IP Library Granted Patent US 12,363,679
Granted Patent B2
US 12,363,679 · App. 17/440,028 · Granted Jul 15, 2025

Soft resource signaling in relay networks

Inventor: Honglei Miao (Cupertino, CA)
Assignee: Apple Inc.
H04W72/02H04W56/001H04W56/004H04W72/0446H04W72/51H04W88/14
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,363,679
App. No.
17/440,028
Granted
Jul 15, 2025
Kind
B2
Abstract

Disclosed are methods, systems, apparatus, and computer programs for determining in a new radio (NR) integrated access and backhaul (IAB) system a start symbol of available soft resources of an IAB node. In one aspect, a method includes determining, by a distributed unit (DU) of the IAB node and based on a configuration signal received from a central unit (CU) of an IAB donor, a configuration of available soft resources for a child link of the IAB node. The method further includes determining, based on the configuration of available soft resources, a start symbol of the available soft resources. The method also includes using the available soft resources for one or more child link transmissions starting from the start symbol.

Claims (46)

1. In an integrated access and backhaul (IAB) system comprising an IAB node and an IAB donor, a method comprising:

determining, by a distributed unit (DU) of the IAB node and based on a configuration signal received from a central unit (CU) of the IAB donor, a configuration of available soft resources for a child link of the IAB node;

determining, based on the configuration of available soft resources and at least one of a propagation delay of a parent link of the IAB node or an uplink timing advance of the parent link, a start symbol of the available soft resources; and

using the available soft resources for one or more child link transmissions starting from the start symbol;

wherein a transmission direction of a last used symbol in the parent link is downlink, wherein a transmission direction of the available soft resources is uplink, wherein the available soft resources overlap with the last used downlink symbol of the parent link, and wherein:

a downlink/uplink timing difference at the DU is greater than a downlink propagation delay of the parent link, wherein the last used downlink symbol of the parent link is at symbol index n, and wherein the start symbol of the available soft resources is at symbol index n+1, or

the downlink/uplink timing difference at the DU is less than the downlink propagation delay of the parent link, wherein the last used downlink symbol of the parent link is at symbol index n, and wherein the start symbol of the available soft resources is at symbol index n+2; or

wherein the transmission direction of the last used symbol in the parent link and the available soft resources is uplink, and wherein:

a sum of the downlink/uplink timing difference at the DU and an uplink timing advance of the parent link is less than a symbol duration, wherein the last used uplink symbol of the parent link is at symbol index n, and wherein the start symbol of the available soft resources is at symbol index n+1, or

the sum of the downlink/uplink timing difference at the DU and the uplink timing advance of the parent link is greater than the symbol duration, wherein the last used uplink symbol of the parent link is at symbol index n, and wherein the start symbol of the available soft resources is at symbol index n.

2. The method of claim 1 , wherein the configuration of available soft resources is applied relative to slot timing of the DU.

3. The method of claim 1 , wherein the configuration of available soft resources is indicated by the configuration signal on a symbol level per transmission direction if downlink and uplink timings of the DU are configured differently.

4. The method of claim 1 , wherein the start symbol is based on at least one of: a transmission direction of a last used symbol in a parent link of the IAB node, a resource type or transmission direction of soft resources in the child link, or the downlink/uplink timing difference at the DU.

5. The method of claim 4 , wherein the transmission direction of the parent link is downlink when the IAB node receives a transmission from a parent IAB node, the transmission direction of the parent link is uplink when the IAB node sends a transmission to the parent IAB node, a transmission direction of the child link is downlink when the IAB node sends a transmission to a child node, and a transmission direction of the child link is uplink when the IAB node receives a transmission from the child node.

6. The method of claim 1 , wherein the transmission direction of the last used symbol in the parent link of the IAB node and the available soft resources is downlink, wherein the available soft resources overlap with the last used downlink symbol of the parent link, wherein the last used downlink symbol of the parent link is at symbol index n, and wherein the start symbol of the available soft resources is at symbol index n+2.

7. The method of claim 1 , wherein a transmission direction of a last used symbol in the parent link is uplink, wherein a transmission direction of the available soft resources is downlink, wherein the available soft resources overlap with an uplink symbol of the parent link, wherein the last used downlink symbol of the parent link is at symbol index n, and wherein the start symbol of the available soft resources is at symbol index n+1.

8. The method of claim 1 , wherein the CU receives information indicative of guard symbols for the DU via an F1-AP interface message.

9. In an integrated access and backhaul (IAB) system including an IAB node and an IAB donor, a non-transitory computer-readable storage device having stored thereon instructions, which, when executed by a data processing apparatus, cause the data processing apparatus to perform operations comprising:

determining, by the IAB node and based on a configuration signal received from the IAB donor, a configuration of available soft resources for a child link of the IAB node;

determining, based on the configuration of available soft resources and at least one of a propagation delay of a parent link of the IAB node or an uplink timing advance of the parent link, a start symbol of the available soft resources; and

using the available soft resources for one or more child link transmissions starting from the start symbol;

wherein a transmission direction of a last used symbol in the parent link is downlink, wherein a transmission direction of the available soft resources is uplink, wherein the available soft resources overlap with the last used downlink symbol of the parent link, and wherein:

a downlink/uplink timing difference at the IAB node is greater than a downlink propagation delay of the parent link, wherein the last used downlink symbol of the parent link is at symbol index n, and wherein the start symbol of the available soft resources is at symbol index n+1, or

the downlink/uplink timing difference at the IAB node is less than the downlink propagation delay of the parent link, wherein the last used downlink symbol of the parent link is at symbol index n, and wherein the start symbol of the available soft resources is at symbol index n+2; or

wherein the transmission direction of the last used symbol in the parent link and the available soft resources is uplink, and wherein:

a sum of the downlink/uplink timing difference at the IAB node and an uplink timing advance of the parent link is less than a symbol duration, wherein the last used uplink symbol of the parent link is at symbol index n, and wherein the start symbol of the available soft resources is at symbol index n+1, or

the sum of the downlink/uplink timing difference at the LAB node and the uplink timing advance of the parent link is greater than the symbol duration, wherein the last used uplink symbol of the parent link is at symbol index n, and wherein the start symbol of the available soft resources is at symbol index n.

10. The non-transitory computer-readable storage device of claim 9 , wherein the configuration of available soft resources is applied relative to slot timing of the IAB node.

11. The non-transitory computer-readable storage device of claim 9 , wherein the configuration of available soft resources is indicated by the configuration signal on a symbol level per transmission direction if downlink and uplink timings of the IAB node are configured differently.

12. An integrated access and backhaul (IAB) system comprising:

an IAB node comprising a distributed unit (DU) and a mobile termination (MT), wherein the IAB node has a parent link and a child link;

an IAB donor comprising a central unit (CU); and

one or more processors and one or more storage devices storing instructions that are operable, when executed by the one or more processors, to cause the one or more processors to perform operations comprising:

determining, by the DU and based on a configuration signal received from the CU, a configuration of available soft resources for the child link;

determining, based on the configuration of available soft resources and at least one of a propagation delay of the parent link or an uplink timing advance of the parent link, a start symbol of the available soft resources; and

using the available soft resources for one or more child link transmissions starting from the start symbol;

wherein a transmission direction of a last used symbol in the parent link is downlink, wherein a transmission direction of the available soft resources is uplink, wherein the available soft resources overlap with the last used downlink symbol of the parent link, and wherein:

a downlink/uplink timing difference at the DU is greater than a downlink propagation delay of the parent link, wherein the last used downlink symbol of the parent link is at symbol index n, and wherein the start symbol of the available soft resources is at symbol index n+1, or

the downlink/uplink timing difference at the DU is less than the downlink propagation delay of the parent link, wherein the last used downlink symbol of the parent link is at symbol index n, and wherein the start symbol of the available soft resources is at symbol index n+2; or

wherein the transmission direction of the last used symbol in the parent link and the available soft resources is uplink, and wherein:

a sum of the downlink/uplink timing difference at the DU and an uplink timing advance of the parent link is less than a symbol duration, wherein the last used uplink symbol of the parent link is at symbol index n, and wherein the start symbol of the available soft resources is at symbol index n+1, or

the sum of the downlink/uplink timing difference at the DU and the uplink timing advance of the parent link is greater than the symbol duration, wherein the last used uplink symbol of the parent link is at symbol index n, and wherein the start symbol of the available soft resources is at symbol index n.

13. The system of claim 12 , wherein the one or more storage devices store instructions that are operable, when executed by the one or more processors, to cause the one or more processors to perform operations comprising:

using the available soft resources for one or more child link transmissions starting from the start symbol.

14. The system of claim 12 , wherein the configuration of available soft resources is applied relative to slot timing of the IAB node.

15. The system of claim 12 , wherein the configuration of available soft resources is indicated by the configuration signal on a symbol level per transmission direction if downlink and uplink timings of the IAB node are configured differently.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 20, 2022
From: INTEL CORPORATION
To: APPLE INC.
Reel/Frame 061730/0163 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 6, 2022
From: MIAO, HONGLEI
To: INTEL CORPORATION
Reel/Frame 061333/0578 →
Continuity (2)
Provisional Application 62853475 · May 28, 2019
Related Publication 20220182977A1 · Jun 9, 2022
References Cited (35)
US 20140029508A1 · Kim · 2014 [cited by examiner]
US 20190110266A1 · Abedini et al. · 2019 [cited by applicant]
US 20200128539A1 · Abedini · 2020 [cited by examiner]
US 20200145965A1 · Luo · 2020 [cited by examiner]
US 20200229271A1 · You · 2020 [cited by examiner]
US 20200351930A1 · Luo et al. · 2020 [cited by applicant]
US 20210368481A1 · Jo · 2021 [cited by examiner]
US 20210377922A1 · Luo · 2021 [cited by examiner]
US 20210377936A1 · Yuan · 2021 [cited by examiner]
US 20220060247A1 · Harada et al. · 2022 [cited by applicant]
US 20220078789A1 · Harada · 2022 [cited by examiner]
US 20220191893A1 · Miao · 2022 [cited by applicant]
US 20220217661A1 · Yokomakura · 2022 [cited by examiner]
US 20220217772A1 · Harada · 2022 [cited by examiner]
CN 115299150 · 2022 [cited by applicant]
WO WO2020144654 · 2020 [cited by applicant]
[No Author Listed] 3GPP TR 38.874 1.0.0 (2018-13), “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Study on Integrated Access and Backhaul (Release 15),” 111 pages. [cited by applicant]
[No Author Listed] 3GPP TR 38.874 v16.0.0 (Dec. 2018), “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Study on Intefrated Access and Backhaul (Release 16),” Dec. 2018, 111 p… [cited by applicant]
[No Author Listed] 3GPP TS 23.402 V15.3.0 (Mar. 2018), “3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Architecture enhancements for non-3GPP accesses (Release 15), ” Mar.… [cited by applicant]
[No Author Listed] 3GPP TS 38.211 V15.5.0 (Mar. 2019), “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical channels and modulation (Release 15),” Mar. 2019, 96 pages. [cited by applicant]
[No Author Listed] 3GPP TS 38.212 V15.5..0 (Mar. 2019), “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Multiplexing and channel coding (Release 15),” Mar. 2019, 101 pages. [cited by applicant]
[No Author Listed] 3GPP TS 38.213 V15.5.0 (Mar. 2019), “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical layer procedures for control (Release 15),” Mar. 2019, 104 pag… [cited by applicant]
[No Author Listed] 3GPP TS 38.300 V15.5.0 (Mar. 2019), “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Nr and NG-RAN Overall Description; Stage 2 (Release 15),” Mar. 2019, 97… [cited by applicant]
[No Author Listed] 3GPP TS 38.331 v15.5.0 (Mar. 2019), “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Radio Resource Control (RRC) protocol specification (Release 15),” Mar.… [cited by applicant]
[No Author Listed] 3GPP TS 38.473 v15.5.0 (Mar. 2019), “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NG-RAN; F1 application protocol (F1AP) (Release 15),” Mar. 2019, 198 pages. [cited by applicant]
Ericsson, “IAB resource configuration and coordination,” 3GPP TSG-RAN WG1 Meeting #96bis, R1-1904834, Xi'an, China, Apr. 8-12, 2019, 7 pages. [cited by applicant]
Nokia et al., “Mechanisms for resource multiplexing among backhaul and access links,” 3GPP TSG RAN WG1 #96bis, R1-1904642, Xi'an, China, Apr. 8-12, 2019, 16 pages. [cited by applicant]
PCT International Preliminary Report on Patentability in International Application No. PCT/US2020/034935, dated Nov. 16, 2021, 11 pages. [cited by applicant]
PCT International Preliminary Report on Patentability in International Application No. PCT/US2020/034968, dated Nov. 16, 2021, 10 pages. [cited by applicant]
PCT International Search Report and Written Opinion in International Application No. PCT/US2020/034935, dated Nov. 18, 2020, 19 pages. [cited by applicant]
PCT International Search Report and Written Opinion in International Application No. PCT/US2020/034968, dated Aug. 28, 2020, 16 pages. [cited by applicant]
PCT Invitation to Pay Additional Fees and, Where Applicable, Protest Fee in International Application No. PCT/US2020/034935, dated Sep. 14, 2020, 15 pages. [cited by applicant]
Qualcomm Incorporated, “Integrated Access and Backhaul for NR,” 3GPP TSG RAN meeting #84, RP-191037, Newport Beach, CA, USA, Jun. 3-6, 2019, 46 pages. [cited by applicant]
Qualcomm Incorporated, “Resource Management in IAB Network,” 3GPP TSG RAN WG1 Meeting #95, R1-1813419, Spokane, US, Nov. 12-16, 2018, 8 pages. [cited by applicant]
Huawei et al., “On resource coordination and dynamic scheduling in IAB,” 3GPP TSG RAN WG1 Meeting #95, R1-1812201, Spokane, WA, USA, Nov. 12-16, 2018, 5 pages. [cited by applicant]