IP Library Granted Patent US 12,145,317
Granted Patent B2
US 12,145,317 · App. 17/846,413 · Granted Nov 19, 2024

Powder distribution for laser sintering systems

Inventors: David H Cullen (Rock Hill, SC); Rafael Enrique Hidalgo (Fort Mill, SC)
Assignee: 3D SYSTEMS, INC.
B29C64/357B22F10/28B22F12/13B22F12/52B22F12/63B28B1/001B29C64/153B29C64/165B29C64/205B29C64/35B33Y10/00B33Y30/00B22F3/004B22F10/36B22F10/73B22F12/20B29C64/218B29C64/329B29K2071/00B29K2077/00B29K2105/251Y02P10/25
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,145,317
App. No.
17/846,413
Granted
Nov 19, 2024
Kind
B2
Abstract

There is provided improved laser sintering systems that increase the powder density and reduce anomalies of the powder layers that are sintered, that measure the laser power within the build chamber for automatic calibration during a build process, that deposit powder into the build chamber through a chute to minimize dusting, and that scrubs the air and cools the radiant heaters with recirculated scrubbed air. The improvements enable the laser sintering systems to make parts that are of higher and more consistent quality, precision, and strength, while enabling the user of the laser sintering systems to reuse greater proportions of previously used but unsintered powder.

Claims (16)

1. A laser sintering system for fabricating three dimensional objects based upon design data and from a sinterable powder, the laser sintering system comprising:

a laser;

a build chamber;

at least one heater bracket; and

an air scrubber comprising a filtration section that cleans and recirculates air within the build chamber, wherein the heater bracket is in flow communication with the air scrubber and the air scrubber exhausts air through the heater bracket into the build chamber, wherein the heater bracket is positioned at a build chamber inlet.

2. The laser sintering system of claim 1 , wherein the scrubber includes a scrubber inlet through which air is pulled from the build chamber.

3. The laser sintering system of claim 2 , wherein the scrubber comprises tubing that connects the build chamber to the scrubber inlet and to a build chamber inlet for the return of the air to the build chamber from the scrubber.

4. The laser sintering system of claim 2 , wherein the scrubber includes two scrubber outlets through which exhaust air is expelled back to the build chamber.

5. The laser sintering system of claim 1 , wherein the scrubber includes an initial cooling section.

6. The laser sintering system of claim 5 , wherein the cooling section comprises one or more passages.

7. The laser sintering system of claim 6 , wherein the scrubber further comprises a heat sink and/or a fan assembly in thermal communication with the passages in the cooling section.

8. The laser sintering system of claim 5 , wherein the filtration section comprises one or more filters that capture contaminants from the air passing therethrough.

9. The laser sintering system of claim 1 , wherein air is circulated through the scrubber by a blower fan rotated by a blower motor.

10. The laser sintering system of claim 1 wherein the heater bracket supports at least one heater.

11. The laser sintering system of claim 10 , wherein the heater bracket has one or more exhaust holes along an outwardly facing surface of the bracket.

12. The laser sintering system of claim 10 , wherein the air is pulled from the build chamber from above the at least one heater.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 30, 2022
From: CULLEN, DAVID H.; HIDALGO, RAFAEL ENRIQUE
To: 3D SYSTEMS, INC.
Reel/Frame 061271/0115 →