IP Library Granted Patent US 11,437,205
Granted Patent B2
US 11,437,205 · App. 17/418,046 · Granted Sep 6, 2022

Method and device for monitoring operation of a switching device for controlled switching applications

Inventors: Soumya Kanta (Bangalore, IN); Urmil Parikh (Vadodara, IN); Michael Stanek (Gebenstorf, CH)
Assignee: Hitachi Energy Switzerland AG
H01H9/563G01R15/14G01R19/16538H01H7/16H01H33/593H01H71/125
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,437,205
App. No.
17/418,046
Granted
Sep 6, 2022
Kind
B2
Abstract

The invention relates to monitoring operation of a switching device in a power system, where a load is connected to a power source through the switching device. The load has windings, with coupling between at least one of two or more phases of a winding, and two or more windings of the load. The method includes obtaining measurements of at least one of voltages and currents, at one or more of a source and load side. Further, the method determines an electrical parameter associated with electrical switching of one or more poles. The parameter for each pole is determined based on at least one of voltage measurements at the source and load side, and line measurements associated with at least one winding. The values of the electrical parameter are monitored to determine the switching instant of the pole, for determining mechanical operating time deviation for estimating future switching instants.

Claims (47)

1. A method for monitoring operation of a switching device in a power system, the switching device comprising a plurality of poles connecting a coupled load to a power source, the method comprising:

obtaining, by a device, a measurement of a voltage at a source side from a measurement equipment connected to the device, and a measurement of a voltage at a load side from a second measurement equipment connected to the device, the coupled load comprising a plurality of windings, and a coupling between one of at least two phases of a winding of the plurality of windings and at least two windings of the plurality of windings;

determining at least one of:

a gap voltage associated with electrical switching of at least one pole of a plurality of poles of the switching device based on the measurement of the voltage at the source side and the measurement of the voltage at the load side, and

a line to line voltage of the at least one pole of the plurality of poles of the switching device based on a line measurement associated with at least one winding of the plurality of windings of the coupled load;

monitoring whether the gap voltage for the at least one pole meets a gap voltage threshold and whether the line to line voltage for the at least one pole meets a line to line voltage threshold during operation of another pole of the plurality of poles of the switching device;

determining an electrical switching instant for the at least one pole based on at least one of the gap voltage for the at least one pole meeting the gap voltage threshold and the line to line voltage for the at least one pole meeting the line to line voltage threshold during operation of another pole of the plurality of poles of the switching device; and

determining a mechanical operating time deviation for the at least one pole based on the electrical switching instant, for evaluating release instant of an output command of the switching device for operating the at least one pole of the switching device at the electrical switching instant.

2. The method of claim 1 , wherein the gap voltage for the at least one pole is determined based on a difference between the measurement of the voltage at the source side for a phase associated with the at least one pole and the measurement of the voltage at the load side for a phase associated with the at least one pole.

3. The method of claim 1 , wherein the line to line voltage is determined based on a line measurement of the voltage at the load side.

4. The method of claim 3 , wherein the line measurement provides at least one of the line to line voltage and line to ground voltage at the load side,

wherein the line measurement at the load side is at one of a primary side and a secondary side of the coupled load, and

wherein at least one of the primary side and the secondary side comprises at least one of a star ungrounded and a delta connected winding.

5. The method of claim 4 , wherein the line to line voltages are estimated based on at least one of a difference of the line measurements at the load side, and a transformation of the line measurements, wherein the transformation of the line measurements is used to determine winding voltages.

6. The method of claim 1 , wherein determining the electrical switching instant for the at least one pole based on the gap voltage for the at least one pole meeting the gap voltage threshold further comprises determining the electrical switching instant based on a determination that the gap voltage is zero and at least one of the source voltage and the load voltage is non zero during operation of the another pole of the plurality of poles.

7. The method of claim 1 , wherein determining the electrical switching instant for the at least one pole based on the line to line voltage for the at least one pole meeting the line to line voltage threshold further comprises at least one of determining that the load voltage becomes non zero during a switch on operation of another pole of the plurality of poles and determining that the load voltage becomes zero during a switch off operation of another pole of the plurality of poles.

8. A device for monitoring operation of a switching device in a power system, the device comprising:

an input interface for obtaining a measurement of a voltage at a source side from a first measurement equipment connected to the device and a measurement of a voltage at a load side of a coupled load from a second measurement equipment connected to the device, wherein the coupled load comprises a plurality of windings, and a coupling between one of at least two phases of a winding of the plurality of windings and at least two windings of the plurality of windings;

a calculator configured to determine:

a gap voltage associated with an electrical switching of at least one or a plurality of poles of the switching device based on the measurement of the voltage at the source side and the measurement of the voltage at the load side;

a monitor configured to:

monitor whether the gap voltage for the at least one pole meets a gap voltage threshold based on whether the gap voltage is zero and at least one of the source voltage and the load voltage is non zero during operation of another pole of the plurality of poles of the switching device,

determine an electrical switching instant for the at least one pole when the gap voltage for the at least one pole meets the threshold during operation of another pole of the plurality of poles of the switching device, and

determine a mechanical operating time deviation for the at least one pole based on the electrical switching instant, wherein the mechanical operating time deviation is used for evaluating release instant of an output command for operating the at least one pole of the switching device at desired electrical switching instant; and

an output interface for providing an output command to the switching device, the output command configured to operate the at least one pole of the switching device.

9. The device of claim 8 , wherein the device is a relay, and wherein each measurement equipment is a potential transformer, and wherein the relay receives voltage measurements from the potential transformers.

10. The device of claim 8 , wherein the device is a relay,

wherein obtaining the measurement of the voltage at the source side comprises the relay receiving the measurement of the voltage from the first measurement equipment, and

wherein obtaining the measurement of the voltage at the load side comprises the relay receiving the measurement of the voltage from the second measurement equipment.

11. The device of claim 10 , wherein the first measurement equipment comprises a first potential transformer configured to provide the measurement of the voltage at the source side to the relay, and

wherein the second measurement equipment comprises a second potential transformer configured to provide the measurement of the voltage at the load side to the relay.

12. A method for monitoring operation of a switching device in a power system, the switching device comprising a plurality of poles connecting a coupled load to a power source, the method comprising:

obtaining, by a device, a measurement of a voltage at a source side from a first measurement equipment connected to the device, and a measurement of a voltage at a load side from a second measurement equipment connected to the device, the coupled load comprising a plurality of windings, and a coupling between one of at least two phases of a winding of the plurality of windings and at least two windings of the plurality of windings;

determining a line to line voltage of at least one pole of the plurality of poles of the switching device based on a line measurement associated with at least one winding of the plurality of windings of the coupled load;

monitoring whether the line to line voltage for the at least one pole meets a line to line voltage threshold based on at least one of determining that the load voltage becomes non zero during a switch on operation of another pole of the plurality of poles and determining that the load voltage becomes zero during a switch off operation of another pole of the plurality of poles during operation of another pole of the plurality of poles of the switching device;

determining an electrical switching instant for the at least one pole based on the line to line voltage for the at least one pole meeting the line to line voltage threshold during operation of another pole of the plurality of poles of the switching device; and

determining a mechanical operating time deviation for the at least one pole based on the electrical switching instant, for evaluating release instant of an output command of the switching device for operating the at least one pole of the switching device at the electrical switching instant.

13. The method of claim 12 , wherein the line to line voltage is determined based on a line measurement of the voltage at the load side.

14. The method of claim 13 , wherein the line measurement provides at least one of the line to line voltage and line to ground voltage at the load side,

wherein the line measurement at the load side is at one of a primary side and a secondary side of the coupled load, and

wherein at least one of the primary side and the secondary side comprises at least one of a star ungrounded and a delta connected winding.

15. The method of claim 14 , wherein the line to line voltages are estimated based on at least one of a difference of the line measurements at the load side, and a transformation of the line measurements, wherein the transformation of the line measurements is used to determine winding voltages.

16. The method of claim 12 , wherein the device is a relay,

wherein obtaining the measurement of the voltage at the source side comprises the relay receiving the measurement of the voltage from the first measurement equipment, and

wherein obtaining the measurement of the voltage at the load side comprises the relay receiving the measurement of the voltage from the second measurement equipment.

17. The method of claim 16 , wherein the first measurement equipment comprises a first potential transformer configured to provide the measurement of the voltage at the source side to the relay, and

wherein the second measurement equipment comprises a second potential transformer configured to provide the measurement of the voltage at the load side to the relay.

Assignments (4)
MERGER Recorded Nov 13, 2023
From: HITACHI ENERGY SWITZERLAND AG
To: HITACHI ENERGY LTD
Reel/Frame 065549/0576 →
CHANGE OF NAME Recorded Dec 31, 2021
From: ABB POWER GRIDS SWITZERLAND AG
To: HITACHI ENERGY SWITZERLAND AG
Reel/Frame 058601/0692 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 24, 2021
From: KANTA, SOUMYA; PARIKH, URMIL; STANEK, MICHAEL
To: ABB SCHWEIZ AG
Reel/Frame 056657/0706 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 24, 2021
From: ABB SCHWEIZ AG
To: ABB POWER GRIDS SWITZERLAND AG
Reel/Frame 056657/0794 →
Priority Claims (1)
IN 201841049259 · Dec 27, 2018 · national
Continuity (1)
Related Publication 20220102087A1 · Mar 31, 2022