IP Library Granted Patent US 12,452,012
Granted Patent B2
US 12,452,012 · App. 17/593,734 · Granted Oct 21, 2025

Synchronization signal block (SSB) based beam measurement and reporting in 5G NR

Inventors: Zhibin Yu (Unterhacing, DE); Jie Cui (San Jose, CA); Yang Tang (San Jose, CA); Rui Huang (Beijing, CN); Qing Xu (Munich, DE)
Assignee: Apple Inc.
H04L5/0051H04L5/006
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,452,012
App. No.
17/593,734
Granted
Oct 21, 2025
Kind
B2
Abstract

A user equipment that selects at least one synchronization signal block (SSB) resource ID based on measurements of a second signal block, wherein the second signal block comprises a system information block (SIB) in 5G new radio (NR) that is spatially quasi co-located (QCLed) with the SSB resource ID, generates a beam reporting message including the selected SSB resource ID(s) and transmits the beam reporting message to a base station. A next generation NodeB (gNB) in a wireless network including the gNB and a UE that allocates downlink (DL) reference resources (RS) in a frequency range for the UE, wherein the DL comprise SIB occasions, each associated with a synchronization signal block (SSB) resource identification (ID) and receives reporting messages containing measurements by the UE for the DL RS.

Claims (29)

1. A method performed by a user equipment (UE), the method comprising:

selecting at least one synchronization signal block (SSB) resource ID based on measurements of a second signal block, wherein the second signal block comprises a system information block (SIB) in 5G new radio (NR) that is spatially quasi co-located (QCLed) with the selected SSB resource ID and wherein the UE sweeps multiple reception (RX) beam candidates over multiple SIB occasions QCLed with a same the SSB resource ID, wherein measurement metrics from the SIB are combined with measurement metrics from the selected SSB resource ID which is QCLed with the multiple SIB occasions;

generating a beam reporting message including the selected SSB resource ID; and

transmitting the beam reporting message to a base station.

2. The method of claim 1 , wherein the measurement of the SIB is based on at least one of a physical downlink control channel (PDCCH) demodulation reference signal (DMRS) and a physical downlink shared channel (PDSCH) DMRS within the SIB, and wherein the measurement metrics comprises a Layer 1 reference signal received power (L1-RSRP).

3. The method of claim 1 , wherein the measurements of the second signal block are for downlink (DL) reference resources (RS) allocated by the base station in a frequency range, wherein the frequency range comprises one of a first frequency range (FR1), having sub-6 GHz frequency bands, or a second frequency range (FR2), having millimeter (mm) wave bands.

4. The method of claim 3 , further comprising:

receiving or causing reception of a beam switching decision from the base station, wherein the beam switching decision is determined by the base station based on at least the beam reporting message; and

performing beam switching for the UE based on at least the beam switching decision.

5. The method of claim 1 , further comprising:

down-selecting a preferred SSB resource ID based on a measurement metric, wherein the measurement metric for the measurement of the SIB occasions comprises a Layer 1 reference signal received power (L1-RSRP).

6. A user equipment (UE), comprising:

one or more processors configured to:

select at least one synchronization signal block (SSB) resource ID based on measurements of a second signal block, wherein the second signal block comprises a system information block (SIB) in 5G new radio (NR) that is spatially quasi co-located (QCLed) with the selected SSB resource ID and wherein the UE sweeps multiple reception (RX) beam candidates over multiple SIB occasions QCLed with the SSB resource ID, wherein measurement metrics from the SIB are combined with measurement metrics from the selected SSB resource ID which is QCLed with the multiple SIB occasions,

generate a beam reporting message including the selected SSB resource ID; and

a transceiver configured to transmit the beam reporting message to a base station.

7. The UE of claim 6 , wherein the measurement of the SIB is based on at least one of a physical downlink control channel (PDCCH) demodulation reference signal (DMRS) and a physical downlink shared channel (PDSCH) DMRS within the SIB, and wherein the measurement metrics comprises a Layer 1 reference signal received power (L1-RSRP).

8. The UE of claim 6 , wherein the measurements of the second signal block are for downlink (DL) reference resources (RS) allocated by the base station in a frequency range, wherein the frequency range comprises one of a first frequency range (FR1), having sub-6 GHz frequency bands, or a second frequency range (FR2), having millimeter (mm) wave bands.

9. The UE of claim 8 , wherein the transceiver is further configured to receive or a beam switching decision from the base station, wherein the beam switching decision is determined by the base station based on at least the reporting message and the processor is further configured to perform beam switching for the UE based on at least the beam switching decision.

10. A method performed by a next generation NodeB (gNB) in a wireless network including the gNB and a user equipment (UE), the method comprising:

allocating downlink (DL) reference resources (RS) in a frequency range for the UE, wherein the DL RS comprise SIB occasions, each associated with a same synchronization signal block (SSB) resource identification (ID); and

receiving or causing reception of reporting messages from the UE comprising measurements of a system information block (SIB), wherein the UE sweeps multiple reception (RX) beam candidates over multiple SIB occasions QCLed with the same SSB resource ID, wherein measurement metrics from the SIB are combined with measurement metrics from the same SSB resource ID which is QCLed with the multiple SIB occasions.

11. The method of claim 10 , wherein the frequency range is one of a first frequency range (FR1) having sub-6 GHz frequency bands, or a second frequency range (FR2) having millimeter (mm) wave bands.

12. The method of claim 10 , further comprising:

determining a beam switching decision based on the reporting messages from the UE; and

transmitting the beam switching decision to the UE.

13. The method of claim 10 , wherein the measurements on the SIB occasions includes performing measurements on a physical downlink control channel (PDCCH) demodulation reference signal (DMRS) or a physical downlink shared channel (PDSCH) DMRS within a SIB occasion or over multiple SIB occasions.

14. The method of claim 10 , wherein a measurement metric for measurement of the SIB occasions comprises Layer 1 reference signal received power (L1-RSRP).

15. The method of claim 10 , wherein a number of measured SIB repetition occasions is based on at least a scaling factor defined by SSB-based measurement.