IP Library Granted Patent US 12,250,635
Granted Patent B2
US 12,250,635 · App. 17/783,093 · Granted Mar 11, 2025

Method for power efficient data transmission

Inventors: Volker Breuer (Boetzow, DE); Florian Denzin (Berlin, DE)
Assignee: Telit Cinterion Deutschland GmbH
H04W52/0251H04W52/0225
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,250,635
App. No.
17/783,093
Granted
Mar 11, 2025
Kind
B2
Abstract

Provided is a method for data transmission from a user equipment to a remote server by means of a base station of a cellular network, wherein the user equipment is configured to carry out payload data transmission to said remote server. It comprises: carrying out a first signaling data transmission to the base station, determining a first power value representative of the power spent for said first signaling data transmission, maintaining the first power value as reference value, carrying out a second signaling data transmission to the base station, and determining a second power value representative of the power spent for said second signaling data transmission. In case said second power value exceeds said first power value by a predetermined threshold value, it delays the next payload data transmission for a predetermined time.

Claims (49)

1. A method for data transmission from a user equipment to a remote server by means of a base station of a cellular network, wherein the user equipment is configured to carry out payload data transmission to said remote server, the method comprising the steps of:

carrying out a first signaling data transmission (TAU 1 ) to the base station,

determining a first power value representative of the power spent for said first signaling data transmission (TAU 1 ),

maintaining the first power value (PV 1 ) as reference value,

carrying out a second signaling data transmission (TAU 2 ) to the base station,

determining a second power value (PV 2 ) representative of the power spent for said second signaling data transmission (TAU 2 ), and

when said second power value (PV 2 ) exceeds said reference power value by a predetermined threshold value, delaying the payload data transmission (DP 1 ) for a predetermined time.

2. The method according to claim 1 , further comprising,

after the step of determining a first power value (PV 1 ), the step of activating a power saving mode at the user equipment, and

deactivating said power saving mode before the step of carrying out the second signaling data transmission (TAU 2 ).

3. The method according to claim 2 , wherein the delay for the payload data transmission (DP 1 ) lasts at least after conducting a third signaling data transmission (TAU 3 ) to the base station.

4. The method according to claim 2 ,

wherein the delay lasts shorter than the next power saving mode is activated.

5. The method according to claim 4 ,

further comprising the step of amending the predetermined threshold value considering at least one out of the group:

carrying out said payload data transmission (DP 1 ),

delaying said payload data transmission (DP 1 ).

6. The method according to claim 5 , further comprising the step of amending the reference value considering at least two determined power values indicative of the power spend for said signaling data transmission.

7. The method according to claim 4 , wherein the user equipment is further maintaining a maximum delay tolerance value, wherein the method comprises the step of carrying out the payload data transmission (DP 1 ) in case the expired delay exceeds the maximum delay tolerance value.

8. The method according to claim 7 ,

further comprising the step of amending at least one out of the group of:

the delay tolerance value,

the predetermined threshold value, and

power saving mode duration,

when the payload data transmission (DP 1 ) is carried out due to exceeding the maximum delay tolerance.

9. A user equipment for data transmission to a remote server by means of a base station of a cellular network, wherein the user equipment is configured to regularly carrying out payload data transmission (DP 1 ) to said remote server, further configured to:

carry out a first signaling data transmission (TAU 1 ) to the base station,

determine a first power value (PV 1 ) representative of the power spent for said first signaling data transmission (TAU 1 ),

maintaining the first power value (PV 1 ) as reference power value,

carry out a second signaling data transmission (TAU 2 ) to the base station,

determine a second power value (PV 2 ) representative of the power spent for said second signaling data transmission (TAU 2 ),

when said second power value (PV 2 ) exceeds said reference power value by a predetermined threshold value, delay the payload data transmission (DP 1 ) for a predetermined time.

10. The user equipment according to claim 9 , further configured to:

activate, after the step of determining a first power value (PV 1 ), a power saving mode at the user equipment, and

deactivate said power saving mode before the step of carrying out the second signaling data transmission (TAU 2 ).

11. The user equipment according to claim 9 , further configured that the delay for the payload data transmission (DP 1 ) lasts at least after conducting a third signaling data transmission (TAU 3 ) to the base station.

12. The user equipment according to claim 11 ,

further configured to amend the predetermined threshold value considering at least one out of the group:

carrying out said payload data transmission (DP 1 ),

delaying said payload data transmission (DP 1 ).

13. The user equipment according to claim 12 ,

further configured to amend the reference power value considering at least two determined values indicative of the power spend for said signalling data transmission.

14. The user equipment according to claim 13 , further configured to maintain a maximum delay tolerance value, and to carry out the payload data transmission (DP 1 ) in case the expired delay exceeds the maximum delay tolerance value.

15. The user equipment according to claim 14 ,

further configured to amend at least one out of the group of:

the delay tolerance value,

the predetermined threshold value, and

power saving mode duration,

when the payload data transmission (DP 1 ) is carried out due to exceeding the maximum delay tolerance.

Assignments (2)
CHANGE OF NAME Recorded Jul 19, 2023
From: THALES DIS AIS DEUTSCHLAND GMBH
To: TELIT CINTERION DEUTSCHLAND GMBH
Reel/Frame 064334/0326 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 10, 2022
From: BREUER, VOLKER; DENZIN, FLORIAN
To: THALES DIS AIS DEUTSCHLAND GMBH
Reel/Frame 060156/0769 →
Priority Claims (1)
EP 19214520 · Dec 9, 2019 · regional
Continuity (1)
Related Publication 20230014097A1 · Jan 19, 2023
References Cited (6)
US 20070091836A1 · Oprescu-Surcobe · 2007 [cited by examiner]
US 20090227278A1 · Cho · 2009 [cited by examiner]
US 20150173073A1 · Lindoff et al. · 2015 [cited by applicant]
US 20180249419A1 · Zhang · 2018 [cited by examiner]
EP 2670069A1 · 2013 [cited by applicant]
International Search Report (PCT/ISA/210) and Written Opinion (PCT/ISA/237) mailed on Feb. 11, 2021 by the European Patent Office as the International Searching Authority for International Application No. PCT/EP2020/084… [cited by applicant]