IP Library Granted Patent US 12,248,030
Granted Patent B2
US 12,248,030 · App. 18/059,486 · Granted Mar 11, 2025

Test arrangement for testing a power electronics controller, and power electronics module for such a test arrangement

Inventors: Joerg Bracker (Paderborn, DE); Daniel Epping (Paderborn, DE)
Assignee: DSPACE GMBH
G01R31/42H02J3/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,248,030
App. No.
18/059,486
Granted
Mar 11, 2025
Kind
B2
Abstract

A power electronics module for a test arrangement for testing a power electronics controller includes: supply connections for supplying energy; at least one load connection for providing at least one electrical connection variable; a supply circuit for providing electrical control voltages; a selection circuit with circuit breakers for switching one of the electrical control voltages onto the at least one load connection of the power electronics module; and an interface for controlling the circuit breakers. The supply connections of the power electronics module are AC supply connections. The supply circuit is a multi-phase circuit for providing a plurality of phase voltages on a plurality of phase conductors. The selection circuit connects a phase conductor to the at least one load connection of the power electronics module.

Claims (21)

1. A test arrangement for testing a power electronics controller, wherein the power electronics controller has supply connections for supplying energy and load connections for controlling an electrical load, the test arrangement comprising:

a plurality of power electronics modules, wherein each power electronics module comprises:

supply connections for supplying energy;

at least one load connection for providing at least one electrical connection variable;

a supply circuit for providing electrical control voltages;

a selection circuit having circuit breakers for switching one of the electrical control voltages onto the at least one load connection of the power electronics module; and

an interface for controlling the circuit breakers;

wherein the test arrangement is configured to simulate an environment of the power electronics controller for testing the power electronics controller, wherein simulating the environment of the power electronics controller comprises both the supply connections of the power electronics controller and the load connections of the power electronics controller each being respectively connected to at least one respective load connection of a power electronics module and at least one respective electrical connection variable being provided at the supply connections of the power electronics controller and the load connections of the power electronics controller;

wherein the supply connections of the power electronics modules are connected to one another via an electrical intermediate network;

wherein the supply connections of the power electronics modules are AC supply connections;

wherein the electrical intermediate network is an AC intermediate network;

wherein the supply circuits of the power electronics modules are multi-phase circuits for providing a plurality of phase voltages on a plurality of phase conductors; and

wherein the selection circuits of the power electronics modules connect phase conductors to the load connections of the power electronics modules.

2. The test arrangement according to claim 1 , wherein the AC intermediate network is connectable to an external AC network.

3. The test arrangement according to claim 1 , wherein the AC intermediate network is three-phase.

4. The test arrangement according to claim 1 , wherein the power electronics modules each have a galvanic isolation between the supply connections of the power electronics module and the at least one load connection of the power electronics module.

5. The test arrangement according to claim 4 , wherein the galvanic isolation is realized by a transformer.

6. The test arrangement according to claim 5 , wherein the transformer is three-phase on the supply side and at least three-phase on the load side.

7. The test arrangement according to claim 6 , wherein the transformer is realized as a 3-to-6-phase transformer, wherein the supply side is realized with three coils connected in a delta connection, and wherein the load side is realized with six coils in a star connection.

8. The test arrangement according to claim 1 , wherein the circuit breakers of the selection circuit comprise bidirectionally blockable power semiconductors.

9. The test arrangement according to claim 1 , wherein the power electronics controller is a motor controller for an electric motor, and wherein the at least one respective electrical connection variable provided at the supply connections of the power electronics controller and the load connections of the power electronics controller are based on a battery model and a motor model.

Assignments (2)
CHANGE OF NAME Recorded May 22, 2026
From: DSPACE GMBH
To: DSPACE SE & CO. KG
Reel/Frame 075622/0216 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 29, 2022
From: BRACKER, JOERG; EPPING, DANIEL
To: DSPACE GMBH
Reel/Frame 061902/0169 →
Priority Claims (1)
EP 21211759 · Dec 1, 2021 · regional
Continuity (1)
Related Publication 20230168313A1 · Jun 1, 2023
References Cited (7)
US 11567138B2 · Vuorio · 2023 [cited by examiner]
US 20070165438A1 · Chou · 2007 [cited by examiner]
US 20120139576A1 · Dreyer · 2012 [cited by examiner]
US 20180123497A1 · Holthaus · 2018 [cited by examiner]
CN 111781532A · 2020 [cited by applicant]
EP 2953246A2 · 2015 [cited by applicant]
EP 3316477A1 · 2018 [cited by applicant]
Cited By (1)
US 12,461,140