlet is toward an upstream side of the discharge pipe.

5. A sampling method for sampling cooling water flowing through a discharge pipe extending from a condenser to a sea by use of a sampling system, the method comprising: providing the sampling system, wherein the sampling system comprises: a bypass pipe branched off from the discharge pipe and joining the discharge pipe; two shutoff valves provided in the bypass pipe; a sampling pipe branched off from the bypass pipe between the two shutoff valves; a vent pipe branched off from the bypass pipe between the two shutoff valves; a sampling valve provided in the sampling pipe; and a vent valve provided in the vent pipe; opening the two shutoff valves, closing the sampling valve and the vent valve, and allowing the cooling water to flow into the bypass pipe, closing the two shutoff valves, opening the sampling valve and the vent valve, and sampling the cooling water sealed between the two shutoff valves from the sampling pipe, and, thereafter, closing the sampling valve and the vent valve, opening the two shutoff valves, and introducing the cooling water into the bypass pipe again.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 29, 2022
From: MITSUBISHI POWER, LTD.
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 059540/0704 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 16, 2021
From: TSUNODA, JUN; OKURA, RYOICHI; SATO, KAZUHIKO
To: MITSUBISHI POWER, LTD.
Reel/Frame 056896/0607 →