IP Library Granted Patent US 11,814,952
Granted Patent B2
US 11,814,952 · App. 17/538,644 · Granted Nov 14, 2023

System and method to measure changes in the mud level and gas properties when drilling through a total loss zone with no returns to surface

Inventor: Krzysztof Karol Machocki (Aberdeen, GB)
Assignee: SAUDI ARABIAN OIL COMPANY
E21B47/08E21B21/08E21B47/047E21B47/06E21B33/064E21B47/003
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,814,952
App. No.
17/538,644
Granted
Nov 14, 2023
Kind
B2
Abstract

A method includes installing an influx device into a bell nipple. The influx device has an opening, a pumping port entrance, a pumping port exit, a measuring port entrance, and a measuring port exit. The pumping port exit is disposed in the annulus and the measuring port entrance is disposed adjacent the opening. The method further includes pumping a control gas, at a flow rate, from the pumping port entrance to the annulus using the pumping port exit, receiving the control gas at the measuring port exit using the measuring port entrance, detecting the control gas, using a gas measuring device connected to the measuring port exit, to determine a displacement time, and measuring the size of the void in the annulus using the flow rate and the displacement time.

Claims (16)

1. A system for an annulus, the system comprising:

a bell nipple having an inner diameter;

an influx device comprising a tubular body having a top end, a bottom end, and an outer circumferential surface, wherein the bottom end has an outer diameter smaller than the inner diameter of the bell nipple;

a pumping port entrance and a measuring port exit installed to the top end of the tubular body;

a pumping port exit and a measuring port entrance installed to the bottom end of the tubular body, wherein the pumping port exit is disposed within the annulus;

a gas measuring device connected to the measuring port exit; and

an opening machined proximate the bottom end of the tubular body, wherein the measuring port entrance is disposed adjacent to the opening.

2. The system of claim 1 , further comprising a pumping extension tube extending along the outer circumferential surface of the tubular body from the pumping port entrance to the pumping port exit.

3. The system of claim 1 further comprising a measuring extension tube extending along the outer circumferential surface of the tubular body from the measuring port entrance to the measuring port exit.

4. The system of claim 1 , wherein the bell nipple further comprises a fluid return flange.

5. The system of claim 4 , wherein the opening of the tubular body is aligned with the fluid return flange.

6. The system of claim 1 , wherein the bell nipple is connected to a blowout preventer.

7. The system of claim 1 , further comprising a seal element disposed around the outer circumferential surface of the influx device.

8. The system of claim 7 , wherein the seal element is sized to fit flush within the bell nipple.

9. The system of claim 1 , wherein the top end of the influx device comprises a flange connection.

10. The system of claim 9 , wherein the flange connection of the influx device mates with a corresponding flange connection on the bell nipple.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 25, 2023
From: ARAMCO OVERSEAS COMPANY UK LTD
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 065336/0505 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 6, 2022
From: MACHOCKI, KRZYSZTOF KAROL
To: ARAMCO OVERSEAS COMPANY UK LTD
Reel/Frame 059521/0756 →
Continuity (1)
Related Publication 20230167736A1 · Jun 1, 2023