IP Library Granted Patent US 12,306,224
Granted Patent B2
US 12,306,224 · App. 17/426,384 · Granted May 20, 2025

Electricity meter

Inventors: Andrew Dames (Cambridge, GB); Joseph Adam (Cambridge, GB); Jason Morgan (Cambridge, GB)
Assignees: SENSUS SPECTRUM LLC; SENSUS USA INC.
G01R21/133G01R21/06
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,306,224
App. No.
17/426,384
Granted
May 20, 2025
Kind
B2
Abstract

An electricity meter includes a converter configured to synchronously modulate current and voltage measurement signals and output synchronously-modulated current and voltage measurement signals and also includes a measurement module configured to receive the synchronously-modulated current and voltage measurement signals from the converter and to process the synchronously-modulated current and voltage measurement signals.

Claims (45)

1. An electricity meter comprising:

a converter configured to synchronously modulate current and voltage measurement signals and output synchronously-modulated current and voltage measurement signals wherein the converter comprises first and second modulators configured to synchronously modulate the current and voltage measurement signals, respectively, and to output the synchronously-modulated current and voltage measurement signals, respectively; and

a measurement module configured to receive the synchronously-modulated current and voltage measurement signals from the converter and to process the synchronously-modulated current and voltage measurement signals, wherein the measurement module comprises:

first and second analog-to-digital converters for digitizing the synchronously-modulated current and voltage measurement signals, respectively and outputting digitized, synchronously-modulated current and voltage measurement signals, wherein the first and second modulators comprise:

respective signal input(s) for the measurement signal(s);

respective timing reference inputs for receiving a timing reference;

respective switches arranged to be synchronously switched using the timing reference for chopping or inverting the measurement signal(s); and

respective modulated signal output(s) for the synchronously-modulated measurement signal(s).

2. The electricity meter of claim 1 , wherein the converter comprises:

a source of a time-varying signal used for synchronously modulating the current and voltage measurement signals.

3. The electricity meter of claim 2 , wherein the time-varying signal has at least one component that is fixed in frequency, or at least one component that varies in frequency, or at least one component that is fixed in frequency and at least one component that varies in frequency.

4. The electricity meter of claim 1 , wherein the converter is configured not to modulate or to modulate on average less than 10% of time at a fundamental frequency or a harmonic frequency of 50, 60 or 16.667, or at 400 Hz.

5. The electricity meter of claim 1 , wherein the converter is configured to modulate at frequency or frequencies between 51 and 59 Hz, between 61 and 65 Hz and/or between 67 and 390 Hz.

6. The electricity meter of claim 1 , wherein the first and second modulators comprise first and second bus exchange switches, respectively.

7. The electricity meter of claim 1 , wherein the first and second modulators comprise first and second sets of switching devices, respectively.

8. The electricity meter of claim 7 , wherein the first and second modulators comprise first and second sets of field effect transistors, respectively.

9. The electricity meter of claim 7 , wherein the first and second modulators comprise first and second sets of analog switches, respectively.

10. The electricity meter of claim 7 , wherein the first and second modulators comprise first and second sets of 4 quadrant analog multipliers, respectively.

11. The electricity meter of claim 1 , wherein the measurement module comprises:

a digital calculating unit to calculate a current value, a voltage value, a power value and/or an energy value.

12. The electricity meter of claim 11 , wherein the digital calculating unit is configured to calculate the power value by multiplying the digitised, synchronously-modulated current and voltage measurement signals.

13. The electricity meter of claim 1 , further comprising:

an input for receiving the current measurement signal from a remote current sensor or a current sensor arranged to provide the current measurement signal, or wherein a current sensor is de coupled to a modulator for modulating the current measurement signal.

14. The electricity meter of claim 13 , wherein the remote current sensor or current sensor is a shunt.

15. The electricity meter of claim 14 , further comprising:

first and second conductors for transferring power from a source to a load;

wherein the remote current or current sensor is configured to measure current flowing through the first conductor.

16. The electricity meter of claim 14 , further comprising:

first and second connections to the shunt for providing the current measurement signal; and

a modulator directly connected to the shunt via the first and second connections.

17. The electricity meter of claim 16 , wherein at least one of the first and second connections between the shunt and the modulator comprise the same material as the shunt.

18. The electricity meter of claim 13 , wherein the remote current sensor or current sensor is:

a Hall effect current sensor;

a flux gate current sensor;

an anisotropic magnetoresistance current sensor;

a giant magnetoresistance current sensor; or

a tunnelling magnetoresistance current sensor.

19. The electricity meter of claim 1 , which is a dc electricity meter.

20. An electricity meter comprising:

a converter configured to synchronously modulate current and voltage measurement signals and output synchronously-modulated current and voltage measurement signals wherein the converter comprises first and second modulators configured to synchronously modulate the current and voltage measurement signals, respectively, and to output the synchronously-modulated current and voltage measurement signals, respectively; and

a measurement module configured to receive the synchronously-modulated current and voltage measurement signals from the converter and to process the synchronously-modulated current and voltage measurement signals,

wherein the measurement module comprises:

first and second analog-to-digital converters for digitizing the synchronously-modulated current and voltage measurement signals, respectively and outputting digitized, synchronously-modulated current and voltage measurement signals,

wherein the electricity meter further comprises:

an input for receiving the current measurement signal from a remote current sensor or a current sensor arranged to provide the current measurement signal, or wherein a current sensor is de coupled to a modulator for modulating the current measurement signal, wherein the remote current sensor or current sensor is a shunt, and wherein at least one of the first and second connections between the shunt and the modulator comprise the same material as the shunt.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 16, 2025
From: SENTEC LIMITED
To: SENSUS SPECTRUM LLC; SENSUS USA INC.
Reel/Frame 070854/0779 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 12, 2022
From: DAMES, ANDREW; ADAM, JOSEPH; MORGAN, JASON
To: SENTEC LTD
Reel/Frame 060003/0198 →
Priority Claims (1)
GB 1901223 · Jan 29, 2019 · national
Continuity (1)
Related Publication 20220091167A1 · Mar 24, 2022
References Cited (21)
US 4920312A · Maruyama · 1990 [cited by applicant]
US 5736848A · De Vries · 1998 [cited by applicant]
US 5804979A · Lund · 1998 [cited by applicant]
US 6058354A · Adame · 2000 [cited by examiner]
US 6078870A · Windsheimer · 2000 [cited by applicant]
US 6275021B1 · Windsheimer · 2001 [cited by examiner]
US 9031116B2 · Young et al. · 2015 [cited by applicant]
US 9442005B2 · Fusco · 2016 [cited by examiner]
US 20030227401A1 · Yang · 2003 [cited by examiner]
US 20140253102A1 · Wood · 2014 [cited by examiner]
US 20160047849A1 · Perndl · 2016 [cited by examiner]
US 20160282399A1 · Veroni · 2016 [cited by applicant]
CN 1226968A · 1999 [cited by applicant]
CN 102934461A · 2013 [cited by applicant]
EP 0840896A1 · 1997 [cited by applicant]
WO 9704321A1 · 1997 [cited by applicant]
WO 9804926A1 · 1998 [cited by applicant]
WO 2015070927A1 · 2015 [cited by applicant]
International Preliminary Report on Patentability (Chapter 1 of the PCT), PCT/GB2020/050185 filed Jan. 28, 2020, mailed Aug. 12, 2021, 7 pages. [cited by applicant]
International Search Report and Written Opinion, PCT/GB2020/050185, mailed Apr. 17, 2020, 12 pages. [cited by applicant]
Chinese Search Report, Application No. 2020800116590, dated Feb. 28, 2024, 3 pages. [cited by applicant]