IP Library Granted Patent US 12,002,342
Granted Patent B2
US 12,002,342 · App. 17/939,856 · Granted Jun 4, 2024

Network edge detection and notification of gas pressure situation

Inventors: James Lee Kann (Mica, WA); Janet Penz (Lakeview, MN); Katrina Polk (Ponte Vedra, FL)
Assignee: Itron, Inc.
G08B21/16G01M3/224G08B27/005G08B27/006
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,002,342
App. No.
17/939,856
Granted
Jun 4, 2024
Kind
B2
Abstract

Techniques for detecting a high gas pressure situation within a gas delivery system (e.g., for natural gas delivery to homes and businesses) are described. In one example, a device measures gas pressure. If a pressure over a threshold value is detected, a nearby device is messaged. The nearby device either confirms the over-pressure condition or indicates it may be more localized. If the condition is present within an area of the gas delivery system and/or within a group of devices within the gas delivery system, protective measures may be taken, such as closing valves providing gas to a number of service sites.

Claims (76)

1. A method, comprising:

measuring gas pressure at a first device to obtain a first gas pressure value;

determining, by operation of the first device, that the first gas pressure value exceeds a first threshold value, thereby indicating a first over-pressure condition;

receiving, at the first device, information, sent by a second device, wherein the information indicates whether a second over-pressure condition is present at the second device;

responsive to the first over-pressure condition being present at the first device and the second over-pressure condition not being present at the second device, reporting a local high gas-pressure event at the first device; and

responsive to the first over-pressure condition being present at the first device and the second over-pressure condition being present at the second device, reporting a high gas-pressure event within a distribution area comprising the first device and the second device.

2. The method of claim 1 , additionally comprising:

responsive to determining that the first gas pressure value exceeds the first threshold value, increasing a rate at which gas pressure is measured at the first device.

3. The method of claim 1 , wherein responsive to the information indicating the second over-pressure condition at the second device, the method additionally comprises:

closing a gas valve of the second device; and

notifying devices within a group of devices including the first device, the second device, and other devices, to close their respective gas valves.

4. The method of claim 1 , additionally comprising:

determining that a rate of gas pressure increase exceeds a second threshold value; and

closing a gas valve at the first device.

5. The method of claim 1 , additionally comprising:

shutting off, based at least in part on the second over-pressure condition at the second device, a supply of gas to a region within a gas distribution system, wherein the region includes the first device and the second device, and wherein the first device is a first gas meter of a first customer and the second device is a second gas meter of a second customer.

6. The method of claim 1 , additionally comprising:

sending a first message to a first cellular phone or to a first in-home device associated with the first device;

sending a second message to a second cellular telephone or to a second in-home device associated with a service site of the second device; and

sending a third message to a headend device, based at least in part on at least one condition being true, the conditions comprising:

the first gas pressure value exceeds the first threshold value; and

the second over-pressure condition at the second device.

7. The method of claim 1 , additionally comprising:

selecting the second device from among a plurality of devices, wherein the selecting is based at least in part on data describing aspects of a topology of a gas delivery system to which the first device and the second device are connected; and

sending at least one of the first gas pressure value or an indication that the first gas pressure value exceeds the first threshold value to the second device.

8. The method of claim 1 , additionally comprising:

measuring an RF signal strength of a signal sent by the second device; and

selecting the second device from among a plurality of devices based at least in part on the RF signal strength.

9. The method of claim 1 , additionally comprising:

sending, based at least in part on the second over-pressure condition at the second device, a shutdown command to a group of devices, wherein each device in the group of devices is connected to a gas main to which the first device is connected.

10. The method of claim 1 , additionally comprising:

defining a group of devices based at least in part on a topology of a gas delivery system;

determining that over-pressure conditions are present at a number of devices within the group of devices, wherein the number of devices exceeds a third threshold; and

reporting an over-pressure event affecting the group of devices.

11. A device, comprising:

a gas pressure sensor;

a radio;

a processor; and

memory, having defined thereon statements, which when executed by the processor perform actions comprising:

measuring gas pressure, by operation of the gas pressure sensor, to obtain a first gas pressure value;

determining that the first gas pressure value exceeds a first threshold value, thereby indicating a first over-pressure condition;

receiving, by operation of the radio, information, sent by a second device, wherein the information indicates whether a second over-pressure condition is present at the second device;

responsive to the first over-pressure condition being present at the first device and the second over-pressure condition not being present at the second device, reporting a local high gas-pressure event at the device; and

responsive to the first over-pressure condition being present at the first device and the second over-pressure condition being present at the second device, reporting a high gas-pressure event within a distribution area comprising the device and the second device.

12. The device as recited in claim 11 , additionally comprising:

sending, by operation of the radio, an indication of the first over-pressure condition to the second device.

13. The device as recited in claim 11 , additionally comprising:

a database comprising topological relationships of devices within a gas supply system to which the device is connected,

wherein the second device, to which data is sent, is selected based at least in part on reference to the database indicating that the device and the second device are on a same gas main.

14. The device as recited in claim 11 , wherein:

the device additionally comprises a gas valve; and

the actions additionally comprise closing the gas valve based at least in part on the first gas pressure value.

15. The device as recited in claim 11 , wherein the actions additionally comprise:

sending gas shutoff commands to devices based at least in part on two or more high gas pressure events;

sending alarms with pressure sampling data to a headend system;

sending information to at least one of a first cellular telephone or a first in-home device to warn a customer of the high gas-pressure event at the device;

sending information of the high gas-pressure event to at least one of a second cellular telephone or a second in-home device of a second customer within a threshold distance of the device; and

shutting a gas valve responsive to the high gas-pressure event at the device.

16. One or more non-transitory computer-readable media storing computer-executable instructions that, when executed by one or more processors, configure a computing device to perform acts comprising:

measuring gas pressure at a first device to obtain a first gas pressure value;

determining, by operation of the first device, that the first gas pressure value exceeds a first threshold value, thereby indicating a first over-pressure condition;

receiving, at the first device, information, sent by a second device, wherein the information indicates whether a second over-pressure condition is present at the second device;

responsive to the first over-pressure condition being present at the first device and the second over-pressure condition not being present at the second device, reporting a local high gas-pressure event at the first device; and

responsive to the first over-pressure condition being present at the first device and the second over-pressure condition being present at the second device, reporting a high gas-pressure event within a distribution area comprising the first device and the second device.

17. One or more non-transitory computer-readable media as recited in claim 16 , additionally comprising:

updating a database to include gas pressure measurements and gas pressure measurement locations,

wherein the database includes data describing aspects of a topology of a gas delivery system to which the first device and the second device are connected.

18. One or more non-transitory computer-readable media as recited in claim 16 , additionally comprising:

accessing a database comprising data describing aspects of a topology of a gas delivery system to which the first device and the second device are connected, wherein the topology additionally comprises locations on a gas mains at which devices are attached, and valves associated with attached devices; and

closing a gas valve selected from among at least two gas valves, wherein the gas valve was selected based at least in part on information obtained from accessing the database.

19. One or more non-transitory computer-readable media as recited in claim 16 , additionally comprising:

associating the first device and the second device in a group;

saving data generated by devices in the group in a database, wherein the data comprises gas pressure measurements, times of measurements, and locations of measurements; and

closing valves associated with each device in the group in response to the high gas-pressure event within the distribution area.

20. One or more non-transitory computer-readable media as recited in claim 16 , additionally comprising:

reporting the first over-pressure condition and the second over-pressure condition to a headend device.

Assignments (2)
SECURITY INTEREST Recorded Sep 15, 2025
From: ITRON, INC.
To: WELLS FARGO BANK, NATIONAL ASSOCIATION
Reel/Frame 072870/0873 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 7, 2024
From: KANN, JAMES LEE; PENZ, JANET; POLK, KATRINA
To: ITRON, INC.
Reel/Frame 067656/0328 →
Continuity (2)
Continuation 17127896 · Dec 18, 2020
Related Publication 20230005353A1 · Jan 5, 2023