IP Library Granted Patent US 11,748,157
Granted Patent B2
US 11,748,157 · App. 17/900,283 · Granted Sep 5, 2023

Priority determination system, priority determination method, and recording medium

Inventors: Shoichiro Sekiya (Osaka, JP); Yuishi Torisaki (Osaka, JP)
Assignee: PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.
G06F9/4881H04L63/1425H04L63/1433
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,748,157
App. No.
17/900,283
Granted
Sep 5, 2023
Kind
B2
Abstract

A priority determination system includes: an anomaly obtainer that obtains anomaly data items each indicating anomaly in a corresponding one of moving bodies; a state obtainer that obtains state data items each indicating a state of a corresponding one of the moving bodies; a risk value calculator that calculates, for each of the anomaly data items, a risk value indicating a risk of the anomaly based on a state data item of the corresponding one of the moving bodies; a priority determiner that determines a priority of a task for dealing with the anomaly indicated by each of the anomaly data items, based on the risk value of the anomaly data item; and an outputter that provides output based on a result of the determination.

Claims (32)

1. A priority determination system, comprising:

a processor; and

a memory including a program that, when executed by the processor, causes the processor to perform operations, the operations including:

obtaining anomaly data items, each indicating an anomaly in a corresponding one of moving bodies;

obtaining state data items, each indicating a state of a corresponding one of the moving bodies;

calculating, for each of the anomaly data items, a risk value indicating a risk of the anomaly based on a state data item of the corresponding one of the moving bodies;

determining a priority of a task for dealing with the anomaly indicated by each of the anomaly data items, based on the risk value of each of the anomaly data items;

and providing an output based on a result of the determining, to a terminal to execute the task;

wherein the processor calculates the risk value for each of the anomaly data items by: (i) determining a basic risk value based on a type of the anomaly of the anomaly data item; and (ii) correcting the basic risk value based on a multiplying factor under a rule in which the state of the corresponding one of the moving bodies is associated with the multiplying factor,

the multiplying factor is for correcting the basic risk value and corresponds to the state indicated by the state data item of the corresponding one of the moving bodies,

and the priority of the task is determined based on the risk value and a predetermined index value of the task for dealing with the anomaly.

2. The priority determination system according to claim 1 , wherein

each of the state data items includes at least one of:

a type information item indicating a type of the corresponding one of the moving bodies;

a location information item indicating a location of the corresponding one of the moving bodies;

a traffic information item indicating a traffic state at a location corresponding to the location information item; or

a moving state information item indicating a moving state of the corresponding one of the moving bodies.

3. The priority determination system according to claim 1 , wherein

the predetermined index value of the task for dealing with the anomaly indicated by each of the anomaly data items is at least one of (i) a proportion of risk reduction resulting from executing of the task or (ii) a time required for executing the task.

4. The priority determination system according to claim 1 , wherein

the processor performs the determining regularly, every time the task is executed, or every time the anomaly is detected.

5. A priority determination method, comprising:

obtaining anomaly data items, each indicating an anomaly in a corresponding one of moving bodies;

obtaining state data items, each indicating a state of a corresponding one of the moving bodies;

calculating, for each of the anomaly data items, a risk value indicating a risk of the anomaly based on a state data item of the corresponding one of the moving bodies;

determining a priority of a task for dealing with the anomaly indicated by each of the anomaly data items, based on the risk value of each of the anomaly data items; and

providing an output based on a result of the determining, to a terminal to execute the task;

wherein the risk value for each of the anomaly data items is calculated by: (i) determining a basic risk value based on a type of the anomaly of the anomaly data item; and (ii) correcting the

basic risk value based on a multiplying factor under a rule in which the state of the corresponding one of the moving bodies is associated with the multiplying factor,

the multiplying factor is for correcting the basic risk value and corresponds to the state indicated by the state data item of the corresponding one of the moving bodies, and

the priority of the task is determined based on the risk value and a predetermined index value of the task for dealing with the anomaly.

6. A non-transitory computer-readable storage medium having recorded thereon a program for causing a computer to execute the priority determination method according to claim 5 .

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 28, 2024
From: PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.
To: PANASONIC AUTOMOTIVE SYSTEMS CO., LTD.
Reel/Frame 066703/0216 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 19, 2022
From: SEKIYA, SHOICHIRO; TORISAKI, YUISHI
To: PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.
Reel/Frame 062149/0147 →