IP Library Granted Patent US 12,652,559
Granted Patent B2
US 12,652,559 · App. 17/974,498 · Granted Jun 9, 2026

Method and device for fast master cell group link recovery in wireless communications

Inventor: Xiaobo Zhang (Shanghai, CN)
Assignee: APOGEE 5G GLOBAL, LLC
H04W24/08H04W76/19H04W76/25H04W76/30
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,652,559
App. No.
17/974,498
Granted
Jun 9, 2026
Kind
B2
Abstract

Method and device in a communication node for wireless communications. A communication node determines that a physical-layer problem occurs in a first serving cell; as a response to determining that the physical-layer problem occurs in the first serving cell, starts a first timer; determines that a first condition set is satisfied; as a response to the first condition set being satisfied, transmits a first signaling; as a response to the first condition set being satisfied, starts a second timer and stops the first timer; when the second timer is in a running state, monitors a second signaling; the first condition set comprises that an RLF occurs in the first serving cell and the second timer is configured; the second timer is associated with the first serving cell; the first signaling is used to initiate a radio connection recovery; and the second signaling is used to update a radio connection.

Claims (43)

1 . A user equipment (UE), comprising:

a transmitter; and

a receiver,

wherein the UE is configured to:

on a condition that N310 out-of-sync indications are received from a lower layer for a first cell:

start a T310 timer,

on a condition that a T316 timer is configured and a radio link failure occurs while a T310 timer is running:

transmit a master cell group (MCG) failure information (MCGFailureInformation) message for fast MCG link recovery,

stop the T310 timer, and

after the T310 timer is stopped, start the T316 timer, and

during a time when the T316 timer is running, receive an RRCRelease message or an RRCConnectionReconfiguration message including reconfigurationWithSync.

2 . The UE according to claim 1 , wherein the UE is configured to transmit the MCGFailureInformation message, stop the T310 timer and start the T316 timer on a condition that:

the radio link failure occurs for the first cell,

the UE is configured with a split SRB1 or an SRB3,

the first cell and a second cell are not suspended, and

the T316 timer is not running.

3 . The UE according to claim 1 , wherein the UE is configured to determine that the radio link failure occurred in the first cell on a condition that:

the T310 timer expires,

a timer T312 expires,

an indication of reaching a maximum retransmission number is received from an MCG RLC,

an indication of reaching a maximum retransmission number of an SRB or a DRB is received from an MCG RLC,

an indication of a Random Access (RA) problem is received from an MCG Medium Access Control (MAC) and none of timers T300, T301, T304, T311 and T319 is running, or

an indication of an RA problem is received from an MCG MAC and none of timers T300, T301, T304, and T311 is running.

4 . The UE according to claim 1 , wherein:

a signaling radio bearer of the MCGFailureInformation message is SRB1 or SRB3, and;

a logical channel bearing the MCGFailureInformation message includes a Dedicated Control Channel (DCCH), and the MCGFailureInformation message includes a ULInformationTransferMRDC message.

5 . The UE according to claim 1 , wherein the occurrence of the radio link failure is unrelated to the T310 timer.

6 . The UE according to claim 1 , wherein the UE is configured to:

on condition that N310 out-of-sync indications are received for a second cell, start a third timer, wherein transmitting the MCGFailureInformation message does not affect a timing of the third timer.

7 . The UE according to claim 1 , wherein the UE is configured to stop the T316 timer and transmit a confirmation message on a condition that the RRCConnectionReconfiguration message is received.

8 . The UE according to claim 7 , wherein a signaling radio bearer of the confirmation message includes an SRB1 or an SRB3, a logical channel bearing the confirmation message includes a DCCH, and the confirmation message is an RRCConnectionReconfigurationComplete message.

9 . The UE-according to claim 1 , wherein: the UE is configured to transmit an RRCReestablishmentRequest message or an RRCConnectionReestablishmentRequest message in response to expiration of the T316 timer.

10 . The UE according to claim 1 , wherein: the RRCConnectionReconfiguration message indicates an expiration value of the T310 timer and an expiration value of the T316 timer.

11 . The UE according to claim 10 , wherein a signaling radio bearer of the RRCConnectionReconfiguration message is SRB1 or SRB3.

12 . The UE according to claim 1 , wherein the T310 timer is not started on a condition that the T316 timer is running.

13 . The UE according to claim 12 , wherein the T310 timer is started on a condition that the T316 timer is not running.

14 . A method, comprising:

receiving N310 out-of-sync indications from a lower layer for a first cell, and starting a T310 timer,

wherein a T316 timer is configured and a radio link failure occurs while the T310 timer is running;

transmitting a master cell group (MCG) failure information (MCGFailureInformation) message for fast MCG link recovery,

stopping the T310 timer, and

starting a T316 timer, wherein the T316 timer is started after the T310 timer is stopped; and

during a time when the T316 timer is running, receiving an RRCRelease message or an RRCConnectionReconfiguration message including reconfigurationWithSync.

Assignments (3)
CHANGE OF NAME Recorded Mar 9, 2026
From: APOGEE NETWORKS, LLC
To: APOGEE 5G GLOBAL, LLC
Reel/Frame 075091/0596 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 4, 2025
From: SHANGHAI LANGBO COMMUNICATION TECHNOLOGY COMPANY LIMITED
To: APOGEE NETWORKS, LLC
Reel/Frame 070741/0575 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 16, 2023
From: ZHANG, XIAOBO
To: SHANGHAI LANGBO COMMUNICATION TECHNOLOGY COMPANY LIMITED
Reel/Frame 064600/0617 →
Priority Claims (5)
CN 202010372499.4 · May 6, 2020 · national
CN 202010384934.5 · May 9, 2020 · national
CN 202010414985.8 · May 15, 2020 · national
CN 202010466971.0 · May 28, 2020 · national
CN 202110313749.1 · Mar 24, 2021 · national
Continuity (2)
Continuation PCTCN2021091503 · Apr 30, 2021
Related Publication 20230100878A1 · Mar 30, 2023
References Cited (42)
US 11483889B2 · Kim · 2022 [cited by examiner]
US 12185402B2 · Orsino · 2024 [cited by examiner]
US 20190253949A1 · Park et al. · 2019 [cited by applicant]
US 20200037242A1 · Yilmaz et al. · 2020 [cited by applicant]
US 20200045764A1 · Kim · 2020 [cited by applicant]
US 20200059395A1 · Chen · 2020 [cited by examiner]
US 20220110180A1 · Jung · 2022 [cited by examiner]
US 20220124568A1 · Wu · 2022 [cited by examiner]
US 20230081518A1 · Jin · 2023 [cited by examiner]
US 20230086398A1 · Teyeb · 2023 [cited by examiner]
US 20230142688A1 · Wu · 2023 [cited by examiner]
US 20230262540A1 · Kim · 2023 [cited by examiner]
CN 104811982A · 2015 [cited by applicant]
CN 106537971A · 2017 [cited by applicant]
CN 110447180A · 2019 [cited by applicant]
CN 110582128A · 2019 [cited by applicant]
CN 110839301A · 2020 [cited by applicant]
WO 2017163676A1 · 2017 [cited by applicant]
WO 2020034949A1 · 2020 [cited by applicant]
Office Action received in application EP21723095.2 dated Aug. 24, 2023. [cited by applicant]
Office Action received in application EP21723095.2 dated Sep. 18, 2024. [cited by applicant]
Second Office Action of Chinese patent application No. CN202010384934.5 dated Apr. 26, 2023. [cited by applicant]
Supplementary Search Report of Chinese patent application No. CN202010384934.5 dated Apr. 23, 2023. [cited by applicant]
3GPP TS 38.331 V16.0.0 Technical Specification, 3rdGeneration Partnership Project; Technical Specification Group Radio Access Network; NR; Radio Resource Control(RRC) protocol specification(Release 16) Mar. 31, 2020. [cited by applicant]
Ericsson (Rapporteur) CR for 36.331 on CA/DC Enhancements 3GPP TSG-RAN WG2 Meeting #109bis-e R2-2003381 Apr. 15, 2020. [cited by applicant]
Notification to Grant Patent Right for Invention of Chinses patent application No. CN202010384934.5 dated Jul. 28, 2023. [cited by applicant]
Notification to Grant Patent Right for Invention of Chinses patent application No. CN202110313749.1 dated Jun. 27, 2023. [cited by applicant]
Second Search Report of Chinses patent application No. CN202110313749.1 dated Jun. 2, 2023. [cited by applicant]
Supplementary Search Report of Chinses patent application No. CN202110313749.1 dated Jun. 1, 2023. [cited by applicant]
3GPP TS 38.331 V16.0.0(Mar. 2020) 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR;Radio Resource Control (RRC) protocol specification (Release 16) Apr. 6, 2020. [cited by applicant]
Intel Corporation “Open issues on Configuration of MCG failure indication and timer T316” 3GPP TSG-RAN WG2 Meeting #108 R2-1914863 Nov. 8, 2019. [cited by applicant]
ISR received in application No. PCT/CN2021/091503 dated Jul. 19, 2021. [cited by applicant]
First Office Action of Chinses patent application No. CN202010384934.5 dated Dec. 29, 2022. [cited by applicant]
First Office Action of Chinses patent application No. CN202110313749.1 dated Jan. 12, 2023. [cited by applicant]
First Search Report of Chinses patent application No. CN202010384934.5 dated Dec. 21, 2022. [cited by applicant]
First Search Report of Chinses patent application No. CN202110313749.1 dated Dec. 30, 2022. [cited by applicant]
Samsung, “Draft 36331 Rel-16 resulting from CR merge [108#28][R16 RRC],” 3GPP TSG-RAN WG2 Meeting #109e, R2-20xxxxx (R2-2001159), Online (Feb. 24-Mar. 6, 2020). [cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and NR; Multi-connectivity; Stage 2 (Release 16),” 3GPP TS 37.340 V16.1.0 (M… [cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; NR; Multiplexing and channel coding (Release 16),” 3GPP TS 38.212 V16.1.0 (Mar. 2020). [cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; NR; Physical layer procedures for data (Release 16),” 3GPP TS 38.214 V16.1.0 (Mar. 2020). [cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; NR; NR and NG-RAN Overall Description; Stage 2 (Release 16),” 3GPP TS 38.300 V16.1.0 (Mar. 2020). [cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; NR; Medium Access Control (MAC) protocol specification (Release 16),” 3GPP TS 38.321 V16.0.0 (Mar. 2020). [cited by applicant]