IP Library Granted Patent US 12,044,446
Granted Patent B2
US 12,044,446 · App. 17/876,387 · Granted Jul 23, 2024

Absorption chiller

Inventors: Teruhiro Sagata (Hamamatsu, JP); Hiroshi Uematsu (Hamamatsu, JP); Osamu Hiyama (Hamamatsu, JP)
Assignee: YAZAKI ENERGY SYSTEM CORPORATION
F25B17/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,044,446
App. No.
17/876,387
Granted
Jul 23, 2024
Kind
B2
Abstract

There is provided an absorption chiller including: a control unit configured to control opening and closing of the first control valve and an operation of the first pump, and a second supply flow path configured to supply the liquid inside the evaporator into the absorber; a second control valve opening and closing the second supply flow path; and a second pump configured to generate power to supply the liquid inside the evaporator into the absorber. After an operation of the absorption chiller is stopped, the control unit is configured to open the first control valve and operate the first pump such that a liquid inside the evaporator is mixed with the absorption liquid. Further, before the first control valve is opened and the first pump is operated, the control unit is configured to open the second control valve and operate the second pump.

Claims (23)

1. An absorption chiller comprising:

a refrigeration cycle unit including a regenerator, a condenser, an evaporator, an absorber;

a first supply flow path configured to supply an absorption liquid inside the absorber into the evaporator;

a first control valve opening and closing the first supply flow path;

a first pump configured to generate power to supply the absorption liquid inside the absorber into the evaporator;

a control unit configured to control opening and closing of the first control valve and an operation of the first pump, the control unit being configured to open the first control valve and operate the first pump for a specified time such that a liquid inside the evaporator is mixed with the absorption liquid supplied from the absorber and into the evaporator, after an operation of the absorption chiller is stopped, and

a second supply flow path configured to supply the liquid inside the evaporator into the absorber;

a second control valve opening and closing the second supply flow path; and

a second pump configured to generate power to supply the liquid inside the evaporator into the absorber, wherein

the control unit is configured to open the second control valve and operate the second pump, after the operation of the absorption chiller is stopped and before the first control valve is opened and the first pump is operated.

2. The absorption chiller according to claim 1 , further comprising:

a circulation flow path connecting at least two parts of the evaporator to one another, wherein

one end of the second supply flow path is connected downstream from the second pump among the circulation flow path, and

the other end of the second supply flow path is connected to the absorber.

3. The absorption chiller according to claim 2 , further comprising:

a third control valve provided at a position downstream of a portion of the circulation flow path to which the second supply flow path is connected, wherein

the control unit is configured to close the third control valve while opening the second control valve and operating the second pump.

4. The absorption chiller according to claim 1 , further comprising:

an outside air temperature sensor that measures an outside air temperature, wherein

after the operation of the absorption chiller is stopped, when the outside air temperature is equal to or lower than a predetermined temperature based on a signal from the outside air temperature sensor, the control unit is configured to open the second control valve and operate the second pump.

5. The absorption chiller according to claim 1 , further comprising:

a level sensor that detects a level of the liquid inside the evaporator, wherein

when the level of the liquid is equal to or lower than a predetermined level of the liquid, the control unit is configured to open the first control valve and operate the first pump.

Assignments (2)
CHANGE OF ADDRESS Recorded Jun 5, 2023
From: YAZAKI ENERGY SYSTEM CORPORATION
To: YAZAKI ENERGY SYSTEM CORPORATION
Reel/Frame 063845/0751 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 28, 2022
From: SAGATA, TERUHIRO; UEMATSU, HIROSHI; HIYAMA, OSAMU
To: YAZAKI ENERGY SYSTEM CORPORATION
Reel/Frame 060663/0627 →