IP Library Granted Patent US 12,256,410
Granted Patent B2
US 12,256,410 · App. 17/847,945 · Granted Mar 18, 2025

Method and device for performing configured grant-based small data transmission

Inventors: Hsin-Hsi Tsai (Taipei, TW); Heng-Li Chin (Taipei, TW); Mei-Ju Shih (Taipei, TW)
Assignee: SHARP KABUSHIKI KAISHA
H04W72/23H04B17/318H04W56/001H04W56/004H04W76/30
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,256,410
App. No.
17/847,945
Granted
Mar 18, 2025
Kind
B2
Abstract

A method for a UE for performing a CG-SDT is provided. The method includes receiving a CG-SDT-specific RSRP threshold from a BS, the CG-SDT-specific RSRP threshold being configured to the UE for an SSB selection for the CG-SDT; in a case that one or more SSBs with RSRPs above the CG-SDT-specific RSRP threshold are available, performing the SSB selection to determine a first SSB index from one or more SSB indices of the one or more SSBs; and performing an initial transmission of the CG-SDT or a subsequent new transmission of the CG-SDT through a first UL grant corresponding to the first SSB index.

Claims (34)

1. A method for a User Equipment (UE) for performing a Configured Grant (CG)-based Small Data Transmission (CG-SDT), the method comprising:

receiving a CG-SDT-specific Reference Signal Received Power (RSRP) threshold from a Base Station (BS), the CG-SDT-specific RSRP threshold being configured to the UE for a Synchronization Signal Block (SSB) selection for the CG-SDT;

in a case that one or more SSBs with RSRPs above the CG-SDT-specific RSRP threshold are available, performing the SSB selection to determine a first SSB index from one or more SSB indices of the one or more SSBs; and

performing an initial transmission of the CG-SDT or a subsequent new transmission of the CG-SDT through a first Uplink (UL) grant corresponding to the first SSB index.

2. The method of claim 1 , further comprising:

indicating, by a higher layer of the UE, the first SSB index to a lower layer of the UE after determining the first SSB index.

3. The method of claim 1 , further comprising:

determining, during the SSB selection, a second SSB index for a retransmission of the initial transmission, the second SSB index having a same value as the first SSB index.

4. The method of claim 3 , further comprising:

indicating, by a higher layer of the UE, the second SSB index to a lower layer of the UE after determining the second SSB index.

5. The method of claim 1 , wherein performing the SSB selection comprises performing the SSB selection after determining that a configuration for the CG-SDT is configured.

6. The method of claim 1 , wherein performing the SSB selection comprises performing the SSB selection after determining that a Timing Advance (TA) for the CG-SDT is valid.

7. The method of claim 1 , wherein the one or more SSBs are configured for the CG-SDT.

8. The method of claim 1 , wherein the CG-specific RSRP threshold is configured through a Small Data Transmission (SDT)-specific CG configuration.

9. The method of claim 8 , wherein the SDT-specific CG configuration is configured through a Small Data Transmission (SDT) configuration.

10. The method of claim 9 , wherein the SDT configuration is configured through a Radio Resource Control (RRC) release message.

11. A User Equipment (UE) for performing a Configured Grant (CG)-based Small Data Transmission (CG-SDT), the UE comprising:

transmission and reception circuitry; and

at least one processor coupled to the transmission and reception circuitry and configured to:

receive, by the transmission and reception circuitry, a CG-SDT-specific Reference Signal Received Power (RSRP) threshold from a Base Station (BS), the CG-SDT-specific RSRP threshold being configured to the UE for a Synchronization Signal Block (SSB) selection for the CG-SDT;

in a case that one or more SSBs with RSRPs above the CG-SDT-specific RSRP threshold are available, perform the SSB selection to determine a first SSB index from one or more SSB indices of the one or more SSBs; and

perform an initial transmission of the CG-SDT or a subsequent new transmission of the CG-SDT through a first Uplink (UL) grant corresponding to the first SSB index.

12. The UE of claim 11 , wherein the at least one processor is further configured to:

indicate, by a higher layer of the UE, the first SSB index to a lower layer of the UE after the UE determines the first SSB index.

13. The UE of claim 11 , wherein the at least one processor is further configured to:

determine, during the SSB selection, a second SSB index for a retransmission of the initial transmission, the second SSB index having a same value as the first SSB index.

14. The UE of claim 13 , wherein the at least one processor is further configured to:

indicate, by a higher layer of the UE, the second SSB index to a lower layer of the UE after determining the second SSB index.

15. The UE of claim 11 , wherein performing the SSB selection comprises performing the SSB selection after determining that a configuration for the CG-SDT is configured.

16. The UE of claim 11 , wherein performing the SSB selection comprises performing the SSB selection after determining that a Timing Advance (TA) for the CG-SDT is valid.

17. The UE of claim 11 , wherein the one or more SSBs are configured for the CG-SDT.

18. The UE of claim 11 , wherein the CG-specific RSRP threshold is configured through a Small Data Transmission (SDT)-specific CG configuration.

19. The UE of claim 18 , wherein the SDT-specific CG configuration is configured through a Small Data Transmission (SDT) configuration.

20. The UE of claim 19 , wherein the SDT configuration is configured through a Radio Resource Control (RRC) release message.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 24, 2024
From: FG INNOVATION COMPANY LIMITED
To: SHARP KABUSHIKI KAISHA
Reel/Frame 069028/0473 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 23, 2022
From: TSAI, HSIN-HSI; CHIN, HENG-LI; SHIH, MEI-JU
To: FG INNOVATION COMPANY LIMITED
Reel/Frame 060294/0792 →
Continuity (2)
Provisional Application 63214507 · Jun 24, 2021
Related Publication 20220417983A1 · Dec 29, 2022
References Cited (13)
US 20210360610A1 · Kim et al. · 2021 [cited by applicant]
US 20240155502A1 · Lin · 2024 [cited by examiner]
CN 112997443A · 2021 [cited by applicant]
WO 2021088946A1 · 2021 [cited by applicant]
Asia Pacific Telecom, FGI, “CG-SDT based on beam operation”, R2-2103265, Apr. 1, 2021. [cited by applicant]
Qualcomm Incorporated, “Discussion on CG based NR small data transmission”, R2-2103434, Apr. 2, 2021. [cited by applicant]
Asia Pacific Telecom, FGI, “Beam operation for CG-SDT”, R2-2101837, Jan. 15, 2021. [cited by applicant]
3GPP TS 38.321, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Medium Access Control (MAC) protocol specification (Release 16)”, V16.4.0 (Mar. 2021). [cited by applicant]
3GPP TS 38.212, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Multiplexing and channel coding (Release 16)”, V16.5.0 (Mar. 2021). [cited by applicant]
3GPP TS 38.213, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical layer procedures for control (Release 16)”, V16.5.0 (Mar. 2021). [cited by applicant]
3GPP TS 38.331, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Radio Resource Control (RRC) protocol specification (Release 16)”, V16.4.1 (Mar. 2021). [cited by applicant]
3GPP TS 38.300, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; NR and NG-RAN Overall Description; Stage 2 (Release 16)”, V16.5.0 (Mar. 2021). [cited by applicant]
3GPP TS 38.214, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical layer procedures for data (Release 16)”, V16.5.0 (Mar. 2021). [cited by applicant]
Cited By (2)
US 12,634,998 US 12,696,130