IP Library Granted Patent US 12,242,009
Granted Patent B2
US 12,242,009 · App. 18/063,010 · Granted Mar 4, 2025

Method and system for measuring strain rate at a scale shorter than gauge length

Inventors: Vladimir Kazei (Houston, TX); Konstantin Osypov (Houston, TX); Harold Merry (Houston, TX)
Assignee: SAUDI ARABIAN OIL COMPANY
G01V1/42G01H9/006G01V1/226G01V2210/121G01V2210/1429
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,242,009
App. No.
18/063,010
Granted
Mar 4, 2025
Kind
B2
Abstract

A method and system for measuring strain rate at a scale shorter than gauge length are disclosed. The method includes deploying a plurality of discrete seismic receivers and a distributed acoustic system (DAS) in a borehole extending into a formation. The method further includes obtaining a first DAS measurement (DAS1) between a first position and a second position, obtaining a second DAS measurement (DAS2) between a third position and a fourth position, and obtaining a discrete seismic receiver measurement between the second position and the fourth position. The method further includes determining an DAS equivalent discrete measurement (DASeq) from the discrete seismic receiver measurement, determining a sub-gauge DAS measurement (DASsg) based, at least in part, on the first DAS measurement, the second DAS measurement and the DAS equivalent discrete measurement, and determining mechanical characteristics of the formation based, at least in part, on the sub-gauge DAS measurement.

Claims (35)

1. A method, comprising:

deploying a plurality of discrete seismic receivers and a distributed acoustic system (DAS) in a borehole extending into a formation;

obtaining a first DAS measurement (DAS1) between a first position and a second position;

obtaining a second DAS measurement (DAS2) between a third position and a fourth position;

obtaining a discrete seismic receiver measurement between the second position and the fourth position;

determining an DAS equivalent discrete measurement (DASeq) from the discrete seismic receiver measurement;

determining a sub-gauge DAS measurement (DASsg) based, at least in part, on the first DAS measurement, the second DAS measurement and the DAS equivalent discrete measurement; and

determining mechanical characteristics of the formation based, at least in part, on the sub-gauge DAS measurement.

2. The method of claim 1 , further comprising planning and deploying a well completion in the borehole based, at least in part, on the mechanical characteristics of the formation.

3. The method of claim 1 , wherein the sub-gauge DAS measurement is calculated by DAS sg =DAS1+DAS eq −DAS2.

4. The method of claim 1 , wherein a first distance between the first and second positions equals a second distance between the third and fourth positions.

5. The method of claim 4 , wherein a third distance between the first and the third positions is less than the first distance.

6. The method of claim 5 , wherein the first distance lies in a range of 2-20 meters.

7. The method of claim 6 , wherein the third distance is less than 5 meters.

8. The method of claim 1 , wherein the plurality of discrete seismic receivers are deployed with a spacing that equals a gauge length of the DAS system.

9. The method of claim 2 , wherein the plurality of discrete seismic receivers is disposed outside a casing.

10. The method of claim 1 , wherein each discrete seismic receiver comprises a geophone, an accelerometer, or a hydrophone.

11. A system, comprising:

a plurality of discrete seismic receivers and a distributed acoustic system (DAS) deployed in a borehole extending into a formation; and

a seismic processor configured to:

obtain a first DAS measurement (DAS1) between a first position and a second position;

obtain a second DAS measurement (DAS2) between a third position and a fourth position;

obtain a discrete seismic receiver measurement between the second position and the fourth position;

determine an DAS equivalent discrete measurement (DAS eq ) from the discrete seismic receiver measurement;

determine a sub-gauge DAS measurement (DAS sg ) based, at least in part, on the first DAS measurement, the second DAS measurement and the DAS equivalent discrete measurement; and

determine mechanical characteristics of the formation based, at least in part, on the sub-gauge DAS measurement.

12. The system of claim 11 , further comprising a completion design system configured to plan a well completion in the borehole based, at least in part, on the mechanical characteristics of the formation.

13. The system of claim 11 , wherein the sub-gauge DAS measurement is calculated by DAS sg =DAS1+DAS eq −DAS2.

14. The system of claim 11 , wherein a first distance between the first and second positions equals a second distance between the third and fourth positions.

15. The system of claim 14 , wherein a third distance between the first and the third positions is less than the first distance.

16. The system of claim 15 , wherein the first distance lies in a range of 2-20 meters.

17. The system of claim 16 , wherein the third distance is less than 5 meters.

18. The system of claim 11 , wherein the plurality of discrete seismic receivers are deployed with a spacing that equals a gauge length of the DAS system.

19. The system of claim 11 , wherein the plurality of discrete seismic receivers is permanently disposed outside a casing.

20. The system of claim 11 , wherein each discrete seismic receiver comprises a geophone, an accelerometer, or a hydrophone.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 18, 2023
From: SAUDI ARAMCO UPSTREAM TECHNOLOGIES COMPANY
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 065268/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 17, 2023
From: ARAMCO SERVICES COMPANY
To: SAUDI ARAMCO UPSTREAM TECHNOLOGIES COMPANY
Reel/Frame 065255/0318 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 11, 2023
From: KAZEI, VLADIMIR; OSYPOV, KONSTANTIN; MERRY, HAROLD
To: ARAMCO SERVICES COMPANY
Reel/Frame 064561/0786 →
Continuity (1)
Related Publication 20240192396A1 · Jun 13, 2024
References Cited (9)
US 10151626B2 · Godfrey et al. · 2018 [cited by applicant]
US 10287874B2 · Jin et al. · 2019 [cited by applicant]
US 20190120047A1 · Jin et al. · 2019 [cited by applicant]
US 20190331819A1 · Wu et al. · 2019 [cited by applicant]
US 20200018149A1 · Luo et al. · 2020 [cited by applicant]
WO WO2013093460A2 · 2013 [cited by examiner]
WO 2020242448A1 · 2020 [cited by applicant]
A. Constantinou et al., Comparison of Fiber-optic Sensor and Borehole Seismometer VSP Surveys in a Scientific Borehole: Dfdp-2B, Alpine Fault, New Zealand, SEG International Exposition and Annual Meeting 2016: SEG-2016-… [cited by applicant]
Office Action issued by Saudi Arabian patent office for corresonding Saudi Arabian patent application No. SA 123450992, mailed Nov. 7, 2024 (6 pages). [cited by applicant]