IP Library Granted Patent US 11,885,216
Granted Patent B2
US 11,885,216 · App. 17/769,695 · Granted Jan 30, 2024

Perforating and tracer injection system for oilfield applications

Inventors: Timothy E. Lagrange (Lacombe, CA); David Chastain (Brookshire, TX); Shaun Geerts (Joshua, TX); Joe McClanahan (Weatherford, TX); Gary Bablitz (Calgary, CA)
Assignee: CORE LABORATORIES LP
E21B47/11E21B43/117
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,885,216
App. No.
17/769,695
Granted
Jan 30, 2024
Kind
B2
Abstract

A method for completing a subterranean formation includes conveying a perforator assembly into a borehole drilled in the subterranean formation. The perforator assembly includes at least one shaped charge and at least one tracer package that includes at least one fluid production tracer material and a tracer injector. The method further includes forming at least one tunnel in a production structure by detonating one or more shaped charges and injecting the at least one fluid production tracer material into the formation using the tracer injector after the detonation of the at least one shaped charge. The at least one production tracer material physically associates with at least one resident fluid in the subterranean formation.

Claims (20)

1. A method for completing a subterranean formation having a borehole and a production structure, comprising:

conveying a perforator assembly into a borehole drilled in the subterranean formation, wherein the perforator assembly includes at least one shaped charge and at least one tracer package, wherein the tracer package includes at least one fluid production tracer material and a tracer injector, wherein the tracer injector includes a gas generating material;

forming at least one tunnel in the production structure by detonating one or more shaped charges;

initiating the gas generating material using an activation energy released by the detonation of the shaped charges; and

injecting the at least one fluid production tracer material into the formation using a high-pressure gas generated by the gas generating material, wherein the at least one production tracer material is configured to physically associate with at least one resident fluid in the subterranean formation.

2. The method of claim 1 , wherein the gas generating material is a propellant material.

3. The method of claim 2 , wherein the at least one fluid production tracer material is dispersed in the propellant material.

4. The method of claim 2 , wherein all of the at least one fluid production tracer material is physically separate from the propellant.

5. The method of claim 1 , wherein the at least one fluid production tracer material is a solid.

6. The method of claim 1 , wherein the at least one fluid production tracer material is a fluid.

7. The method of claim 6 , wherein the at least one fluid production tracer material is enclosed in separate enclosure from the tracer injector.

8. The method of claim 7 , wherein the at least one fluid production tracer material is one of: (i) a liquid, and (ii) a gas.

9. An apparatus for marking a selected location in a subterranean formation, comprising:

a least one shaped charge configured to generate a perforating jet, wherein detonation of the at least one shaped charge releases thermal energy and shock waves; and

a tracer package including:

at least one fluid production tracer; and

a tracer injector positioned adjacent to the at least one shaped charge, the tracer injector configured to inject the at least one fluid production tracer material into the subterranean formation, wherein the tracer injector includes a gas generating material configured to be initiated by an activation energy released by the detonation of the at least one shaped charge, wherein a high-pressure gas generated by the gas generating material is selected to inject the at least one fluid production tracer material into the subterranean formation.

10. The apparatus of claim 9 , wherein the gas generating material is a propellant material.

11. The apparatus of claim 10 , wherein the at least one fluid production tracer material is dispersed in the propellant material.

12. The apparatus of claim 10 , wherein all of the at least one fluid production tracer material is physically separate from the propellant.

Assignments (3)
SECURITY INTEREST Recorded Jul 26, 2025
From: CORE LABORATORIES LP; OWEN OIL TOOLS LP
To: BANK OF AMERICA, N.A., AS COLLATERAL AGENT
Reel/Frame 072243/0293 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 20, 2023
From: LAGRANGE, TIMOTHY E.; CHASTAIN, DAVID; GEERTS, SHAUN; MCCLANAHAN, JOE; BABLITZ, GARY
To: CORE LABORATORIES LP
Reel/Frame 065299/0858 →
SECURITY INTEREST Recorded Nov 21, 2022
From: CORE LABORATORIES LP; OWEN OIL TOOLS LP
To: BANK OF AMERICA, N.A., AS COLLATERAL AGENT
Reel/Frame 061975/0571 →
Continuity (2)
Provisional Application 62923115 · Oct 18, 2019
Related Publication 20220381140A1 · Dec 1, 2022
Cited By (1)
US 12,631,078