IP Library Patent Application 18182370
Patent Application
App. No. 18/182,370

SYSTEMS AND METHODS FOR RANKING ONE OR MORE PROJECTS

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
18/182,370
Abstract

Automated scheduling systems and methods for completing one or more projects are disclosed. The system includes a processor coupled to a memory. The processor is configured to receive a request for completing one or more projects. The request includes one or more features assigned for each project. The processor is further configured to generate a project workflow for completing the one or more projects. The project workflow is generated based on one or more parameters for timely completing the one or more projects. In addition, the processor is configured to rank the one or more projects to be completed in an order of priority based on the one or more parameters.

Claims (33)

1 . An automated scheduling system for completing one or more projects, the system comprising:

a processor coupled to a memory, the processor configured to:

receive a request for completing one or more projects, wherein the request includes one or more features assigned for each project;

rank the one or more projects to be completed in an order of priority based on one or more parameters; and

determine a priority score for the one or more projects based on the rank, wherein the priority score indicates an importance level for timely completing the one or more projects.

2 . The system of claim 1 , wherein the request includes a project location, a project timeline, and one or more building blocks that implement the one or more features.

3 . The system of claim 2 , wherein the one or more building blocks are reusable pieces of code that implement partial functionalities of the one or more features assigned for each project.

4 . The system of claim 1 , wherein the processor is further configured to:

determine at least one feature overlapping between a first project of the one or more projects and one or more subsequent projects of the one or more projects.

5 . The system of claim 4 , wherein the processor is further configured to use development details of the at least one feature as developed in the first project while developing the at least one feature in the one or more subsequent projects.

6 . The system of claim 1 , wherein the one or more parameters for ranking the one or more projects are based on at least one of a finish time path duration, a risk distribution, value of the project, a project speed, and a proximity to a completion deadline.

7 . The system of claim 1 , wherein the processor is configured to determine whether one or more workers working on each project require specialized training for timely completing the projects.

8 . A method for completing one or more projects, the method comprising:

receiving a request for completing one or more projects, wherein the request includes one or more features assigned for each project;

ranking the one or more projects to be completed in an order of priority based on one or more parameters; and

determining a priority score for the one or more projects based on the rank, wherein the priority score indicates an importance level for timely completing the one or more projects.

9 . The method of claim 8 , wherein the request includes a project location, a project timeline, and one or more building blocks that implement the one or more features.

10 . The method of claim 9 , wherein the one or more building blocks are reusable pieces of code that implement partial functionalities of the one or more features assigned for each project.

11 . The method of claim 8 , further comprising:

determining at least one feature overlapping between a first project of the one or more projects and one or more subsequent projects of the one or more projects.

12 . The method of claim 11 , further comprising using development details of the at least one feature as developed in the first project while developing the at least one feature in the one or more subsequent projects.

13 . The method of claim 8 , wherein the one or more parameters for ranking the one or more projects are based on at least one of a finish time path duration, a risk distribution, value of the project, a project speed, and a proximity to a completion deadline.

14 . The method of claim 8 , further comprising determining whether one or more workers working on each project require specialized training for timely completing the projects.

15 . A computer readable storage medium having data stored therein representing software executable by a computer, the software comprising instructions that, when executed, cause the computer readable storage medium to perform:

receiving a request for completing one or more projects, wherein the request includes one or more features assigned for each project;

ranking the one or more projects to be completed in an order of priority based on the one or more parameters analyzed; and

determining a priority score for the one or more projects based on the rank, wherein the priority score indicates an importance level for timely completing the one or more projects.

16 . The computer readable storage medium of claim 15 , wherein the request includes a project location, a project timeline, and one or more building blocks that implement the one or more features.

17 . The computer readable storage medium of claim 16 , wherein the one or more building blocks are reusable pieces of code that implement partial functionalities of the one or more features assigned for each project.

18 . The computer readable storage medium of claim 15 , wherein the instructions further cause the computer readable storage medium to perform:

determining at least one feature overlapping between a first project of the one or more projects and one or more subsequent projects of the one or more projects.

19 . The computer readable storage medium of claim 18 , wherein the instructions further cause the computer readable storage medium to perform using development details of the at least one feature as developed in the first project while developing the at least one feature in the one or more subsequent projects.

20 . The computer readable storage medium of claim 15 , wherein the one or more parameters for ranking the one or more projects are based on at least one of a finish time path duration, a risk distribution, value of the project, a project speed, and a proximity to a completion deadline.

Assignments (2)
SUPPLEMENT NO. 1 TO INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded Mar 4, 2025
From: ENGINEER.AI CORP.; ENGINEER.AI GLOBAL LIMITED
To: VIOLA CREDIT PARTNERS MANAGEMENT, LIMITED PARTNERSHIP, AS COLLATERAL AGENT
Reel/Frame 070393/0620 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 1, 2025
From: DUGGAL, SACHIN DEV; PATEL, ROHAN
To: ENGINEER.AI CORP
Reel/Frame 069713/0478 →