IP Library Granted Patent US 12,165,786
Granted Patent B2
US 12,165,786 · App. 17/793,062 · Granted Dec 10, 2024

Air-cooled air-to-air bushing

Inventors: Dan Gustavsson (Ludvika, SE); Simon Lindgren (Borlänge, SE); Jan Kogner (Västerljung, SE); Richard Natz (Borlänge, SE); Zoltan Repasi (Västerås, SE); Thomas Eriksson (Ludvika, SE)
Assignee: HITACHI ENERGY LTD
H01B17/54H01B17/26
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,165,786
App. No.
17/793,062
Granted
Dec 10, 2024
Kind
B2
Abstract

The present disclosure relates to an air-to-air through-wall bushing including a conductor, insulation surrounding the conductor, a ventilation inlet at a first end of the bushing, and a ventilation outlet at a second end of the bushing. The bushing is arranged through a wall and a pressure difference between a first pressure on a first side of the wall and a second pressure on a second side of the wall is provided The inlet and outlet allow cooling air to pass through a ventilation channel within the bushing driven by the provided pressure difference.

Claims (43)

1. An air-to-air through-wall bushing comprising:

a conductor;

insulation surrounding the conductor;

a ventilation inlet at a first end of the bushing;

a ventilation outlet at a second end of the bushing; and

a ventilation channel extending between the ventilation inlet and the ventilation outlet;

the bushing arranged through a wall,

a pressure difference between a first pressure on a first side of the wall and a second pressure on a second side of the wall being provided, and

said ventilation channel configured to allow cooling air to pass into the ventilation inlet, through a ventilation channel within the bushing, and out of the ventilation outlet, driven by the provided pressure difference.

2. The bushing of claim 1 , wherein the ventilation channel is formed outside of the conductor.

3. The bushing of claim 2 , wherein the ventilation channel is formed in an air-gap between the conductor and a winding tube of the bushing.

4. The bushing of claim 3 , wherein the winding tube is concentrically arranged outside of the conductor.

5. The bushing of claim 3 , wherein the ventilation inlet and the ventilation outlet are provided through a respective end connection between the winding tube and the conductor at each end of the bushing.

6. The bushing of claim 1 , wherein the conductor is in the form of a hollow conductor tube.

7. The bushing of claim 6 , wherein the ventilation channel is formed inside of the conductor tube.

8. The bushing of claim 7 , wherein the ventilation inlet and the ventilation outlet are provided through a wall of the conductor tube.

9. A method of providing an air flow through a ventilation channel within an air-to-air through-wall bushing, the bushing being arranged through a wall and comprising:

a conductor;

insulation surrounding the conductor;

a ventilation inlet at a first end of the bushing; and

a ventilation outlet at a second end of the bushing;

the method comprising:

providing a pressure difference between a first pressure on a first side of the wall and a second pressure on a second side of the wall; and

allowing ambient air to pass through the ventilation channel within the bushing, from the ventilation inlet to the ventilation outlet, driven by the provided pressure difference.

10. A hall arrangement comprising:

a hall including a wall having a first side with a first pressure and a second side with a second pressure different from the first pressure to provide a pressure difference; and

an air-to-air through-wall bushing arranged through the wall, the bushing comprising:

a conductor;

insulation surrounding the conductor;

a ventilation inlet at a first end of the bushing;

a ventilation outlet at a second end of the bushing; and

a ventilation channel extending between the ventilation inlet and the ventilation outlet;

said ventilation channel configured to allow cooling air to pass into the ventilation inlet, through a ventilation channel within the bushing, and out of the ventilation outlet, driven by the provided pressure difference.

11. The hall arrangement of claim 10 , wherein the ventilation channel is formed outside of the conductor.

12. The hall arrangement of claim 11 , wherein the ventilation channel is formed in an air-gap between the conductor and a winding tube of the bushing.

13. The hall arrangement of claim 12 , wherein the winding tube is concentrically arranged outside of the conductor.

14. The hall arrangement of claim 12 , wherein the ventilation inlet and the ventilation outlet are provided through a respective end connection between the winding tube and the conductor at each end of the bushing.

15. The hall arrangement of claim 10 , wherein the conductor is in the form of a hollow conductor tube.

16. The hall arrangement of claim 15 , wherein the ventilation channel is formed inside of the conductor tube.

17. The hall arrangement of claim 16 , wherein the ventilation inlet and the ventilation outlet are provided through a wall of the conductor tube.

18. The hall arrangement of claim 10 , wherein the hall is a valve hall.

19. The hall arrangement of claim 10 , wherein the hall holds an overpressure which can press cooling air to flow through the ventilation channel from the ventilation inlet arranged within the hall to the ventilation outlet arranged outside of the hall.

20. The hall arrangement of claim 10 , wherein the bushing is a high voltage (HV) bushing.

Assignments (3)
MERGER Recorded Nov 13, 2023
From: HITACHI ENERGY SWITZERLAND AG
To: HITACHI ENERGY LTD
Reel/Frame 065548/0869 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 15, 2022
From: LINDGREN, SIMON; ERIKSSON, THOMAS; GUSTAVSSON, DAN; KOGNER, JAN; NATZ, RICHARD; REPASI, ZOLTAN
To: ABB POWER GRIDS SWITZERLAND AG
Reel/Frame 060513/0746 →
CHANGE OF NAME Recorded Jul 15, 2022
From: ABB POWER GRIDS SWITZERLAND AG
To: HITACHI ENERGY SWITZERLAND AG
Reel/Frame 060513/0772 →
Priority Claims (1)
EP 20152003 · Jan 15, 2020 · regional
Continuity (1)
Related Publication 20230045369A1 · Feb 9, 2023