IP Library Granted Patent US 11,662,794
Granted Patent B2
US 11,662,794 · App. 17/478,573 · Granted May 30, 2023

Using a predicted workload to improve preparedness of backup power source

Inventors: Jeremy Robert Carlson (Raleigh, NC); Philip John Jakes (Durham, NC); Charles C. Queen (Morrisville, NC)
Assignee: Lenovo (United States) Inc.
G06F1/30G06F1/3212
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,662,794
App. No.
17/478,573
Granted
May 30, 2023
Kind
B2
Abstract

An amount of power that is provided to a load is measured. The load is coupled to a battery backup unit (BBU) or an uninterruptable power supply (UPS). The amount of power is stored into a history of power draw for the load. The history of power draw is used to determine a time period or a situation when additional power is required by the load or reduced energy can be provided to the load. The charge of the BBU or the UPS is increased or reduced prior to the time period or the situation when the additional power is required by the load or the reduced energy can be provided to the load.

Claims (35)

1. A process comprising:

measuring an amount of power provided to a load, the load configured for coupling to a battery backup unit (BBU) or an uninterruptable power supply (UPS);

storing the amount of power into a history of power draw for the load;

using the history of power draw to determine a time period or a situation when additional power is required by the load or reduced energy can be provided to the load;

increasing a charge of the BBU or the UPS or reducing the charge of the BBU or the UPS prior to the time period or the situation when the additional power is required by the load or the reduced energy can be provided to the load; and

performing a maintenance procedure on the BBU or the UPS during the time period or the situation when the reduced energy can be provided to the load.

2. The process of claim 1 , wherein the amount of power provided to the load is provided by one or more of the BBU, the UPS, or an electric grid power source.

3. The process of claim 1 , wherein the amount of power provided to the load is measured by one or more of the BBU or the UPS.

4. The process of claim 1 , wherein the situation comprises an impending critical operation.

5. The process of claim 1 , wherein the load is coupled to the BBU or the UPS.

6. A non-transitory machine-readable medium comprising instructions that when executed by a processor executes a process comprising:

measuring an amount of power provided to a load, the load configured for coupling to a battery backup unit (BBU) or an uninterruptable power supply (UPS);

storing the amount of power into a history of power draw for the load;

using the history of power draw to determine a time period or a situation when additional power is required by the load or reduced energy can be provided to the load;

increasing a charge of the BBU or the UPS or reducing the charge of the BBU or the UPS prior to the time period or the situation when the additional power is required by the load or the reduced energy can be provided to the load; and

performing a maintenance procedure on the BBU or the UPS during the time period or the situation when the reduced energy can be provided to the load.

7. The non-transitory machine-readable medium of claim 6 , wherein the amount of power provided to the load is provided by one or more of the BBU, the UPS, or an electric grid power source.

8. The non-transitory machine-readable medium of claim 6 , wherein the amount of power provided to the load is measured by one or more of the BBU or the UPS.

9. The non-transitory machine-readable medium of claim 6 , wherein the situation comprises an impending critical operation.

10. The non-transitory machine-readable medium of claim 6 , wherein the load is coupled to the BBU or the UPS.

11. A system comprising:

a computer processor;

a computer memory coupled to the computer processor;

a load coupled to the computer processor; and

a battery backup unit (BBU) or an uninterrupted power supply (UPS) coupled to the load;

wherein the system is operable for:

measuring an amount of power provided to a load, the load configured for coupling to a battery backup unit (BBU) or an uninterruptable power supply (UPS);

storing the amount of power into a history of power draw for the load;

using the history of power draw to determine a time period or a situation when additional power is required by the load or reduced energy can be provided to the load;

increasing a charge of the BBU or the UPS or reducing the charge of the BBU or the UPS prior to the time period or the situation when the additional power is required by the load or the reduced energy can be provided to the load; and

performing a maintenance procedure on the BBU or the UPS during the time period or the situation when the reduced energy can be provided to the load.

12. The system of claim 11 , wherein the amount of power provided to the load is provided by one or more of the BBU, the UPS, or an electric grid power source.

13. The system of claim 11 , wherein the amount of power provided to the load is measured by one or more of the BBU or the UPS.

14. The system of claim 11 , wherein the situation comprises an impending critical operation.

15. The system of claim 11 , wherein the load is coupled to the BBU or the UPS.

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 20, 2025
From: LENOVO PC INTERNATIONAL LIMITED
To: LENOVO SWITZERLAND INTERNATIONAL GMBH
Reel/Frame 070269/0092 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 19, 2025
From: LENOVO (SINGAPORE) PTE LTD.
To: LENOVO PC INTERNATIONAL LIMITED
Reel/Frame 070266/0918 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 12, 2022
From: QUEEN, CHARLES C.
To: LENOVO (UNITED STATES) INC.
Reel/Frame 060025/0559 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 7, 2022
From: LENOVO (UNITED STATES) INC.
To: LENOVO (SINGAPORE) PTE. LTD.
Reel/Frame 059632/0312 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 17, 2021
From: CARLSON, JEREMY ROBERT; JAKES, PHILIP JOHN; QUEEN, CHARLES C.
To: LENOVO (UNITED STATES) INC.
Reel/Frame 057519/0801 →