IP Library Granted Patent US 11,975,803
Granted Patent B2
US 11,975,803 · App. 17/881,898 · Granted May 7, 2024

Hoist apparatus for mobile offshore platform

Inventors: Robert van Kuilenburg (Sugar Land, TX); Hans H. J. Deul (Richmond, TX)
Assignee: Noble Rig Holdings Limited
B63B27/10B63B27/16B63B35/4413
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,975,803
App. No.
17/881,898
Granted
May 7, 2024
Kind
B2
Abstract

A system for lifting loads from a mobile offshore platform includes a boom pivotally at one longitudinal end mounted to the platform. A boom extension line is coupled at one end to the boom to cause rotational movement thereof about the pivotally mounted end of the boom. Another end of the boom extension line is either (i) coupled to a movable subplatform on the platform or (ii) supported by a device coupled to the movable subplatform. Movement of the subplatform causes change in effective length of the boom extension line so as to move the boom between an extended position and a retracted position.

Claims (21)

1. A system for lifting loads from a mobile offshore platform, comprising:

a boom pivotally at one longitudinal end mounted to the platform;

a boom extension line coupled at one end to the boom to cause rotational movement thereof about the pivotally mounted end of the boom, another end of the boom extension line either (i) coupled to a subplatform movably mounted on the platform or (ii) supported by a supporting device coupled to the subplatform, wherein movement of the subplatform or movement of the supporting device relative to the platform causes change in effective length of the boom extension line so as to move the boom between an extended position and a retracted position.

2. The system of claim 1 wherein the movably mounted subplatform comprises a laterally extensible cantilever having a drilling hoist system disposed thereon.

3. The system of claim 1 further comprising a load lift line extending from a winch disposed on the platform, the load lift line extending though at least one sheave mounted on the boom.

4. The system of claim 3 wherein the load lift line is connected to a drilling unit hoisting system disposed on the movably mounted subplatform.

5. The system of claim 3 wherein the sheave is mounted proximate an end of the boom opposed to the pivotally mounted end.

6. The system of claim 1 wherein the boom is pivotally mounted to the movably mounted subplatform.

7. The system of claim 1 wherein the boom is mounted to the platform apart from the movably mounted subplatform.

8. The system of claim 1 wherein the other end of the boom extension line is coupled to the movably mounted subplatform.

9. The system of claim 1 wherein the other end of the boom is coupled to the platform apart from the movably mounted subplatform.

10. The system of claim 1 wherein the supporting device comprises a sheave coupled to the platform through a variable length device.

11. The system of claim 10 wherein the variable length device comprises a winch and cable.

12. A method for lifting loads from a mobile offshore platform, comprising:

operating a load lifting line extending from a boom pivotally coupled at one longitudinal end to the platform; and

operating a boom extension line coupled at one end to the boom so as to cause rotational movement of the boom about the pivotally coupled end of the boom by changing an effective length of the boom extension line, the changing effective length comprising either (i) moving a subplatform movably mounted on the mobile offshore platform wherein another end of the boom extension line is coupled to the subplatform or (ii) moving the boom extension line through a supporting device coupled to the movable subplatform, wherein movement of the subplatform or the supporting device relative to the platform causes change in effective length of the boom extension line so as to move the boom between an extended position and a retracted position.

13. The method of claim 12 wherein the movable subplatform comprises a laterally extensible cantilever having a drilling hoist system disposed thereon.

14. The method of claim 12 wherein the operating a load lift line comprises operating a winch disposed on the mobile offshore platform.

15. The method of claim 12 wherein the winch forms part of a drilling unit hoisting system disposed on the movable subplatform.

16. The method of claim 12 wherein the boom is pivotally mounted to the movably mounted subplatform.

17. The method of claim 12 wherein the boom is mounted to the platform apart from the movably mounted subplatform.

Assignments (2)
CORRECTIVE ASSIGNMENT TO CORRECT THE THE ASSIGNEE NAME PREVIOUSLY RECORDED AT REEL: 061099 FRAME: 0628. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Sep 23, 2022
From: VAN KUILENBURG, ROBERT; DEUL, HANS H.J.
To: NOBLE RIG HOLDINGS LIMITED
Reel/Frame 061511/0984 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 5, 2022
From: VAN KUILENBURG, ROBERT; DEUL, HANS H.J.
To: NOBLE RIGS HOLDINGS LIMITED
Reel/Frame 061099/0628 →
Continuity (3)
Continuation PCTUS2021016967 · Feb 6, 2021
Provisional Application 62970768 · Feb 6, 2020
Related Publication 20220371697A1 · Nov 24, 2022