Control system for building equipment with dynamic capacity constraints

Inventors: Michael J. Wenzel (Grafton, WI); Anas W. I. Alanqar (Milwaukee, WI); Matthew J. Asmus (Watertown, WI); Ryan A Baumgartner (Milwaukee, WI); Ryan C. Beaty (Milwaukee, WI); Shawn A. Schlagenhaft (Fond du Lac, WI); Homero L. Noboa (Waukesha, WI); Steven R. Vitullo (Milwaukee, WI)
Assignee: TYCO FIRE & SECURITY GMBH
G05B19/042H02J3/00G05B2219/2639
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,282,306
App. No.
17/733,786
Granted
Apr 22, 2025
Kind
B2
Abstract

A method includes providing a control algorithm that may include a constraint constraining production of the equipment below maximum values for a plurality of time steps, and dynamically adjusting the constraint by updating the maximum values as a function of predicted values of a dynamic variable for the plurality of time step. The dynamic variable affects an actual maximum production of the equipment. The method includes determining control decisions for the plurality of time steps by executing the control algorithm and controlling the equipment in accordance with the control decisions.

Claims (32)

1. A method for controlling equipment, comprising:

providing a control algorithm comprising a constraint comprising maximum values of production of the equipment for a plurality of time steps;

dynamically adjusting the constraint by updating the maximum values as a function of predicted values of a dynamic variable for the plurality of time steps, wherein the dynamic variable affects an actual maximum production of the equipment; and

determining control decisions for the plurality of time steps by executing the control algorithm; and

controlling the equipment in accordance with the control decisions.

2. The method of claim 1 , wherein the method further comprises predicting the predicted values of the dynamic variable based on a weather forecast.

3. The method of claim 1 , further comprising obtaining the predicted values of the dynamic variable from a weather forecast.

4. The method of claim 1 , wherein the equipment is a chiller and the dynamic variable is a proxy for lift.

5. The method of claim 1 , wherein the dynamic variable is an outdoor air temperature.

6. The method of claim 1 , further comprising:

obtaining standard equipment specification data published by a manufacturer and indicative of equipment performance under different operating conditions; and

finding parameters of the function based on the standard equipment specification data.

7. The method of claim 1 , further comprising affecting the dynamic variable by operating additional equipment, wherein executing the control algorithm further comprises determining additional control decisions for the additional equipment.

8. The method of claim 1 , wherein updating the maximum values as the function of the dynamic variable comprises applying the function to a value of the dynamic variable and a maximum consumption of the equipment.

9. The method of claim 8 , wherein the maximum consumption is a maximum electrical power usage of the equipment.

10. The method of claim 1 , wherein executing the control algorithm comprises performing an optimization subject to the constraint, wherein the control decisions are target values for the production of the equipment.

11. A system, comprising:

equipment operable to produce a resource; and

circuitry programmed to:

provide a control algorithm comprising a constraint comprising maximum values of production of the equipment for a plurality of time steps;

dynamically adjust the constraint by updating the maximum values as a function of predicted values of a dynamic variable for the plurality of time steps, wherein the dynamic variable affects an actual maximum production of the equipment; and

determine control decisions for the plurality of time steps by executing the control algorithm and

controlling the equipment in accordance with the control decisions.

12. The system of claim 11 , wherein the equipment is a chiller and the dynamic variable affects lift of the chiller.

13. The system of claim 11 , further comprising additional equipment configured to produce the resource, wherein the control algorithm allocates a demand for the resource across the equipment and the additional equipment.

14. The system of claim 11 , further comprising additional equipment operable to affect the dynamic variable, wherein the circuitry is programmed to coordinate operation of the equipment and the additional equipment based on a dependence of the dynamic variable on control decisions by the circuitry for the additional equipment.

15. The system of claim 11 , wherein the circuitry is further programmed to predict the predicted values of the dynamic variable based on a weather forecast.

16. The system of claim 11 , wherein the circuitry is further programmed obtain the predicted values of the dynamic variable from a weather forecast.

17. The system of claim 11 , wherein the dynamic variable is an outdoor air temperature.

18. The system of claim 11 , wherein updating the maximum values as the function of the dynamic variable comprises applying the function to a value of the dynamic variable and a maximum consumption of the equipment.

19. The system of claim 18 , wherein the maximum consumption is a maximum electrical power usage of the equipment.

20. The system of claim 11 , wherein executing the control algorithm comprises performing an optimization subject to the constraint, wherein the control decisions are target values for the production of the equipment.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 18, 2024
From: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
To: TYCO FIRE & SECURITY GMBH
Reel/Frame 066957/0796 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 15, 2022
From: WENZEL, MICHAEL J.; ALANQAR, ANAS W. I.; ASMUS, MATTHEW J.; BAUMGARTNER, RYAN A.; BEATY, RYAN C.; SCHLAGENHAFT, SHAWN A.; NOBOA, HOMERO L.; VITULLO, STEVEN R.
To: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
Reel/Frame 060216/0165 →