IP Library Granted Patent US 12,219,435
Granted Patent B2
US 12,219,435 · App. 17/685,862 · Granted Feb 4, 2025

Method and user equipment for management of MBS data reception

Inventors: Heng-Li Chin (Taipei, TW); Chia-Hung Lin (Taipei, TW); Hung-Chen Chen (Taipei, TW); Chia-Hung Wei (Taipei, TW); Yung-Lan Tseng (Taipei, TW)
Assignee: SHARP KABUSHIKI KAISHA
H04W4/06H04L1/08H04L1/1812H04W24/08H04W72/1263H04W76/28
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,219,435
App. No.
17/685,862
Granted
Feb 4, 2025
Kind
B2
Abstract

A method performed by a UE for management of MBS data reception is provided. The method includes receiving a DRX configuration mapped to an MBS, the DRX configuration including a timer and controlling activity of the UE for monitoring a PDCCH associated with a G-RNTI of the MBS; receiving a first DL assignment associated with the G-RNTI on the PDCCH; identifying an unsuccessful reception of a PDSCH that is scheduled by the first DL assignment and used for receiving data of the MBS; starting the timer after identifying the unsuccessful reception of the PDSCH; and enabling use of a C-RNTI to decode a second DL assignment while the timer is running. A UE using the method is also provided.

Claims (41)

1. A method performed by a User Equipment (UE) for management of Multicast-Broadcast Service (MBS) data reception, the method comprising:

receiving a first Discontinuous Reception (DRX) configuration mapped to an MBS, the first DRX configuration including a first timer for controlling activity of the UE for monitoring a Physical Downlink Control Channel (PDCCH) associated with a Group Radio Network Temporary Identifier (G-RNTI) of the MBS;

receiving a first Downlink (DL) assignment associated with the G-RNTI on the PDCCH;

identifying an unsuccessful reception of a Physical Downlink Shared Channel (PDSCH) that is scheduled by the first DL assignment and used for receiving data of the MBS;

starting the first timer after identifying the unsuccessful reception of the PDSCH;

enabling use of a Cell Radio Network Temporary Identifier (C-RNTI) to decode a second DL assignment while the first timer is running;

receiving a second DRX configuration that does not map to any MBS, the second DRX configuration including a second timer;

starting the second timer after identifying the unsuccessful reception of the PDSCH; and

enabling use of the C-RNTI to decode the second DL assignment while the second timer is running.

2. The method according to claim 1 , wherein the first timer is configured to determine a maximum duration until a retransmission of the data of the MBS is received.

3. The method according to claim 1 , wherein the second DL assignment schedules a retransmission of the data of the MBS.

4. The method according to claim 1 , wherein the first DL assignment and the second DL assignment are mapped to a same Hybrid Automatic Repeat Request (HARQ) process Identity (ID).

5. The method according to claim 1 , wherein the first DL assignment and the second DL assignment are scheduled on different PDCCHs or different search spaces.

6. The method according to claim 1 , further comprising: enabling use of the G-RNTI to decode a third DL assignment while the first timer is running.

7. The method according to claim 1 , wherein:

the UE is configured with a Packet Data Convergence Protocol (PDCP) entity associated with a first Radio Link Control (RLC) entity and a second RLC entity;

the first RLC entity is associated with the first DL assignment; and

the second RLC entity is associated with the second DL assignment.

8. The method according to claim 1 , wherein the UE is configured with a plurality of DRX configurations including the first DRX configuration and the second DRX configuration, and each DRX configuration in the plurality of DRX configurations is configured on a per-MBS basis.

9. A User Equipment (UE) for management of Multicast-Broadcast Service (MBS) data reception, the UE comprising:

at least one non-transitory computer-readable medium storing one or more computer-executable instructions; and

at least one processor coupled to the at least one non-transitory computer-readable medium and configured to execute the one or more computer-executable instructions to cause the UE to:

receive a first Discontinuous Reception (DRX) configuration mapped to an MBS, the first DRX configuration including a first timer for controlling activity of the UE for monitoring a Physical Downlink Control Channel (PDCCH) associated with a Group Radio Network Temporary Identifier (G-RNTI) of the MBS;

receive a first Downlink (DL) assignment associated with the G-RNTI on the PDCCH;

identify an unsuccessful reception of a Physical Downlink Shared Channel (PDSCH) that is scheduled by the first DL assignment and used for receiving data of the MBS;

start the first timer after identifying the unsuccessful reception of the PDSCH;

enable use of a Cell Radio Network Temporary Identifier (C-RNTI) to decode a second DL assignment while the first timer is running;

receive a second DRX configuration that does not map to any MBS, the second DRX configuration including a second timer;

start the second timer after identifying the unsuccessful reception of the PDSCH; and

enable use of the C-RNTI to decode the second DL assignment while the second timer is running.

10. The UE according to claim 9 , wherein the first timer is configured to determine a maximum duration until a retransmission of the data of the MBS is received.

11. The UE according to claim 9 , wherein the second DL assignment schedules a retransmission of the data of the MBS.

12. The UE according to claim 9 , wherein the first DL assignment and the second DL assignment are mapped to a same Hybrid Automatic Repeat Request (HARQ) process Identity (ID).

13. The UE according to claim 9 , wherein the first DL assignment and the second DL assignment are scheduled on different PDCCHs or different search spaces.

14. The UE according to claim 9 , wherein the at least one processor is further configured to execute one or more computer-executable instructions to:

enable use of the G-RNTI to decode a third DL assignment while the first timer is running.

15. The UE according to claim 9 , wherein:

the UE is configured with a Packet Data Convergence Protocol (PDCP) entity associated with a first Radio Link Control (RLC) entity and a second RLC entity;

the first RLC entity is associated with the first DL assignment; and

the second RLC entity is associated with the second DL assignment.

16. The UE according to claim 9 , wherein the UE is configured with a plurality of DRX configurations including the first DRX configuration and the second DRX configuration, and each DRX configuration in the plurality of DRX configurations is configured on a per-MBS basis.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 24, 2024
From: FG INNOVATION COMPANY LIMITED
To: SHARP KABUSHIKI KAISHA
Reel/Frame 069028/0594 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 3, 2022
From: CHIN, HENG-LI; LIN, CHIA-HUNG; CHEN, HUNG-CHEN; WEI, CHIA-HUNG; TSENG, YUNG-LAN
To: FG INNOVATION COMPANY LIMITED
Reel/Frame 059161/0496 →
Continuity (2)
Provisional Application 63156813 · Mar 4, 2021
Related Publication 20220286818A1 · Sep 8, 2022
References Cited (17)
US 20180110085A1 · Tseng · 2018 [cited by examiner]
US 20190261287A1 · Deenoo · 2019 [cited by examiner]
US 20190380078A1 · Fujishiro · 2019 [cited by examiner]
US 20200008097A1 · Fujishiro · 2020 [cited by examiner]
US 20220110184A1 · Jeon · 2022 [cited by examiner]
US 20220124675A1 · Liu · 2022 [cited by examiner]
US 20220132277A1 · Shrivastava · 2022 [cited by examiner]
US 20220232658A1 · Chen · 2022 [cited by examiner]
US 20230309121A1 · Wang · 2023 [cited by examiner]
US 20230345509A1 · Kadiri · 2023 [cited by examiner]
US 20230371046A1 · Babaei · 2023 [cited by examiner]
US 20230388972A1 · Chang · 2023 [cited by examiner]
3GPP TR 23.757, “3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Study on architectural enhancements for 5G multicast-broadcast services (Release 17)”, V1.2.0 (Nov. 2020). [cited by applicant]
3GPP TS 36.321, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Medium Access Control (MAC) protocol specification (Release 1… [cited by applicant]
3GPP TS 36.331, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Radio Resource Control (RRC); Protocol specification (Release… [cited by applicant]
3GPP TS 36.300, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRA… [cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Medium Access Control (MAC) protocol specification (Release 17), 3GPP TS 38.321 V17.0.0 (Mar. 2022). [cited by applicant]