IP Library Patent Application 18195194
Patent Application
App. No. 18/195,194

CHARGING AND DISCHARGING OF ELECTRIC VEHICLE (EV) CHARGING STATION BATTERIES

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
18/195,194
Abstract

The following relates generally to charging and discharging electric vehicle (EV) charging station batteries. In some embodiments, a first battery stack is charged by: (i) providing electrical power from a second battery stack to a switch mode power supply, and (ii) providing electrical power from the switch mode power supply to the first battery stack. A controller may then determine an occurrence of a trigger event associated with a first state of charge (SOC) of the first battery stack or a second SOC of the second battery stack. In response to determining the trigger event occurrence, the second battery stack may be charged by: (i) providing electrical power from the first battery stack to the switch mode power supply, and (ii) providing electrical power from the switch mode power supply to the second battery stack.

Claims (51)

1 . A computer-implemented method for charging and discharging electric vehicle (EV) charging station batteries, the method comprising:

charging a first battery stack by: (i) providing electrical power from a second battery stack to a switch mode power supply, and (ii) providing electrical power from the switch mode power supply to the first battery stack;

determining, by a controller, occurrence of a trigger event associated with a first state of charge (SOC) of the first battery stack or a second SOC of the second battery stack; and

in response to determining occurrence of the trigger event, charging the second battery stack by: (i) providing electrical power from the first battery stack to the switch mode power supply, and (ii) providing electrical power from the switch mode power supply to the second battery stack.

2 . The method of claim 1 , further comprising:

receiving, at the controller from a first battery management system (BMS) electrically coupled to the first battery stack, a first battery stack charge status signal, wherein the first BMS is configured to generate the first battery stack charge status signal indicating the first SOC of the first battery stack.

3 . The method of claim 2 , wherein the trigger event comprises the first SOC exceeding a battery stack charge completion threshold of at least approximately 85% SOC.

4 . The method of claim 1 , further comprising:

receiving, at the controller from a second battery management system (BMS) electrically coupled to the second battery stack, a second battery stack charge status signal, wherein the second BMS is configured to generate the second battery stack charge status signal indicating the second SOC of the second battery stack.

5 . The method of claim 4 , wherein the trigger event comprises the second SOC not exceeding a battery stack charge depletion threshold of less than approximately 10% SOC.

6 . The method of claim 1 , wherein the switch mode power supply comprises:

a boost component configured to: (i) receive an input voltage from either the first battery stack or the second battery stack, and (ii) output a boosted output voltage to a buck component; and

the buck component configured to: (i) receive the boosted output voltage, and (ii) output a charging current to either of the first battery stack or the second battery stack.

7 . The method of claim 6 , wherein the charging current is determined based on a charging current signal generated by: (i) a first battery management system (BMS) electrically coupled to the first battery stack, or (ii) a second BMS electrically coupled to the second battery stack.

8 . The method of claim 6 , wherein:

the boosted output voltage is approximately 860V; and

the received input voltage is between approximately 600V and 810V.

9 . The method of claim 1 , further comprising:

determining, by the controller, occurrence of a top off power supply trigger event associated with the first SOC of the first battery stack or the second SOC of the second battery stack; and

in response to determining occurrence of the top off power supply trigger event, providing, from a top off power supply, additional electrical power to the second battery stack.

10 . The method of claim 9 , wherein determining the top off power supply trigger event comprises determining that: (i) the first SOC of the first battery stack has fallen below a battery stack charge depletion threshold, and (ii) the second SOC of the second battery stack has not passed a battery stack charge completion threshold.

11 . A non-transitory computer-readable storage medium for charging and discharging electric vehicle (EV) charging station batteries comprising instructions that, when executed by one or more processors of a controller of a system, cause the controller to control the system to:

charge a first battery stack by: (i) providing electrical power from a second battery stack to a switch mode power supply, and (ii) providing electrical power from the switch mode power supply to the first battery stack;

determine occurrence of a trigger event associated with a first state of charge (SOC) of the first battery stack or a second SOC of the second battery stack; and

in response to the determination of occurrence of the trigger event, charge the second battery stack by: (i) providing electrical power from the first battery stack to the second battery stack, and (ii) providing electrical power from the switch mode power supply to the second battery stack.

12 . The non-transitory computer-readable storage medium of claim 11 , wherein the instructions, when executed, further cause the controller to control the system to:

receive, from a first battery management system (BMS) electrically coupled to the first battery stack, a first battery stack charge status signal, wherein the first BMS is configured to generate the first battery stack charge status signal indicating the first SOC of the first battery stack.

13 . The non-transitory computer-readable storage medium of claim 11 , wherein the instructions, when executed, further cause the controller to control the system to:

receive, from a second battery management system (BMS) electrically coupled to the second battery stack, a second battery stack charge status signal, wherein the second BMS is configured to generate the second battery stack charge status signal indicating the second SOC of the second battery stack.

14 . The non-transitory computer-readable storage medium of claim 11 , wherein the instructions, when executed, further cause the controller to control the system to:

determine an occurrence of a top off power supply trigger event associated with the first SOC of the first battery stack or the second SOC of the second battery stack; and

in response to the determination of the occurrence of the top off power supply trigger event, provide, from a top off power supply, additional electrical power to the second battery stack.

15 . A system for charging and discharging electric vehicle (EV) charging station batteries, the system comprising:

a first battery assembly comprising: (i) a first battery stack, and (ii) a first battery management system (BMS), wherein the first BMS is configured to generate a first battery stack charge status signal indicating a first state of charge (SOC) of the first battery stack;

a second battery assembly comprising: (i) a second battery stack, and (ii) a second BMS, wherein the second BMS is configured to generate a second battery stack charge status signal indicating a second SOC of the second battery stack;

a switch mode power supply electrically connected to the first battery assembly and the second battery assembly; and

a controller communicatively connected to the first BMS, the second BMS, and the switch mode power supply and configured to:

control charging of the first battery stack until occurrence of a trigger event by: (i) providing electrical power from the second battery stack to the switch mode power supply and (ii) providing electrical power from the switch mode power supply to the first battery stack;

determine occurrence of the trigger event based upon the first SOC or the second SOC; and

in response to determining occurrence of the trigger event, control charging of the second battery stack by: (i) providing electrical power from the first battery stack to the switch mode power supply and (ii) providing electrical power from the switch mode power supply to the second battery stack.

16 . The system of claim 15 , wherein the trigger event comprises the first SOC exceeding a battery stack charge completion threshold of at least approximately 85% SOC.

17 . The system of claim 15 , wherein the trigger event comprises the second SOC not exceeding a battery stack charge depletion threshold of less than approximately 10% SOC.

18 . The system of claim 15 , wherein the switch mode power supply comprises:

a boost component configured to: (i) receive an input voltage from either the first battery stack or the second battery stack, and (ii) output a boosted output voltage to a buck component; and

the buck component configured to: (i) receive the boosted output voltage, and (ii) output a charging current to either of the first battery stack or the second battery stack.

19 . The system of claim 18 , wherein:

the first BMS is further configured to output a charging current signal to the switch mode power supply; and

the buck component is further configured to output the charging current at a charging current level according to the charging current signal.

20 . The system of claim 18 , wherein:

the boosted output voltage is approximately 860V; and

the received input voltage is between approximately 600V and 810V.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 17, 2024
From: FREEWIRE TECHNOLOGIES, INC.
To: SPEED CHARGE, LLC
Reel/Frame 068404/0655 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 15, 2023
From: WAI, YU HEI SUNNY; SULLIVAN, SHAWN
To: FREEWIRE TECHNOLOGIES, INC.
Reel/Frame 063643/0001 →