Method of laying a pipeline on a seafloor, monitoring surrounding zones of the installed pipeline for approaching vessels and warning vessels considered to be able to cause harm to the pipeline

Inventors: Mohammed Khajavi (Stabekk, NO); Tobias Sommerfelt Rønning (Stabekk, NO); Eric Waymel (Vestfossen, NO); Nicholas Riviere (Oslo, NO); Elisabeth Nøst (Kolsås, NO)
Assignee: TechnipFMC Norge AS
F16L1/123F16L1/16G08G3/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,422,060
App. No.
18/010,593
Granted
Sep 23, 2025
Kind
B2
Abstract

It is described a method of laying a pipeline ( 1 ) on a seafloor ( 2 ), wherein the method comprises the steps of: —bringing the pipeline to an offshore location using a vessel, —laying the pipeline on the seafloor using the vessel, —defining a first zone ( 10 ) surrounding at least a first part length ( 1 ′) of the pipeline when laid subsea, wherein the first part length is uncovered, —defining a second zone ( 20 ) extending from the first zone, —monitoring the second zone for vessels approaching the first zone, —analysing vessels detected during said monitoring of the second zone, for the purpose of determining whether the vessels can cause harm to the first part length of the pipeline, —for each vessel monitored in the second zone and considered to be able to cause harm to the first part length of the pipeline, informing the vessel about the first zone and/or requesting the vessel not to enter into the first zone.

Claims (19)

1. A method of laying a pipeline on a seafloor and protecting the pipeline with at least two types of protection, the method comprising:

bringing the pipeline to an offshore location using a vessel;

laying the pipeline on the seafloor using the vessel;

defining a first zone surrounding at least a first part length of the pipeline when laid subsea, wherein the first part length is uncovered;

covering at least a second part length of the pipeline when laid subsea with a physical protection barrier;

defining a second zone extending from the first zone;

leaving the second part length unmonitored;

monitoring by use of satellites and/or other tools activities in the second zone for vessels approaching the first zone;

analysing vessels detected during said monitoring of the second zone for the purpose of determining whether the vessels are capable of causing harm to the first part length of the pipeline; and

for each vessel monitored in the second zone and considered to be able to cause harm to the first part length of the pipeline, informing the vessel about the first zone and/or requesting the vessel not to enter into the first zone.

2. The method according to claim 1 , wherein said second zone encircles the first zone.

3. The method according to claim 1 , wherein said physical protection barrier comprises rocks.

4. The method according to claim 1 , wherein said second part length of the pipeline is laid at or close to an offshore installation and/or at to shore.

5. The method according to claim 1 , wherein the subsea pipeline is a fluid pipeline.

6. The method according to claim 1 , wherein the subsea pipeline is a cable.

7. The method according to claim 1 , wherein the subsea pipeline is a combination of a fluid pipeline and a cable.

8. The method according to claim 1 , wherein the method comprises laying the pipeline between an offshore installation and a satellite well.

9. The method according to claim 1 , wherein the method comprises laying the pipeline between an offshore installation and shore.

10. The method according to claim 1 , wherein the method comprises laying the pipeline between an offshore installation and another offshore installation.

Assignments (2)
CHANGE OF NAME Recorded Jun 17, 2025
From: FMC KONGSBERG SUBSEA AS
To: TECHNIPFMC NORGE AS
Reel/Frame 071648/0304 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 15, 2022
From: KHAJAVI, MOHAMMAD; SOMMERFELT RØNNING, TOBIAS; WAYMEL, ERIC; RIVIERE, NICHOLAS; NØST, ELISABETH
To: FMC KONGSBERG SUBSEA AS
Reel/Frame 062103/0496 →
Priority Claims (1)
NO 20200745 · Jun 25, 2020 · national
Continuity (1)
Related Publication 20230313910A1 · Oct 5, 2023
References Cited (12)
US 5193937A · Miller · 1993 [cited by applicant]
US 20130041523A1 · Jensen et al. · 2013 [cited by applicant]
US 20130275055A1 · Hansen · 2013 [cited by examiner]
US 20190011062A1 · Olsen · 2019 [cited by examiner]
CN 101859497B · 2010 [cited by applicant]
CN 109633556A · 2019 [cited by applicant]
EP 2635875B1 · 2017 [cited by applicant]
GB 2007598A · 1979 [cited by examiner]
NO 20150666A1 · 2016 [cited by applicant]
WO WO0202979A1 · 2002 [cited by applicant]
WO WO2011113438A1 · 2011 [cited by applicant]
WO WO2017070289A1 · 2017 [cited by applicant]