IP Library Granted Patent US 12,066,472
Granted Patent B2
US 12,066,472 · App. 17/566,383 · Granted Aug 20, 2024

Calculating energy loss during an outage

Inventors: Sahil Maheswari (Belmont, CA); Sandeep Gupta (Menlo Park, CA); Jayesh Shah (Santa Clara, CA); Kate Wessels (Kensington, CA)
Assignee: SPARKCOGNITION, INC.
G01R21/00G01W1/10G01R22/06G01R31/003G01W1/18G06N20/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,066,472
App. No.
17/566,383
Granted
Aug 20, 2024
Kind
B2
Abstract

Calculating energy loss during an outage, including: determining that windspeed data indicating device windspeeds measured at an energy generating device are unavailable within a particular time duration; receiving meteorological data associated with a site location of the energy generating device, the meteorological data including meteorological windspeed data collected within the particular time duration; and predicting one or more estimated device windspeeds at the energy generating device during the particular time duration based on the meteorological data using a trained model for the energy generating device, the trained model being trained using a machine learning algorithm that utilizes historical meteorological windspeed data associated with the site location collected during a previous time duration and corresponding historical device windspeed data measured at the energy generating device during the previous time duration.

Claims (43)

1. A method, comprising:

receiving historical meteorological windspeed data associated with a site location of an energy generating device collected during a previous time duration;

receiving historical device windspeed data measured at the energy generating device during the previous time duration;

training, using a machine learning algorithm, a neural network using at least a portion of the historical meteorological windspeed data and the historical device windspeed data;

receiving an alert indicating that windspeed data indicating device windspeeds measured at the energy generating device are unavailable within a particular time duration;

receiving meteorological data associated with the site location of the energy generating device, the meteorological data including meteorological wind speed data collected within the particular time duration; and

predicting one or more estimated device windspeeds at the energy generating device during the particular time duration based on the meteorological data using the neural network for the energy generating device.

2. The method of claim 1 , further comprising:

determining a reference energy production value for the energy generating device during the particular time period based on the one or more estimated device windspeeds utilizing a reference energy production algorithm.

3. The method of claim 2 , wherein the reference energy production algorithm is based on one or more of an estimated windspeed of one or more near neighboring energy generating devices, a windspeed vs power curve associated with the energy generating device, or a machine learning algorithm.

4. The method of claim 2 , further comprising:

determining an estimated energy production loss for the energy generating device during the particular time period based on the reference energy production value.

5. The method of claim 4 , wherein the determining of the estimated energy production loss is responsive to receiving the alert indicating the unavailability of the device windspeeds during the particular time duration.

6. The method of claim 1 , wherein the particular time duration corresponds to a downtime event of the energy generating device.

7. The method of claim 1 , wherein the energy generating device comprises a wind turbine.

8. The method of claim 7 , wherein the estimated device windspeeds correspond to an estimated windspeed at a height of a turbine hub of the wind turbine.

9. A non-transitory computer-readable medium storing instructions, that when executed by at least one processor, cause the at least one processor to:

receive historical meteorological windspeed data associated with a site location of an energy generating device collected during a previous time duration;

receive historical device windspeed data measured at the energy generating device during the previous time duration;

train, using a machine learning algorithm, a neural network using at least a portion of the historical meteorological windspeed data and the historical device windspeed data;

receive an alert indicating that windspeed data indicating device windspeeds measured at the energy generating device are unavailable within a particular time duration;

receive meteorological data associated with the site location of the energy generating device, the meteorological data including meteorological windspeed data collected within the particular time duration; and

predict one or more estimated device windspeeds at the energy generating device during the particular time duration based on the meteorological data using the neural network for the energy generating device.

10. The non-transitory computer-readable medium of claim 9 , wherein the instructions further cause the at least one processor to:

determine a reference energy production value for the energy generating device during the particular time period based on the one or more estimated device windspeeds utilizing a reference energy production algorithm.

11. The non-transitory computer-readable medium of claim 10 , wherein the reference energy production algorithm is based on one or more of an estimated windspeed of one or more near neighboring energy generating devices, a windspeed vs power curve associated with the energy generating device, or a machine learning algorithm.

12. The non-transitory computer-readable medium of claim 10 , wherein the instructions further cause the at least one processor to:

determine an estimated energy production loss for the energy generating device during the particular time period based on the reference energy production value.

13. An apparatus, comprising:

at least one processor; and

at least one memory, the at least one memory storing instructions, that when executed by the at least one processor, cause the at least one processor to:

receive historical meteorological windspeed data associated with a site location of an energy generating device collected during a previous time duration;

receive historical device windspeed data measured at the energy generating device during the previous time duration;

train, using a machine learning algorithm, a neural network using at least a portion of the historical meteorological windspeed data and the historical device windspeed data;

receive an alert indicating that windspeed data indicating device windspeeds measured at the energy generating device are unavailable within a particular time duration;

receive meteorological data associated with the site location of the energy generating device, the meteorological data including meteorological windspeed data collected within the particular time duration; and

predict one or more estimated device windspeeds at the energy generating device during the particular time duration based on the meteorological data using the neural network for the energy generating device.

14. The apparatus of claim 13 , wherein the instructions further cause the at least one processor to:

determine a reference energy production value for the energy generating device during the particular time period based on the one or more estimated device windspeeds utilizing a reference energy production algorithm.

15. The apparatus of claim 14 , wherein the reference energy production algorithm is based on one or more of an estimated windspeed of one or more near neighboring energy generating devices, a windspeed vs power curve associated with the energy generating device, or a machine learning algorithm.

16. The apparatus of claim 14 , wherein the instructions further cause the at least one processor to:

determine an estimated energy production loss for the energy generating device during the particular time period based on the reference energy production value.

17. The apparatus of claim 14 , wherein the particular time duration corresponds to a downtime event of the energy generating device.

Assignments (2)
CHANGE OF NAME Recorded Jun 4, 2025
From: SPARKCOGNITION, INC.
To: AVATHON, INC.
Reel/Frame 071484/0156 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 22, 2022
From: MAHESWARI, SAHIL; GUPTA, SANDEEP; SHAH, JAYESH; WESSELS, KATE
To: SPARKCOGNITION, INC.
Reel/Frame 059065/0535 →
Continuity (1)
Related Publication 20230213560A1 · Jul 6, 2023