IP Library Granted Patent US 11,319,791
Granted Patent B2
US 11,319,791 · App. 17/506,794 · Granted May 3, 2022

Methods and systems for detection and mitigation of well screen out

Inventors: Tony Yeung (Houston, TX); Ricardo Rodriguez-Ramon (Houston, TX); Joseph Foster (Houston, TX)
Assignee: BJ Energy Solutions, LLC
E21B43/267E21B21/08E21B43/12E21B43/26E21B43/2607G08B21/182
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,319,791
App. No.
17/506,794
Granted
May 3, 2022
Kind
B2
Abstract

Methods, systems, and controllers for detecting and mitigating well screen outs may include a controller configured to operate a fracturing pump to supply fluid at a discharge rate to a wellhead at a fracturing well site. The controller may also operate a blender positioned to deliver a blend of proppant and fluid to the fracturing pump. The controller may compare a fluid pressure increase rate to a preselected increase rate indicative of a potential well screen out. The controller may incrementally decrease the discharge rate of the fracturing pump and a flow rate of a blender when the fluid pressure increase rate of the wellhead exceeds the preselected increase rate and the fluid pressure is within a preselected percentage of a maximum wellhead pressure until the fluid pressure of the fluid supplied to the wellhead is stabilized.

Claims (27)

1. A wellsite hydraulic fracturing pumper system, the system comprising:

one or more fracturing pumps configured to pump fluid to a wellhead when positioned at a hydrocarbon well site;

one or more blenders configured to provide fluid and proppant to the one or more fracturing pumps;

one or more pressure transducers positioned at a location of one or more of: (a) adjacent an output of the one or more fracturing pumps, and (b) at the wellhead, the one or more pressure transducers each configured to measure a fluid pressure of the fluid provided to the wellhead; and

a controller to control the one or more fracturing pumps and the one or more blenders and positioned in signal communication with the one or more pressure transducers such that the controller receives the fluid pressure of the fluid provided to the wellhead, the controller (a) including memory, a processor to process data, and a screen out detection and mitigation protocol program stored in the memory and (b) being responsive to a process in which the screen out detection and mitigation protocol program of the controller incrementally decreases a discharge rate of the one or more fracturing pumps and a flow rate of the one or more blenders, in response to: (i) a fluid pressure increase rate of the fluid supplied to the wellhead being greater than a preselected increase rate, and (ii) the fluid pressure of the fluid provided to the wellhead being greater than a preselected percentage of a maximum wellhead pressure, until the fluid pressure is stabilized, the incrementally decrease of the discharge rate of the one or more fracturing pumps and the flow rate of the one or more blenders by the controller including stoppage of delivery of proppant to the one or more blenders prior to decreasing the discharge rate of the one or more fracturing pumps.

2. The wellsite hydraulic fracturing pumper system according to claim 1 , wherein the screen out detection and mitigation protocol includes an alarm to provide an alert indicative of when the fluid pressure increase rate is greater than the preselected increase rate before the pressure of the fluid provided to the wellhead is within the preselected percentage of the maximum wellhead pressure.

3. The wellsite hydraulic fracturing pumper system according to claim 2 , wherein the one or more pressure transducers also are positioned at a location adjacent the output of the one or more fracturing pumps.

4. The wellsite hydraulic fracturing pumper system according to claim 3 , wherein each of the one or more blenders includes a blender screw configured to rotate such that proppant is provided to the one or more fracturing pumps in response to rotation of the blender screw.

5. The wellsite hydraulic fracturing pumper system according to claim 1 , further comprising one or more blender flow meters configured to measure a flow of fluid from the one or more blenders.

6. The wellsite hydraulic fracturing pumper system according to claim 1 , wherein incrementally decreasing the discharge rate of the one or more fracturing pumps and the flow rate of the one or more blenders by the controller includes decreasing the discharge rate of the one or more fracturing pumps prior to decreasing the flow rate of the one or more blenders.

7. A wellsite hydraulic fracturing pumper system, the system comprising:

one or more fracturing pumps configured to pump fluid to a wellhead when positioned at a hydrocarbon well site;

one or more blenders configured to provide fluid and proppant to the one or more fracturing pumps;

one or more pressure transducers positioned at a location of one or more of: (a) adjacent an output of the one or more fracturing pumps, or (b) at the wellhead, the one or more pressure transducers each configured to measure a fluid pressure of the fluid provided to the wellhead;

one or more blender flow meters configured to measure a flow of fluid from the one or more blenders; and

a controller to control the one or more fracturing pumps and the one or more blenders and positioned in signal communication with the one or more pressure transducers such that the controller receives the fluid pressure of the fluid provided to the wellhead, the controller (a) including memory, a processor to process data, and a screen out detection and mitigation protocol program stored in the memory and (b) being responsive to a process in which the screen out detection and mitigation protocol program of the controller incrementally decreases a discharge rate of the one or more fracturing pumps and a flow rate of the one or more blenders, in response to: (i) a fluid pressure increase rate of the fluid supplied to the wellhead being greater than a preselected increase rate, and (ii) the fluid pressure of the fluid provided to the wellhead being greater than a preselected percentage of a maximum wellhead pressure, until the fluid pressure is stabilized, the incrementally decrease of the discharge rate of the one or more fracturing pumps and the flow rate of the one or more blenders by the controller including stoppage of delivery of proppant to the one or more blenders prior to decreasing the discharge rate of the one or more fracturing pumps.

8. The wellsite hydraulic fracturing pumper system according to claim 7 , wherein incrementally decreasing the discharge rate of the one or more fracturing pumps and the flow rate of the one or more blenders by the controller includes decreasing the discharge rate of the one or more fracturing pumps prior to decreasing the flow rate of the one or more blenders.

9. A wellsite hydraulic fracturing pumper system, the system comprising:

one or more fracturing pumps to pump fluid to a wellhead when positioned at a hydrocarbon well site;

one or more blenders to provide fluid and proppant to the one or more fracturing pumps;

one or more pressure transducers configured to be positioned at a location of one or more of: (a) adjacent an output of the one or more fracturing pumps, or (b) at the wellhead, and to measure a fluid pressure of the fluid when provided to the wellhead; and

a controller to control the one or more fracturing pumps and the one or more blenders and positioned in signal communication with the one or more pressure transducers such that the controller receives measurement of the fluid pressure of the fluid when provided to the wellhead, the controller (a) including memory, a processor to process data, and a screen out detection and mitigation protocol program stored in the memory and (b) being responsive to a process in which the screen out detection and mitigation protocol program of the controller incrementally decreases a discharge rate of the one or more fracturing pumps and a flow rate of the one or more blenders, in response to: (i) a fluid pressure increase rate of the fluid supplied to the wellhead being greater than a preselected increase rate, and (ii) the fluid pressure of the fluid provided to the wellhead being greater than a preselected percentage of a maximum wellhead pressure, the incrementally decrease of the discharge rate of the one or more fracturing pumps and the flow rate of the one or more blenders by the controller including stoppage of delivery of proppant to the one or more blenders prior to decreasing the discharge rate of the one or more fracturing pumps.

10. The wellsite hydraulic fracturing pumper system according to claim 9 , wherein the screen out detection and mitigation protocol includes an alarm to provide an alert indicative of when the fluid pressure increase rate is greater than the preselected increase rate before the pressure of the fluid provided to the wellhead is within the preselected percentage of the maximum wellhead pressure.

11. The wellsite hydraulic fracturing pumper system according to claim 10 , wherein the one or more pressure transducers also are positioned at a location adjacent the output of the one or more fracturing pumps.

12. The wellsite hydraulic fracturing pumper system according to claim 11 , wherein each of the one or more blenders includes a blender screw configured to rotate such that proppant is provided to the one or more fracturing pumps in response to rotation of the blender screw.

13. The wellsite hydraulic fracturing pumper system according to claim 9 , further comprising one or more blender flow meters configured to measure a flow of fluid from the one or more blenders.

14. The wellsite hydraulic fracturing pumper system according to claim 9 , wherein incrementally decreasing the discharge rate of the one or more fracturing pumps and the flow rate of the one or more blenders by the controller includes decreasing the discharge rate of the one or more fracturing pumps prior to decreasing the flow rate of the one or more blenders.

Assignments (5)
SECURITY INTEREST Recorded Sep 17, 2024
From: BJ ENERGY SOLUTIONS. LLC
To: ECLIPSE BUSINESS CAPITAL LLC. AS AGENT
Reel/Frame 068970/0125 →
SECURITY INTEREST Recorded Dec 13, 2022
From: BJ ENERGY SOLUTIONS, LLC
To: ECLIPSE BUSINESS CAPITAL LLC
Reel/Frame 062116/0333 →
SECURITY INTEREST Recorded Jan 27, 2022
From: BJ ENERGY SOLUTIONS, LLC
To: BAIWIN FINANCING, LLC
Reel/Frame 058888/0289 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 21, 2021
From: YEUNG, TONY; RODRIGUEZ-RAMON, RICARDO; FOSTER, JOSEPH
To: BJ SERVICES, LLC
Reel/Frame 057860/0860 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 21, 2021
From: BJ SERVICES, LLC
To: BJ ENERGY SOLUTIONS, LLC
Reel/Frame 057860/0893 →
Continuity (4)
Division 17303841 · Jun 9, 2021
Continuation 17182408 · Feb 23, 2021
Provisional Application 62705050 · Jun 9, 2020
Related Publication 20220042407A1 · Feb 10, 2022
Cited By (3)
US 12,196,067 US 12,359,547 US 12,385,379