IP Library Granted Patent US 12,381,661
Granted Patent B2
US 12,381,661 · App. 17/825,176 · Granted Aug 5, 2025

Uplink grant for consecutive uplink subframes in a wireless device

Inventors: Esmael Hejazi Dinan (McLean, VA); Alireza Babaei (Fairfax, VA)
Assignee: HONDA MOTOR CO., LTD.
H04L1/1822H04L1/1896H04L5/0053H04L27/0006H04W52/242H04W52/367H04W52/50H04W74/0808H04L5/0051H04W72/23
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,381,661
App. No.
17/825,176
Granted
Aug 5, 2025
Kind
B2
Abstract

An uplink grant is received. The uplink grant comprises: a field indicating a number of consecutive uplink subframes; an assignment of resource blocks comprising subcarriers; and a power control command. A determination is made of a transmission power of transport blocks in each subframe of the consecutive uplink subframes based on the power control command. The transmission power in each subframe is adjusted based on a total transmit power in each subframe exceeding a power value in each subframe. Transport blocks are transmitted, using the transmission power, via the subcarriers across each of the consecutive uplink subframes.

Claims (40)

1. A method comprising:

transmitting, to a wireless device, an uplink grant message of Physical Uplink Shared Channel (PUSCH) transmission in a Licensed Assisted Access (LAA) cell, comprising:

a field indicating a number of uplink subframes allocated for a PUSCH transmission;

an assignment of resource blocks corresponding to the uplink subframes; and

a power control command;

receiving PUSCH transmission in each subframe of the uplink subframes, which is transmitted using the first transmission power in the each subframe if a first transmission power of the PUSCH transmission in the each subframe does not exceed a maximum allowed power value in the each subframe; and

receiving PUSCH transmission in the each subframe, which is transmitted using a second transmission power which does not exceed the maximum allowed power value if the first transmission power in the each subframe exceeds the maximum allowed power value in the each subframe,

wherein the first transmission power of the PUSCH transmission in the each subframe is determined based on the power control command.

2. The method of claim 1 , wherein the uplink grant message further comprises:

a modulation and coding scheme;

a hybrid automatic repeat request (HARQ) identifier;

a redundancy version (RV); or

a new data indicator (NDI).

3. The method of claim 1 , wherein the number of the uplink subframes is less than a number of hybrid automatic repeat request (HARQ) processes supported by a wireless device.

4. The method of claim 1 , wherein the first transmission power is based on a measured pathloss value.

5. The method of claim 1 , wherein the first transmission power is based on a same closed loop adjustment factor, the closed loop adjustment factor calculated based on the power control command.

6. The method of claim 1 , wherein the PUSCH transmission is associated with an asynchronous hybrid automatic repeat request (HARQ) process.

7. The method of claim 1 , wherein the each subframe of the uplink subframes is associated with a hybrid automatic repeat request (HARQ) identifier, the HARQ identifier depending on a position of a subframe in the uplink subframes.

8. The method of claim 1 , further comprising receiving a sounding reference signal (SRS) in a subframe of the uplink subframes, wherein a transmission power of the SRS is calculated employing the power control command.

9. A base station comprising:

one or more processors; and

memory storing instructions that, when executed by the one or more processors, cause the base station to:

transmit an uplink grant message of Physical Uplink Shared Channel (PUSCH) transmission in a Licensed Assisted Access (LAA) cell, comprising:

a field indicating a number of uplink subframes allocated for a PUSCH transmission;

an assignment of resource blocks corresponding to the uplink subframes; and

a power control command;

receive PUSCH transmission in each subframe of the uplink subframes, which is using a first transmission power of the PUSCH transmission in the each subframe if the first transmission power in the each subframe does not exceed a maximum allowed power value in the each subframe; and

receive PUSCH transmission in the each subframe, which is transmitted using a second transmission power which does not exceed the maximum allowed power value if the first transmission power in the each subframe exceeds the maximum allowed power value in the each subframe,

wherein the first transmission power of the PUSCH transmission in the each subframe is determined based on the power control command.

10. The base station of claim 9 , wherein the uplink grant message further comprises:

a modulation and coding scheme;

a hybrid automatic repeat request (HARQ) identifier;

a redundancy version (RV); or

a new data indicator (NDI).

11. The base station of claim 9 , wherein the number of the uplink subframes is less than a number of hybrid automatic repeat request (HARQ) processes supported by a wireless device.

12. The base station of claim 9 , wherein the first transmission power is based on a measured pathloss value.

13. The base station of claim 9 , wherein the first transmission power is based on a same closed loop adjustment factor, the closed loop adjustment factor calculated based on the power control command.

14. The base station of claim 9 , wherein the PUSCH transmission is associated with an asynchronous hybrid automatic repeat request (HARQ) process.

15. The base station of claim 9 , wherein the each subframe is associated with a hybrid automatic repeat request (HARQ) identifier, the HARQ identifier depending on a position of a subframe in the uplink subframes.

16. The base station of claim 9 , wherein the instructions, when executed by the one or more processors, further cause the base station to receive a sounding reference signal (SRS) in a subframe of the uplink subframes, wherein a transmission power of the SRS is calculated employing the power control command.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 16, 2022
From: OFINNO, LLC
To: HONDA MOTOR CO., LTD.
Reel/Frame 060518/0612 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 27, 2022
From: DINAN, ESMAEL HEJAZI; BABAEI, ALIREZA
To: OFINNO, LLC
Reel/Frame 060205/0054 →
Continuity (5)
Continuation 16670317 · Oct 31, 2019
Continuation 15418370 · Jan 27, 2017
Provisional Application 62290738 · Feb 3, 2016
Provisional Application 62289785 · Feb 1, 2016
Related Publication 20220286238A1 · Sep 8, 2022
References Cited (86)
US 8948066B2 · Kim et al. · 2015 [cited by applicant]
US 9281923B2 · Kim et al. · 2016 [cited by applicant]
US 9621329B2 · Kim et al. · 2017 [cited by applicant]
US 9743432B2 · Ji et al. · 2017 [cited by applicant]
US 9877341B2 · Lin et al. · 2018 [cited by applicant]
US 10187187B2 · Dinan · 2019 [cited by applicant]
US 10511413B2 · Dinan et al. · 2019 [cited by applicant]
US 20100158147A1 · Zhang · 2010 [cited by examiner]
US 20130077543A1 · Kim et al. · 2013 [cited by applicant]
US 20140029559A1 · Seo et al. · 2014 [cited by applicant]
US 20140334390A1 · Lindholm et al. · 2014 [cited by applicant]
US 20140335390A1 · Hwang et al. · 2014 [cited by applicant]
US 20150172003A1 · Kim et al. · 2015 [cited by applicant]
US 20150289208A1 · Liu et al. · 2015 [cited by applicant]
US 20150296533A1 · Park · 2015 [cited by applicant]
US 20150341921A1 · Chen et al. · 2015 [cited by applicant]
US 20160050667A1 · Papasakellariou et al. · 2016 [cited by applicant]
US 20160065332A1 · Yum et al. · 2016 [cited by applicant]
US 20160066343A1 · Lin et al. · 2016 [cited by applicant]
US 20160095114A1 · Kim et al. · 2016 [cited by applicant]
US 20160095134A1 · Chen et al. · 2016 [cited by applicant]
US 20160112992A1 · Bhushan et al. · 2016 [cited by applicant]
US 20160113004A1 · Yu et al. · 2016 [cited by applicant]
US 20160128080A1 · Verma et al. · 2016 [cited by applicant]
US 20160135143A1 · Won et al. · 2016 [cited by applicant]
US 20160164660A1 · Kim et al. · 2016 [cited by applicant]
US 20160234841A1 · Pao et al. · 2016 [cited by applicant]
US 20160278050A1 · Nory et al. · 2016 [cited by applicant]
US 20160295345A1 · Oh · 2016 [cited by applicant]
US 20160302176A1 · Ahn et al. · 2016 [cited by applicant]
US 20170005768A1 · Yin et al. · 2017 [cited by applicant]
US 20170078983A1 · Ahn et al. · 2017 [cited by applicant]
US 20170099664A1 · Lunttila et al. · 2017 [cited by applicant]
US 20170188352A1 · Lee et al. · 2017 [cited by applicant]
US 20170238190A1 · Yang et al. · 2017 [cited by applicant]
US 20180048498A1 · Stern-Berkowitz et al. · 2018 [cited by applicant]
US 20180110057A1 · Park et al. · 2018 [cited by applicant]
CN 103503348A · 2014 [cited by applicant]
CN 104113924A · 2014 [cited by applicant]
KR 1020110134853A · 2011 [cited by applicant]
WO 2016010276A1 · 2016 [cited by applicant]
Non-Final Office Action dated Oct. 18, 2021, issued in U.S. Appl. No. 16/670,317. (34 pages). [cited by applicant]
Non-Final Office Action dated Nov. 16, 2021, issued in U.S. Appl. No. 16/714,936. (18 pages). [cited by applicant]
Office Action dated May 12, 2021, issued in counterpart IN Application No. 201817028179, with English translation. (5 pages). [cited by applicant]
3GPP TR 36.889 V1.0.1 (Jun. 2015); 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Study on Licensed-Assisted Access to Unlicensed Spectrum; (Release 13). [cited by applicant]
3GPP TS 36.211 V13.0.0 (Dec. 2015), Technical Specification, 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA);Physical channels … [cited by applicant]
3GPP TS 36.212 V13.0.0 (Dec. 2015) 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Multiplexing and channel coding (Release 13… [cited by applicant]
3GPP TS 36.213 V13.0.1 (Jan. 2016). [cited by applicant]
3GPP TS 36.300 V13.2.0 (Dec. 2015); 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Acc… [cited by applicant]
3GPP TS 36.321 V13.0.0 (Dec. 2015); 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Medium Access Control (MAC) protocol speci… [cited by applicant]
3GPP TS 36.331 V13.0.0 (Dec. 2015); 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Radio Resource Control (RRC);Protocol spec… [cited by applicant]
3GPP TSG RAN WG1 #80bis; R1-151404; Apr. 20-24, 2015; Belgrade, Serbia; Source: Qualcomm Incorporated; Title: Adaptive Frame Structure and DL-UL configuration for LAA. [cited by applicant]
3GPP TSG RAN WG1 #80bis; R1-151407; Apr. 20-24, 2015; Belgrade, Serbia; Source: Qualcomm Incorporated; Title: Uplink Waveform for LAA. [cited by applicant]
3GPP TSG RAN WG1 #81; R1-152783; May 25-29, 2015; Fukuoka, Japan; Source: Qualcomm Incorporated; Title: Adaptive Frame Structure and DL-UL configuration for LAA. [cited by applicant]
3GPP TSG RAN WG1 #81; R1-152790; Apr. 25-29, 2015; Fukuoka, Japan; Source: Qualcomm Incorporated; Title: Uplink Waveform for LAA. [cited by applicant]
3GPP TSG RAN WG1 Meeting #80bis; R1-151302; Belgrade, Serbia, Apr. 20-24, 2015; Agenda Item: 7.2.4.2; Source: Huawei, HiSilicon; Title: Support of UL transmission for LAA. [cited by applicant]
3GPP TSG RAN WG1 meeting #80bis; R1-151516; Belgrade, Serbia, Apr. 20-24, 2015; Source: LG Electronics; Title: LBT operation for LAA UL. [cited by applicant]
3GPP TSG RAN WG1 Meeting #80bis; R1-151627; Belgrade, Serbia, Apr. 20-24, 2015; Source: Samsung; Title: Discussion on UL transmission for LAA. [cited by applicant]
3GPP TSG RAN WG1 Meeting #80bis; R1-151719; Belgrade, Serbia, Apr. 20-24, 2015; Source: ZTE; Title: Potential design for LAA UL transmission. [cited by applicant]
3GPP TSG RAN WG1 Meeting #80bis; R1-152293; Belgrade, Serbia, Apr. 20-24, 2015; WF on SRS for LAA UL. [cited by applicant]
3GPP TSG RAN WG1 Meeting #80bis; R1-152376; Belgrade, Serbia, Apr. 20-24, 2015; WF on SRS for LAA UL. [cited by applicant]
3GPP TSG RAN WG1 Meeting #81, R1-153136, Fukuoka, Japan, May 25-29, 2015, Source: Ericsson, Title: On SRS Transmissions for LAA. [cited by applicant]
3GPP TSG RAN WG1 Meeting #81; R1-152816; Fukuoka, Japan, May 25-29, 2015; Source: Nokia Networks; Title: On the remaining PHY issues for LAA UL operation. [cited by applicant]
3GPP TSG RAN WG1 Meeting #81; R1-152817; Fukuoka, Japan, May 25-29, 2015; Source: Nokia Networks; Title: UL LBT and Configurable Frame Structure for UU/DL operation. [cited by applicant]
3GPP TSG RAN WG1 Meeting #81; R1-152872; Fukuoka, Japan; May 25-29, 2015; Source: Samsung; Title: Discussion on UL transmission for LAA. [cited by applicant]
3GPP TSG RAN WG1 Meeting #81; R1-152970; Fukuoka, Japan, May 25-29, 2015; Source: ZTE; Title: Overview on LAA UL. [cited by applicant]
3GPP TSG RAN WG1 Meeting #81; R1-152971; Fukuoka, Japan, May 25-29, 2015; Source: ZTE; Title: Remaining Issues on LAA UL. [cited by applicant]
3GPP TSG-RAN WG1 Meeting #80bis; R1-151841; Belgrade, Serbia, Apr. 20-24, 2015; Source: Nokia Networks; Title: On the PHY options for LAA UL operation. [cited by applicant]
3GPP TSG-RAN WG1 Meeting #80bis; R1-151842; Belgrade, Serbia, Apr. 20-24, 2015; Source: Nokia Networks; Title: UL LBT and Configurable Frame Structure for UL/DL operation. [cited by applicant]
International Partial Search Report mailed Apr. 12, 2017, in PCT/US2017/015474. [cited by applicant]
3GPP TSG RAN WG1 Meeting #78bis; R1-144221, Ljubljana, Slovenia, Oct. 6-10, 2014, Source: Hitachi Ltd Title: Design targets for LAA using LTE. [cited by applicant]
Office Action dated Jan. 21, 2022, issued in counterpart KR Application No. 10-2021-7005801, with English translation. (14 pages). [cited by applicant]
3GPP TS 36.213 v14.1.0, 3rd Generation Patrnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Acess (E-UTRA); Physicla layer procedures (release 14) (Jan. 2, 2017. c… [cited by applicant]
3Gpp Intel Corporation, R2-151102, Uplink tranmission with LBT 3GPP TSG-RAN WG2 #89bis Bratislava, Slovakia, 20th-24th 3GPP (Apr. 11, 2015). cited in KR Office Action dated Jan. 21, 2022. (6 pages). [cited by applicant]
3GPP TSG RAN WG1 #80 R1-150359 Athens, Greece, Feb. 9-13, 2015, Source: Samsung, Title: Enhancements to DL control signaling for CA with up to 32 CCs. [cited by applicant]
3GPP TSG RAN WG1 meeting #80 R1-151500, Belgrade, Serbia, Apr. 20-24, 2015, Source: LG Electronics, Title: DL control enhancements for supporfting Rel-13 CA. [cited by applicant]
3GPP TSG RAN WG1 #80 R1-151603 Belgrade, Serbia, Apr. 20-24, 2015, Source: Samsung, Title: Other DL control enhancements for CA with up to 32 CCs. [cited by applicant]
3GPP TSG RAN WG1 meeting #81 R1-152713, Fukuoka, Japan, May 25-29, 2015, Source: LG Electronics, Title: DL control enhancement for Rel-13 CA. [cited by applicant]
3GPP TSG RAN WG1 Meeting #81 R1-152741, Fukuoka, Japan, May 25-29, 2015, Source: LG Electronics, Title: Scheduling and HARQ operation in LAA. [cited by applicant]
3GPP TSG-RAN WG1 meeting #81 R1-152820, Fukuoka, Japan, May 25-29, 2015, Source: Nokia Networks, Title: On reducing the number of DL control blind decodes. [cited by applicant]
3GPP TSG RAN WG1 #81 R1-152849, Fukuoka, Japan, May 25-29, 2015, Source: Samaung, Title: Other DL Control enhancements for CA with up to 32 CCs. [cited by applicant]
3GPP TSG RAN WG1 meeting #81 R1-152990, Fukuoka, Japan, May 25-59x, 2015, Source: Alcatel-Lucent Shanghai Bell. Alcatel-Lucent, Title: LBT and Frame Structure Design for LAA with DL and UL. [cited by applicant]
International Partial Search Report mailed May 9, 2017, in PCT/US2017/015591. [cited by applicant]
3GPP TSG RAN WG1 Meeting #80bis; R1-151958, Belgrade, Serbia, Apr. 20-24, 2015; Source: NTT Docomo, Inc,: Title: Discussion on Issue related to UL transmission in LAA. [cited by applicant]
3GPP TSG-RAN WG2 Meeting #89Bis; R2-151541, 20.4. to 24.4, 2015, Bratislava, Slovakia; Source: CMCC; Title: UL Transmission Issues of LAA. [cited by applicant]
3GPP TSG-RAN WG2 #89bis; Intel Corporation, R2-151102, Uplink tranmission with LBT; Bratislava, Slovakia, Apr. 20-24, 2015 (Apr. 11, 2015); cited in KR Office Action dated Jan. 21, 2022. (6 pages). [cited by applicant]