IP Library Patent Application 17420089
Patent Application
App. No. 17/420,089

CONTIGUOUS CONFIGURED AND GRANT-BASED UL TRANSMISSIONS ON NR-U SYSTEMS

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
17/420,089
Abstract

Systems, apparatuses, methods, and computer-readable media are provided for a user equipment (UE) for a wireless communication system operating in a licensed spectrum and an unlicensed spectrum. The UE performs a listen before transmission (LBT) procedure to acquire a channel for an uplink (UL) transmission upon determination that a first LBT priority class of a first order of UL transmission is not less than a second LBT priority class of a second order of UL transmission, and a maximum channel occupancy time (MCOT) corresponding to the first order of UL transmission is at least a total length of the UL transmission comprising a first length of the first order of uplink (UL) transmission and a second length of the second order of UL transmission. In response to acquiring the channel, the UE performs the first order of UL transmission, followed by the second order of UL transmission.

Claims (37)

1 . A user equipment (UE), the UE comprising:

processor circuitry configured to:

determine a first listen before transmission (LBT) priority class for a first order of uplink (UL) transmission and a second LBT priority class for a second order of UL transmission;

determine a total length of a UL transmission comprising a first length of the first order of UL transmission and a second length of the second order of UL transmission; and

upon determination that the first LBT priority class is at least equal to the second LBT priority class, and a maximum channel occupancy time (MCOT) corresponding to the first order of UL transmission is at least the total length of the UL transmission, perform an LBT procedure to acquire a channel for the UL transmission; and

radio front end circuitry, coupled to the processor circuitry, configured to:

in response to acquiring the channel, perform the UL transmission using the first order of UL transmission followed by the second order of UL transmission.

2 . The UE of claim 1 , wherein the first order of UL transmission is a configured grant (CG) transmission and the second order of UL transmission is a grant-based (GB) transmission, or the first order of UL transmission is the GB transmission and the second order of UL transmission is the CG transmission.

3 . The UE of claim 1 , wherein the first order of UL transmission and the second order of UL transmission are occurring in contiguous time instances, and wherein the second order of UL transmission is either after a time gap or no time gap from the first order of UL transmission.

4 . The UE of claim 1 , wherein the processor circuitry is further configured to:

terminate the first order of UL transmission without puncturing a tail of the first order of UL transmission.

5 . The UE of claim 1 , wherein the processor circuitry is further configured to terminate the first order of UL transmission without puncturing a tail of the first order of UL transmission by using a last two symbols for a subcarrier spacing (SCS).

6 . The UE of claim 1 , wherein the processor circuitry is further configured to:

select a priority class for the LBT procedure to acquire the MCOT to allow the first order of UL transmission followed by the second order of UL transmission without a time gap.

7 . The UE of claim 1 , wherein the processor circuitry is further configured to:

upon determination that the maximum channel occupancy time (MCOT) corresponding to the first order of UL transmission is less than the total length of the UL transmission, perform another LBT procedure before the second order of UL transmission.

8 . A method comprising:

determining, at a user equipment (UE) for a wireless communication system, a first listen before transmission (LBT) priority class for a first order of uplink (UL) transmission and a second LBT priority class for a second order of UL transmission;

determining, at the UE, a total length of a UL transmission comprising a first length of the first order of UL transmission and a second length of the second order of UL transmission;

upon determination that the first LBT priority class is at least equal to the second LBT priority class, and a maximum channel occupancy time (MCOT) corresponding to the first order of UL transmission is at least the total length of the UL transmission, performing, by the UE, an LBT procedure to acquire a channel for the UL transmission; and

in response to acquiring the channel, performing, by the UE, the UL transmission using the first order of UL transmission followed by the second order of UL transmission.

9 . The method of claim 8 , wherein the first order of UL transmission is a configured grant (CG) transmission and the second order of UL transmission is a grant-based (GB) transmission, or the first order of UL transmission is the GB transmission and the second order of UL transmission is the CG transmission.

10 . The method of claim 8 , wherein the first order of UL transmission and the second order of UL transmission are occurring in contiguous time instances, and wherein the second order of UL transmission is either after a time gap or no time gap from the first order of UL transmission.

11 . The method of claim 8 , further comprising terminating, by the UE, the first order of UL transmission without puncturing a tail of the first order of UL transmission.

12 . The method of claim 8 , further comprising terminating, by the UE, the first order of UL transmission without puncturing a tail of the first order of UL transmission by using a last two symbols for a subcarrier spacing (SCS).

13 . The method of claim 8 , further comprising selecting, by the UE, a priority class for the LBT procedure to acquire the MCOT to allow the first order of UL transmission followed by the second order of UL transmission without a time gap.

14 . The method of claim 8 , further comprising upon determination that the maximum channel occupancy time (MCOT) corresponding to the first order of UL transmission is less than the total length of the UL transmission, performing, by the UE, another LBT procedure before the second order of UL transmission.

15 . A non-transitory computer-readable media (CRM) comprising computer instructions, where upon execution of the computer instructions by one or more processors of a user equipment (UE), causes the one or more processors to:

determine a first listen before transmission (LBT) priority class for a first order of uplink (UL) transmission and a second LBT priority class for a second order of UL transmission;

determine a total length of a UL transmission comprising a first length of the first order UL transmission and a second length of second order UL transmission;

upon determination that the first LBT priority class is at least equal to the second LBT priority class, and a maximum channel occupancy time (MCOT) corresponding to the first order of UL transmission is at least the total length of the UL transmission, perform an LBT procedure to acquire a channel for the UL transmission; and

in response to acquiring the channel, perform the UL transmission using the first order of UL transmission followed by the second order of UL transmission.

16 . The non-transitory CRM of claim 15 , wherein the first order of UL transmission is a configured grant (CG) transmission and the second order of UL transmission is a grant-based (GB) transmission, or the first order of UL transmission is the GB transmission and the second order of UL transmission is the CG transmission.

17 . The non-transitory CRM of claim 15 , wherein the first order of UL transmission and the second order of UL transmission are occurring in contiguous time instances, and wherein the second order of UL transmission is either after a time gap or no time gap from the first order of UL transmission.

18 . The non-transitory CRM of claim 15 , wherein, upon execution, the computer instructions further cause the one or more processors to terminate the first order of UL transmission without puncturing a tail of the first order of UL transmission.

19 . The non-transitory CRM of claim 15 , wherein, upon execution, the computer instructions further cause the one or more processors to select a priority class for the LBT procedure to acquire the MCOT to allow the first order of UL transmission followed by the second order of UL transmission without a time gap.

20 . The non-transitory CRM of claim 15 , wherein, upon execution, the computer instructions further cause the one or more processors to perform another LBT procedure before the second order of UL transmission upon determining that the maximum channel occupancy time (MCOT) corresponding to the first order of UL transmission is less than the total length of the UL transmission.