IP Library Granted Patent US 12,024,983
Granted Patent B2
US 12,024,983 · App. 17/822,343 · Granted Jul 2, 2024

Method for using CO

Inventors: Markus Albertz (The Woodlands, TX); Harun Ates (Katy, TX); Anuj Gupta (Katy, TX)
Assignee: SAUDI ARABIAN OIL COMPANY
E21B41/0064E21B43/164
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,024,983
App. No.
17/822,343
Granted
Jul 2, 2024
Kind
B2
Abstract

A method and system for both enhancing oil recovery of a reservoir and permanently sequestering carbon dioxide (CO 2 ) is described. The method includes dissolving CO 2 in a base fluid at a surface location of an injection formation, forming a dense CO 2 -brine solution, introducing the dense CO 2 -brine solution into an injection well, accumulating a volume of the dense CO 2 -brine solution in a structural low, displacing a native formation fluid from the injection well, increasing a fluid drive pressure from the injection well to a producing well, and displacing hydrocarbons of the producing well. The system includes an injection system in fluid communication with an injection well, a production well of the hydrocarbon production formation, and a dense CO 2 -brine solution that has a density greater than a native formation fluid of the injection formation.

Claims (37)

1. A method for both enhancing oil recovery of a reservoir and sequestering CO 2 , the method comprising:

dissolving CO 2 in a base fluid at a surface location of an injection formation to increase the density of the base fluid and form a dense CO 2 -brine solution, wherein the base fluid is a residual brine from desalination processing, a sea water, a fresh water, synthetic brine, a produced brine, or combinations thereof, wherein:

the dense CO 2 -brine solution has a density greater than a native formation fluid of the injection formation, and

the injection formation is a same geologic formation or a different geologic formation from a hydrocarbon bearing formation, wherein the injection formation comprises a structural low and the hydrocarbon bearing formation comprises a structural high, wherein the structural low is in fluid communication with the structural high via a hydraulic connection;

introducing the dense CO 2 -brine solution into an injection well having an injection point proximate to the structural low, thereby accumulating a volume of the dense CO 2 -brine solution in the structural low;

displacing the native formation fluid from the injection well to a producing well having a receiving end proximate to the structural high via the hydraulic connection to form a displaced native formation fluid, thereby increasing a fluid drive pressure of the hydraulic connection; and

displacing hydrocarbons of the producing well with the displaced native formation fluid via the fluid drive pressure of the hydraulic connection.

2. The method of claim 1 , wherein identifying the injection formation hydraulically connected to a hydrocarbon bearing formation further comprises:

obtaining, by a computer system, seismic data regarding a geological region of interest;

deconvoluting, by a computer system, the seismic data, well-log data, production data, regarding the geologic region of interest; and

transmitting, by the computer system, the geologic region of interest comprising the injection formation hydraulically connected to a hydrocarbon-bearing formation.

3. The method of claim 1 , further comprising:

measuring a density of the native formation fluid of the injection formation

measuring CO 2 solubility in the base fluid as a function of a salinity of the base fluid, pressure, temperature, or combinations thereof.

4. The method of claim 3 , wherein the produced brine comprises an aqueous fluid selected from the group consisting of a formation water, a frac or flowback water, and combinations thereof.

5. The method of claim 1 , dissolving CO 2 in a base fluid at a surface location of the injection formation further comprises providing an injection system at the surface location of the injection system.

6. The method of claim 5 , further comprising storing CO 2 via a CO 2 storage mechanism in the base fluid.

7. The method of claim 1 , wherein the injection formation hydraulically connected to the hydrocarbon-bearing formation is a syncline or an anticline.

8. The method of claim 1 , wherein the injection formation and the hydrocarbon bearing formation is an aquifer-reservoir pair.

9. The method of claim 1 , further comprising:

deriving an optimal dense CO 2 fluid injection rate prior to introducing the dense CO 2 -brine solution into the formation.

10. The method of claim 1 , further comprising producing a formation brine via a production well from the injection formation or via a hydrocarbon production well.

11. The method of claim 9 , further comprising:

transporting the base fluid to an injection system in fluid communication with the injection well of the injection formation; and

dissolving CO 2 in the base fluid in the injection system, wherein the base fluid comprises a formation brine.

12. A system for both enhancing oil recovery of a reservoir and sequestering CO 2 , the system comprising:

an injection system in fluid communication with an injection well having an injection point proximate to a structural low in an injection formation in fluid communication with a hydrocarbon production formation via a hydraulic connection, wherein a production well is disposed with a receiving end proximate to a structural high of the hydrocarbon production formation, wherein the injection formation and the hydrocarbon production formation are a same geologic formation or different geologic formations; and

a dense CO 2 -brine solution having a density greater than a native formation fluid present in the injection formation, wherein the dense CO 2 -brine solution comprises an amount of CO 2 dissolved in a base fluid, and

wherein the base fluid is a residual brine from desalination processing, a sea water, a fresh water, a synthetic brine, a produced brine, or combinations thereof, and

wherein the dense CO 2 -brine solution is configured to accumulate in the structural low of the injection well, and

wherein the injection system is configured to inject the dense CO 2 -brine solution into the injection well.

13. The system of claim 12 , wherein the injection formation and the hydrocarbon bearing formation is an aquifer-reservoir pair.

14. The system of claim 12 , wherein the production well, an optional production line in the injection formation, or both produces a native formation fluid.

15. The system of claim 12 , wherein the produced brine is selected from the group consisting of a formation water, a frac or flowback water, and combinations thereof.

16. The system of claim 12 , wherein the dense CO 2 -brine solution further comprises one or more additives selected from the group consisting of weighting agents, viscosifiers, polymers, surfactants, and combinations thereof.

17. The system of claim 16 , wherein the one or more weighting agents are selected from the group consisting of barite, hematite, calcium carbonate, siderite, gels, fines, and combinations thereof.

18. The system of claim 12 , wherein the injection formation and the hydrocarbon production formation is an aquifer-reservoir pair.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 18, 2023
From: SAUDI ARAMCO UPSTREAM TECHNOLOGIES COMPANY
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 065268/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 17, 2023
From: ARAMCO SERVICES COMPANY
To: SAUDI ARAMCO UPSTREAM TECHNOLOGIES COMPANY
Reel/Frame 065255/0318 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 15, 2023
From: ALBERTZ, MARKUS; ATES, HARUN; GUPTA, ANUJ
To: ARAMCO SERVICES COMPANY
Reel/Frame 062993/0247 →
Continuity (1)
Related Publication 20240068331A1 · Feb 29, 2024