IP Library Granted Patent US 12,231,207
Granted Patent B2
US 12,231,207 · App. 17/800,778 · Granted Feb 18, 2025

Methods and apparatus for beam failure detection reference signal determination

Inventors: Chia-Hao Yu (Taipei, TW); Wan-Chen Lin (Taipei, TW); Chien-Chun Cheng (Taipei, TW)
Assignee: SHARP KABUSHIKI KAISHA
H04B7/0695H04L5/0035
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,231,207
App. No.
17/800,778
Granted
Feb 18, 2025
Kind
B2
Abstract

A method and apparatus for determining a BFD RS are provided. The method includes receiving at least one MAC CE for TCI state activation, each MAC CE indicating a CORESET and at least one TCI state, at least a subset of the indicated TCI state(s) belonging to a first group of TCI states associated with a first TRP; and performing first operations after determining that a total number of TCI states included in the first group of TCI states is larger than a first threshold number, the first operations including: selecting at least one first TCI state from the first group of TCI states; and determining at least one first BFD RS for detecting a first beam failure condition of the first TRP based on the at least one first TCI state.

Claims (29)

1. A method performed by a User Equipment (UE) configured with more than one Transmission/Reception Point (TRP) in an active Bandwidth Part (BWP) for determining a Beam Failure Detection (BFD) Reference Signal (RS), the method comprising:

receiving at least one Medium Access Control (MAC) Control Element (CE) for Transmission Configuration Indicator (TCI) state activation, each of the at least one MAC CE indicating a Control Resource Set (CORESET) and at least one TCI state to be activated for monitoring a Physical Downlink Control Channel (PDCCH) associated with a physical resource, the physical resource being determined by a configuration of the CORESET indicated by a same MAC CE, one of the at least one MAC CE indicating more than one TCI state, at least a subset of all TCI states indicated by the at least one MAC CE belonging to a first group of TCI states associated with a first TRP; and

performing first operations after determining that a total number of TCI states included in the first group of TCI states is larger than a first threshold number, the first operations including:

selecting at least one first TCI state from the first group of TCI states, a total number of the at least one first TCI state being equal to the first threshold number; and

determining at least one first BFD RS for detecting a first beam failure condition of the first TRP based on the at least one first TCI state.

2. The method according to claim 1 , wherein at least another subset of all TCI states indicated by the at least one MAC CE belongs to a second group of TCI states associated with a second TRP, the method further comprising:

performing second operations after determining that a total number of TCI states included in the second group of TCI states is larger than a second threshold number, the second operations including:

selecting at least one second TCI state from the second group of TCI states, a total number of the at least one second TCI state being equal to the second threshold number; and

determining at least one second BFD RS for detecting a second beam failure condition of the second TRP based on the at least one second TCI state.

3. The method according to claim 2 , wherein:

the one of the at least one MAC CE includes a serving cell Identifier (ID), a CORESET ID, a first TCI state ID, and a second TCI state ID,

the first TCI state ID indicates a TCI state belonging to the first group of TCI states, and

the second TCI state ID indicates a TCI state belonging to the second group of TCI states.

4. The method according to claim 1 , wherein the one of the at least one MAC CE has a fixed-sized format for indicating two TCI states for PDCCH monitoring.

5. The method according to claim 1 , wherein the one of the at least one MAC CE has a variable-sized format for indicating at least two TCI states for PDCCH monitoring.

6. The method according to claim 5 , wherein the one of the at least one MAC CE further includes an indicator for indicating existence of an octet which includes a third TCI state ID.

7. The method according to claim 1 , wherein in the first group of TCI states, a TCI state that is associated with a CORESET having a lowest monitoring periodicity among all CORESETs associated with the first group of TCI states is prioritized to be selected as one of the at least one first TCI state.

8. The method according to claim 1 , wherein in the first group of TCI states, a TCI state that is associated with a CORESET indicated by the one of the at least one MAC CE is prioritized to be selected as one of the at least one first TCI state.

9. The method according to claim 8 , wherein:

the one of the at least one MAC CE includes a plurality of TCI state IDs,

a TCI state ID of the plurality of TCI state IDs indicates the TCI state that is prioritized to be selected as the one of the at least one first TCI state, and

a Most Significant Bit (MSB) of the TCI state ID is closest, among all MSBs of the plurality of TCI state IDs included in the one of the at least one MAC CE, to an MSB of a bit string represented by the one of the at least one MAC CE.

10. A User Equipment (UE) configured with more than one Transmission/Reception Point (TRP) in an active Bandwidth Part (BWP) for determining a Beam Failure Detection (BFD) Reference Signal (RS), the UE comprising:

at least one processor; and

at least one memory coupled to the at least one processor, wherein the at least one memory stores at least one computer-executable program that, when executed by the at least one processor, causes the UE to:

receive at least one Medium Access Control (MAC) Control Element (CE) for Transmission Configuration Indicator (TCI) state activation, each of the at least one MAC CE indicating a Control Resource Set (CORESET) and at least one TCI state to be activated for monitoring a Physical Downlink Control Channel (PDCCH) associated with a physical resource, the physical resource being determined by a configuration of the CORESET indicated by a same MAC CE, one of the at least one MAC CE indicating more than one TCI state, at least a subset of all TCI states indicated by the at least one MAC CE belonging to a first group of TCI states associated with a first TRP; and

perform first operations after determining that a total number of TCI states included in the first group of TCI states is larger than a first threshold number, the first operations including:

selecting at least one first TCI state from the first group of TCI states, a total number of the at least one first TCI state being equal to the first threshold number; and

determining at least one first BFD RS for detecting a first beam failure condition of the first TRP based on the at least one first TCI state.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 24, 2024
From: FG INNOVATION COMPANY LIMITED
To: SHARP KABUSHIKI KAISHA
Reel/Frame 069028/0473 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 18, 2022
From: YU, CHIA-HAO; LIN, WAN-CHEN; CHENG, CHIEN-CHUN
To: FG INNOVATION COMPANY LIMITED
Reel/Frame 060846/0183 →
Continuity (2)
Provisional Application 62984740 · Mar 3, 2020
Related Publication 20230106244A1 · Apr 6, 2023
References Cited (9)
US 20200045709A1 · Seo et al. · 2020 [cited by applicant]
CN 110708714A · 2020 [cited by applicant]
WO 2019215389A2 · 2019 [cited by applicant]
WO 2020033549A1 · 2020 [cited by applicant]
WO 2020063334A1 · 2020 [cited by applicant]
Zte et al., “Consideration on TCI state MAC CE for mTRP mPDCCH transmissios”, R2-2001465, 3GPP TSG-RAN WG2 #108, Feb. 14, 2020(Feb. 14, 2020), sections 2-3. [cited by applicant]
3GPP TS 38.321, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Medium Access Control (MAC) protocol specification (Release 15)”, Technical Specification, V15.8.0 (Dec. 2019). [cited by applicant]
3GPP TS 38.213, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical layer procedures for control (Release 16)”, Technical Specification, V16.0.0 (Dec. 2019). [cited by applicant]
3GPP TS 38.331, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Radio Resource Control (RRC) protocol specification (Release 15)”, Technical Specification, V15.8.0 (Dec. 2019… [cited by applicant]