IP Library Granted Patent US 11,863,498
Granted Patent B2
US 11,863,498 · App. 17/397,112 · Granted Jan 2, 2024

User equipment and method for handling switching time period of downlink-uplink switching for half duplex-frequency division duplex operation

Inventors: Wan-Chen Lin (Taipei, TW); Hai-Han Wang (Taipei, TW); Chia-Hao Yu (Taipei, TW)
Assignee: FG Innovation Company Limited
H04L5/0092H04L5/001H04L5/16H04W72/044H04L5/0048H04L5/14H04W72/0453
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,863,498
App. No.
17/397,112
Granted
Jan 2, 2024
Kind
B2
Abstract

A user equipment and a method for handling a switching time period of downlink (DL)-uplink (UL) switching for half duplex-frequency division duplex operation are provided. The method includes: receiving a first configuration for a first active bandwidth part (BWP) with a first sub-carrier spacing (SCS), the first active BWP being one of an active UL BWP and an active DL BWP; receiving a second configuration for configuring a second active BWP with a second SCS, the second active BWP being another one of the active UL BWP and the active DL BWP; receiving a third configuration for the switching time period, the switching time period having a unit of symbol; performing communication with a Base Station (BS) on the first active BWP with the first SCS; and performing, after the switching time period, communication with the BS on the second active BWP with the second SCS.

Claims (33)

1. A method performed by a user equipment (UE) for handling a switching time period of downlink (DL)-uplink (UL) switching for a half duplex-frequency division duplex (HD-FDD) operation, the method comprising:

receiving a first configuration for a first active bandwidth part (BWP) with a first sub-carrier spacing (SCS), the first active BWP being one of an active UL BWP and an active DL BWP;

receiving a second configuration for a second active BWP with a second SCS, the second active BWP being another one of the active UL BWP and the active DL BWP;

receiving a third configuration for the switching time period, the switching time period having a unit of symbol or having an absolute value;

performing communication with a Base Station (BS) on the first active BWP with the first SCS; and

performing, after the switching time period, communication with the BS on the second active BWP with the second SCS, wherein:

the communication on the second active BWP begins at a first starting symbol,

the switching time period begins at a second starting symbol, and

the second starting symbol is determined based on the first starting symbol.

2. The method according to claim 1 , wherein the first SCS is larger than the second SCS.

3. The method according to claim 1 , wherein:

the first active BWP is the active DL BWP,

the second active BWP is the active UL BWP, and

the switching time period includes a timing advance (TA) time period.

4. The method according to claim 1 , wherein a length of the switching time period is determined based on the second SCS.

5. A user equipment (UE) for handling a switching time period of downlink (DL)-uplink (UL) switching for a half duplex-frequency division duplex (HD-FDD) operation, the UE comprising:

one or more non-transitory computer-readable media storing one or more computer-executable instructions; and

at least one processor coupled to the one or more non-transitory computer-readable media, the at least one processor is configured to execute the one or more computer-executable instructions to:

receive a first configuration for a first active bandwidth part (BWP) with a first sub-carrier spacing (SCS), the first active BWP being one of an active UL BWP and an active DL BWP;

receive a second configuration for a second active BWP with a second SCS, the second active BWP being another one of the active UL BWP and the active DL BWP;

receive a third configuration for the switching time period, the switching time period having a unit of symbol or having an absolute value;

perform communication with a Base Station (BS) on the first active BWP with the first SCS; and

perform, after the switching time period, communication with the BS on the second active BWP with the second SCS, wherein:

the communication on the second active BWP begins at a first starting symbol,

the switching time period begins at a second starting symbol, and

the second starting symbol is determined based on the first starting symbol.

6. The UE according to claim 5 , wherein

the first SCS is larger than the second SCS.

7. The UE according to claim 5 , wherein:

the first active BWP is the active DL BWP,

the second active BWP is the active UL BWP, and

the switching time period includes a timing advance (TA) time period.

8. The UE according to claim 5 , wherein a length of the switching time period is determined based on the second SCS.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 24, 2024
From: FG INNOVATION COMPANY LIMITED
To: SHARP KABUSHIKI KAISHA
Reel/Frame 069028/0232 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 9, 2021
From: LIN, WAN-CHEN; WANG, HAI-HAN; YU, CHIA-HAO
To: FG INNOVATION COMPANY LIMITED
Reel/Frame 057121/0202 →