IP Library Granted Patent US 12,406,587
Granted Patent B1
US 12,406,587 · App. 18/203,402 · Granted Sep 2, 2025

Aircraft flight operations datalink

Inventors: Sean Patrick Suiter (Omaha, NE); Richard Andrew Kruse (Omaha, NE)
Assignee: Otto Aero Company
G08G5/55B64D45/08G08G5/21G08G5/30G08G5/34G08G5/54G08G5/58G08G5/76G08G5/26
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,406,587
App. No.
18/203,402
Granted
Sep 2, 2025
Kind
B1
Abstract

Aircraft flight operations datalink for preparing an aircraft for flight, by a particular pilot (crew) for a particular flight plan via a portable computing device. The aircraft flight operations datalink includes a wireless data link; computer processor; data bus; an association with a flight sensor for collecting aircraft position, weather, traffic, terrain, aircraft systems status, aircraft flight envelope parameters, pilot (crew) status/condition; a display system; a ground-to-air data link; and a database of aircraft and pilot data; a flight plan; and flight conditions. In flight operations, the datalink may be utilized to relieve a pilot (crew) from performing tasks necessary to mitigate an emergency or reduce a flight operation urgency.

Claims (59)

1. An aircraft, comprising:

(a) a bus;

(b) at least one sensor connected to said bus to report one or more of a position, airspeed, attitude, or altitude of the aircraft;

(c) an autopilot connected to said bus and one or more aircraft controls, the autopilot capable of directing adjustment of one or more of the position, airspeed, attitude, or altitude via the one or more aircraft controls;

(d) a wireless data-link connected to said bus to receive at least one expected flight path for the aircraft from a portable computing device;

(e) a memory connected to said bus for storing the received expected flight path;

(f) at least one processor connected to said bus and coupled with one or more of the sensor, autopilot, wireless data-link, or memory, the at least one processor programmed to:

receive at least one of a position, airspeed, altitude, or attitude of the aircraft from the at least one sensor;

receive, via a user interface, at least one pilot input including:

(1) a flight control input to adjust one or more of the position, airspeed, altitude, or attitude, the flight control input associated with a deviation of the aircraft from at least one performance norm;

wherein, when the at least one pilot input is a flight control input, the at least one processor is further programmed to:

correct the deviation via the aircraft controls after one or more notifications are provided and the one or more notifications are unacknowledged, wherein the one or more notifications are more insistent as the deviation at least one of persists or increases;

or

(2) a pilot request to correct the deviation of the aircraft; wherein, when the at least one pilot input is a pilot request, the at least one processor is further programmed to correct the deviation via the aircraft controls by initiatinq at least one emergency protocol;

and

create an alternate landing site (ALS) hierarchy by determining a suitability value for each of a plurality of alternate landing sites, wherein each assigned suitability value is based on weighting a plurality of factors related to the alternate landing site's suitability for landing;

and

(g) a display connected to said bus for displaying flight information.

2. The aircraft of claim 1 , wherein said deviation correction is a procedure selected from said memory, said procedure wirelessly updated to said memory via the portable computing device.

3. The aircraft of claim 2 , wherein said memory is a data repository of a portable computing device configured to receive preflight data via said wireless data-link from a second data repository operably coupled to a ground-based computing device.

4. The aircraft of claim 3 , wherein said portable computing device includes at least one of a tablet or a smartphone.

5. The aircraft of claim 1 , wherein: said memory further comprises an onboard dataset to receive one or more updates wirelessly from a portable computing device, the one or more updates associated with at least one of a flight plan parameter, aircraft parameter, pilot parameter, or system parameter.

6. The aircraft of claim 1 , further comprising:

at least one additional processor associated with at least one of said at least one sensor, weather sensor, traffic sensor, wireless data-link, aircraft performance control, autopilot, or annunciator;

wherein said initiation of the deviation correction is distributed between said at least one processor and said at least one additional processor,

and

wherein said annunciator is at least one of a voice notification, graphic display, audio tone, or haptic notification.

7. The aircraft of claim 1 , wherein said display is capable of displaying a turn back for re-landing procedure and the processor is capable of instructing the display to display a re-land procedure when the processor determines the aircraft may re-land based at least in part on at least one of position, airspeed, attitude, or altitude.

8. The aircraft of claim 6 , wherein said aircraft performance control includes at least two of a throttle, elevator, rudder, ailerons, flaps, spoiler, or gear.

9. The aircraft of claim 8 , wherein said display is capable of displaying at least one of angle of attack or aircraft total energy.

10. The aircraft of claim 9 , wherein said display is capable of displaying at least one of aircraft kinetic energy available to convert to potential energy, or aircraft potential energy available to convert to kinetic energy.

11. The aircraft of claim 10 , wherein said processor includes a total energy flight controller.

12. The aircraft of claim 11 , wherein said display at least one of textually or graphically displays information related to said initiated deviation correction.

13. The aircraft of claim 2 , wherein said display at least one of textually or graphically displays one or more items associated with said procedure in seriatim.

14. The aircraft of claim 13 , wherein said display at least one of textually or graphically displays said procedure as a flight director on an artificial horizon.

15. The aircraft of claim 1 , wherein said wireless data-link communicatively connects said portable computing device to an aircraft receiver.

16. The aircraft of claim 1 , wherein said wireless data-link is a wireless data-link to aircraft avionics, and at least one of surface-based or space-based radio.

17. The aircraft of claim 2 , wherein said wireless data-link receives said expected flight path of the aircraft from said portable computing device during at least one of a preflight, a flight, or a postflight of the aircraft.

18. The aircraft of claim 4 , wherein said aircraft parameter further includes at least one of a maintenance status, a catering status or requirement, a potable water and waste status, a temperature or lighting status, or an aircraft requirement.

19. The aircraft of claim 4 , wherein said flight plan parameter further includes a path of connected planned flight fixes including at least one of a navigational aid (navaid), a waypoint, or an airway.

20. The aircraft of claim 4 , wherein said flight plan parameter further includes at least one of a schedule, a route, a load, a fuel plan, a fix list, an overflight authorization, or a notice to air missions (NOTAM).

21. The aircraft of claim 4 , wherein said pilot parameter further includes at least one of a crew member list, a pilot monitor including a flight time limitation, a duty time limitation, a latest allowable takeoff time (LATT), or a pilot schedule.

22. The aircraft of claim 1 , wherein said at least one processor is further programmed for communicating with maintenance at least one of before, during, or after a flight segment.

23. The aircraft of claim 4 , wherein said at least one processor is further programmed for querying at least one of a ground-to-air, air-to-air, or space-based satellite database for said at least one flight plan parameter, aircraft parameter, pilot parameter, or system parameter.

24. The aircraft of claim 1 , wherein said at least one processor is further programmed for sending a notification to the pilot or ground personnel during a preflight assessment.

25. The aircraft of claim 1 , wherein said at least one processor is programmed for informing the pilot of a configuration of the aircraft different from an expected configuration.

26. The aircraft of claim 1 , wherein the weiqhted factors include one or more of

the current position of the aircraft;

an airport landing procedure;

or

at least one additional selection criteria selected from the group including at least one of a weather condition, wind condition, or runway length.

27. The aircraft of claim 1 , wherein said processor selects an alternate landing site from the ALS hierarchy based on the determined suitability values.

28. The aircraft of claim 27 , wherein said processor creates a flight path from a current position of the aircraft to a landing associated with the selected alternate landing site via at least one of a waypoint or an initial approach fix.

29. The aircraft of claim 28 , wherein said processor reports to air traffic control an aircraft diversion.

30. The aircraft of claim 29 , wherein said processor is programmed to:

determine an estimated time of arrival at the selected alternate landing site;

display the selected alternate landing site and a route to the selected alternate landing site on the display;

and

continue to determine the suitability of at least the selected alternate landing site, and reroute the aircraft to a new alternate landing site, based on changes to the determined suitability.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 13, 2026
From: OTTO AERO COMPANY
To: AUTOMATIC LANDING SYSTEMS COMPANY
Reel/Frame 075255/0428 →
CHANGE OF NAME Recorded May 21, 2026
From: OTTO AERO COMPANY
To: AUTOMATIC LANDING SYSTEMS COMPANY
Reel/Frame 075622/0388 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 30, 2023
From: SUITER, SEAN PATRICK; KRUSE, RICHARD ANDREW
To: OTTO AERO COMPANY
Reel/Frame 063797/0212 →
Continuity (18)
Continuation 17544645 · Dec 7, 2021
Continuation 17492448 · Oct 1, 2021
Continuation 17478807 · Sep 17, 2021
Continuation 17478821 · Sep 17, 2021
Continuation 16673725 · Nov 4, 2019
Continuation 16673725 · Nov 4, 2019
Continuation 16673725 · Nov 4, 2019
Continuation 15152437 · May 11, 2016
Continuation 14741283 · Jun 16, 2015
Continuation 14142390 · Dec 27, 2013
Continuation 13831398 · Mar 14, 2013
Provisional Application 62024723 · Jul 15, 2014
Provisional Application 62012734 · Jun 16, 2014
Provisional Application 61900199 · Nov 5, 2013
Provisional Application 61870125 · Aug 26, 2013
Provisional Application 61754522 · Jan 18, 2013
Provisional Application 61750286 · Jan 8, 2013
Provisional Application 61747051 · Dec 28, 2012
References Cited (183)
US 4438475A · Haley · 1984 [cited by applicant]
US 5136267A · Cabot · 1992 [cited by applicant]
US 5136297A · Lux et al. · 1992 [cited by applicant]
US 5142480A · Morrow · 1992 [cited by applicant]
US 5459469A · Schuchman et al. · 1995 [cited by applicant]
US 5933098A · Haxton · 1999 [cited by applicant]
US 5974349A · Levine · 1999 [cited by applicant]
US 6148179A · Wright et al. · 2000 [cited by applicant]
US 6167238A · Wright · 2000 [cited by applicant]
US 6181990B1 · Grabowsky et al. · 2001 [cited by applicant]
US 6278965B1 · Glass et al. · 2001 [cited by applicant]
US 6353779B1 · Simon et al. · 2002 [cited by applicant]
US 6438469B1 · Dwyer et al. · 2002 [cited by applicant]
US 6553333B1 · Shenk · 2003 [cited by applicant]
US 6573841B2 · Price · 2003 [cited by applicant]
US 6591171B1 · Ammar et al. · 2003 [cited by applicant]
US 6629023B1 · Silder, Jr. et al. · 2003 [cited by applicant]
US 6804585B2 · Humbard et al. · 2004 [cited by applicant]
US 6980959B1 · Garrow et al. · 2005 [cited by applicant]
US 7006032B2 · King et al. · 2006 [cited by applicant]
US 7061401B2 · Voos et al. · 2006 [cited by applicant]
US 7167782B2 · Humbard et al. · 2007 [cited by applicant]
US 7295135B2 · Younkin · 2007 [cited by applicant]
US 7305286B1 · Younkin et al. · 2007 [cited by applicant]
US 7489992B2 · Valette et al. · 2009 [cited by applicant]
US 7505835B2 · Brust et al. · 2009 [cited by applicant]
US 7689328B2 · Spinelli · 2010 [cited by applicant]
US 7698025B1 · Cornell et al. · 2010 [cited by applicant]
US 7786900B2 · Bitar et al. · 2010 [cited by applicant]
US 7874521B2 · Shuster · 2011 [cited by applicant]
US 7908042B2 · Brinkley et al. · 2011 [cited by applicant]
US 8027758B2 · Ferro et al. · 2011 [cited by applicant]
US 8035547B1 · Flanigan et al. · 2011 [cited by applicant]
US 8087616B2 · Shuster · 2012 [cited by applicant]
US 8131407B1 · Robinson · 2012 [cited by applicant]
US 8140260B2 · Feyereisen et al. · 2012 [cited by applicant]
US 8190727B2 · Henkel · 2012 [cited by applicant]
US 8234068B1 · Young et al. · 2012 [cited by applicant]
US 8244455B2 · Case et al. · 2012 [cited by applicant]
US 8292234B2 · Shuster · 2012 [cited by applicant]
US 8356776B2 · Berens et al. · 2013 [cited by applicant]
US 8457889B2 · Feyereisen et al. · 2013 [cited by applicant]
US 8477061B1 · Pedersen · 2013 [cited by applicant]
US 8527118B2 · Jones et al. · 2013 [cited by applicant]
US 8543264B1 · Tomas · 2013 [cited by applicant]
US 8629788B1 · Greenleaf et al. · 2014 [cited by applicant]
US 8698653B2 · Rogers et al. · 2014 [cited by applicant]
US 8702033B2 · Regmi · 2014 [cited by applicant]
US 8983687B1 · Hunter et al. · 2015 [cited by applicant]
US 9026275B1 · Young et al. · 2015 [cited by applicant]
US 9047762B1 · Neuville et al. · 2015 [cited by applicant]
US 9171473B1 · McNally et al. · 2015 [cited by applicant]
US 9253753B2 · Rubin et al. · 2016 [cited by applicant]
US 9257047B2 · Bailey et al. · 2016 [cited by applicant]
US 9257048B1 · Offer et al. · 2016 [cited by applicant]
US 9280903B2 · Judy et al. · 2016 [cited by applicant]
US 9284045B1 · Springer et al. · 2016 [cited by applicant]
US 9349296B2 · Wiesemann et al. · 2016 [cited by applicant]
US 9355564B1 · Tyson et al. · 2016 [cited by applicant]
US 9527587B2 · Levien et al. · 2016 [cited by applicant]
US 9536433B2 · Savarit et al. · 2017 [cited by applicant]
US 9542849B1 · Bertram et al. · 2017 [cited by applicant]
US 9567097B2 · Horsager et al. · 2017 [cited by applicant]
US 9567099B2 · Poux et al. · 2017 [cited by applicant]
US 9583010B1 · Kolek et al. · 2017 [cited by applicant]
US 9640079B1 · Moravek et al. · 2017 [cited by applicant]
US 9646502B1 · Gentry · 2017 [cited by applicant]
US 9685090B2 · Kneuper et al. · 2017 [cited by applicant]
US 9691286B2 · Bahrami et al. · 2017 [cited by applicant]
US 9704405B2 · Kashi et al. · 2017 [cited by applicant]
US 9728090B2 · Bitar et al. · 2017 [cited by applicant]
US 9728093B2 · Wiesemann et al. · 2017 [cited by applicant]
US 9733349B1 · Wood et al. · 2017 [cited by applicant]
US 9800665B2 · Uczekaj et al. · 2017 [cited by applicant]
US 10114381B2 · Haskins et al. · 2018 [cited by applicant]
US 10203700B2 · Haskins et al. · 2019 [cited by applicant]
US 11496566B2 · Uczekaj et al. · 2022 [cited by applicant]
US 20020039072A1 · Gremmert et al. · 2002 [cited by applicant]
US 20020158168A1 · Greene · 2002 [cited by applicant]
US 20030093187A1 · Walker · 2003 [cited by applicant]
US 20040030463A1 · Stockdale et al. · 2004 [cited by applicant]
US 20040246145A1 · Andrews et al. · 2004 [cited by applicant]
US 20040249519A1 · Frink · 2004 [cited by applicant]
US 20050004723A1 · Duggan et al. · 2005 [cited by applicant]
US 20050156777A1 · King et al. · 2005 [cited by applicant]
US 20050261814A1 · Ryan et al. · 2005 [cited by applicant]
US 20060031006A1 · Stenbock et al. · 2006 [cited by applicant]
US 20070005199A1 · He · 2007 [cited by applicant]
US 20070018052A1 · Eriksson · 2007 [cited by applicant]
US 20070129855A1 · Coulmeau · 2007 [cited by applicant]
US 20070194171A1 · Diamandis et al. · 2007 [cited by applicant]
US 20080039988A1 · Estabrook et al. · 2008 [cited by applicant]
US 20080154447A1 · Spinelli · 2008 [cited by applicant]
US 20080195309A1 · Prinzel, IIIet al. · 2008 [cited by applicant]
US 20080300740A1 · Hamburg · 2008 [cited by applicant]
US 20090027232A1 · Lavielle et al. · 2009 [cited by applicant]
US 20090138144A1 · Flannigan et al. · 2009 [cited by applicant]
US 20090150012A1 · Agam · 2009 [cited by examiner]
US 20090152391A1 · McWhirk · 2009 [cited by applicant]
US 20090287365A1 · Riedinger · 2009 [cited by applicant]
US 20090319104A1 · Bailly et al. · 2009 [cited by applicant]
US 20100042316A1 · Caillaud · 2010 [cited by examiner]
US 20100057899A1 · Henkel · 2010 [cited by applicant]
US 20100070110A1 · Badli et al. · 2010 [cited by applicant]
US 20100085236A1 · Franceschini et al. · 2010 [cited by applicant]
US 20100095084A1 · Manning · 2010 [cited by applicant]
US 20100109865A1 · Armstrong · 2010 [cited by applicant]
US 20100309222A1 · Feyereisen et al. · 2010 [cited by applicant]
US 20100328138A1 · Guigné et al. · 2010 [cited by applicant]
US 20110184593A1 · Swope · 2011 [cited by applicant]
US 20110215922A1 · Armstrong · 2011 [cited by applicant]
US 20110251740A1 · Ledesma et al. · 2011 [cited by applicant]
US 20110264312A1 · Spinelli · 2011 [cited by examiner]
US 20110298618A1 · Stahl et al. · 2011 [cited by applicant]
US 20110313597A1 · Wilson et al. · 2011 [cited by applicant]
US 20120056760A1 · Bourret · 2012 [cited by examiner]
US 20120116610A1 · Righi · 2012 [cited by examiner]
US 20120143482A1 · Goossen et al. · 2012 [cited by applicant]
US 20120177198A1 · Cabos · 2012 [cited by applicant]
US 20120191273A1 · Jacobs et al. · 2012 [cited by applicant]
US 20120221175A1 · Spinelli · 2012 [cited by applicant]
US 20120265374A1 · Yochum · 2012 [cited by applicant]
US 20130060466A1 · Gurusamy · 2013 [cited by examiner]
US 20130090842A1 · Stabile · 2013 [cited by applicant]
US 20130096738A1 · Yamasaki · 2013 [cited by applicant]
US 20130116863A1 · Goupil · 2013 [cited by examiner]
US 20130131970A1 · Pendry et al. · 2013 [cited by applicant]
US 20130197721A1 · Gu et al. · 2013 [cited by applicant]
US 20130204523A1 · He et al. · 2013 [cited by applicant]
US 20130242864A1 · Vermande et al. · 2013 [cited by applicant]
US 20130274964A1 · Jesse et al. · 2013 [cited by applicant]
US 20130345905A1 · Parthasarathy · 2013 [cited by applicant]
US 20140129058A1 · Elahi et al. · 2014 [cited by applicant]
US 20140152507A1 · McAllister · 2014 [cited by applicant]
US 20140156166A1 · Moeckly et al. · 2014 [cited by applicant]
US 20140197980A1 · Schulte et al. · 2014 [cited by applicant]
US 20140210648A1 · Samuthirapandian et al. · 2014 [cited by applicant]
US 20140222248A1 · Levien et al. · 2014 [cited by applicant]
US 20140249693A1 · Stark et al. · 2014 [cited by applicant]
US 20140257692A1 · Stefani et al. · 2014 [cited by applicant]
US 20140297068A1 · Revell et al. · 2014 [cited by applicant]
US 20140304107A1 · McAllister · 2014 [cited by applicant]
US 20140327564A1 · Sampigethaya · 2014 [cited by applicant]
US 20150077270A1 · Rubin et al. · 2015 [cited by applicant]
US 20150081201A1 · Rubin et al. · 2015 [cited by applicant]
US 20150170524A1 · Stefani et al. · 2015 [cited by applicant]
US 20150296500A1 · Kanovsky et al. · 2015 [cited by applicant]
US 20150344149A1 · Mumaw et al. · 2015 [cited by applicant]
US 20150356873A1 · Kneuper et al. · 2015 [cited by applicant]
US 20160012289A1 · Petit · 2016 [cited by applicant]
US 20160027310A1 · Samuthirapandian et al. · 2016 [cited by applicant]
US 20160107751A1 · D'Andrea et al. · 2016 [cited by applicant]
US 20160117931A1 · Chan et al. · 2016 [cited by applicant]
US 20160244187A1 · Byers et al. · 2016 [cited by applicant]
US 20160284222A1 · Nicholls et al. · 2016 [cited by applicant]
US 20170229024A1 · Moravek et al. · 2017 [cited by applicant]
US 20190094886A1 · Haskins et al. · 2019 [cited by applicant]
US 20190129448A1 · Haskins et al. · 2019 [cited by applicant]
Flying, Issue 942, Oct. 2023 “We Fly: GARMIN Autoland for the Beechcraft King Air 200” pp. 37-47. [cited by applicant]
Julie Boatman, We Fly: Garmin Autoland For the Beechcraft King Air 200; Flying, Issue 942, October. [cited by applicant]
Legget, Julian, (Jun. 1993). “Happy Landings” in Fog, Popular Mechanics. pp. 973-975. [cited by applicant]
Boatman, Julie, (Mar. 5, 2020), “Garmin's Autoland Gets Flight Tested”, Flying Magazine. Retrieved from https://www.flyingmag.com/garmin-autoland-flight-tested/. [cited by applicant]
Charley J. “The RAE Contribution to All-Weather Landing”. In: Journal of Aeronautical History 1 (Jan. 2011), pp. 3-21. [cited by applicant]
Federal Aviation Administration. (2018, July 2), Advisory Circular 120-118, Criteria for Approval/Authorization of All Weather Operations for Takeoff, Landing and Rollout, Retrieved from https://www.faa.gov/regulations_… [cited by applicant]
Garrison, Kevin, (Jun. 2012), “Categories of the ILS”, AVWeb, Retrieved from https://www.avweb.com/flight-safety/technique/categories-of-the-ils/. [cited by applicant]
George, Fred, “Autonomy to the Rescue”, Avionics, Aviation Week & Space Technology Nov. 11-24, 2019, 40-41 Garmin Autoland. [cited by applicant]
Jackson, Hagan L., (Jan. 1947). New Instrument System Proposed For Flight and Landing Safety, Aviation, pp. 86-87. [cited by applicant]
Larson, George C. (Aug. 2012), “The First Autolanding”, Air Space Magazine, Retrieved from https://www.airspacemag.com/history-of-flight/the-first-autolanding-3818066/. [cited by applicant]
Mola, Roger, History of Aircraft Landing Aids, U.S. Centennial of Flight Commission, Retrieved from https://www.centennialofflight.net/essay/Government_Role/landing_nav/POL14.htm. [cited by applicant]
Planes Are Landing by Radio When Fog Hides the Field. 1931. Chicago, IL: Popular Mechanics. [cited by applicant]
Siegel, Diana et al., “Development of an Autoland System for General Aviation Aircraft.” Master Thesis. Massachusetts Institute of Technology, Report No. ICAT-2011-09, Sep. 2011, 208 Pages. [cited by applicant]
Singer, Neil, “Get it in Writing: Controller-Pilot Datalink Tackles Miscommunications with Text” AOPA Pilot, Turbine Edition, Jul. 1, 2022, pp. T-14-T-20. [cited by applicant]
SR-22 Pilot's Operating Handbook and FAA Approved Airplane Flight Manual for the CIRRUS Design SR22, Rev 3 Supplement for Garmin GFC 700 starts on p. 389 (Dec. 14, 2020); ESP referenced on pp. 398-399, LVL button pp. 40… [cited by applicant]
Steel-Potter, Jaime; Steel Aviation, Cirrus Aircraft, The History, vol. 3, Phillipsburg Airport-317, Phillipsburg, Ohio; pp. 66-68. [cited by applicant]
Stephen Pope, “Aspen's Connected Panel Links EFBs with Avionics,” www.flyingmag.com; Jul. 26, 2011 https://www.flyingmag.com/news-aspens-connected-panel-links-efbs-avionics/. [cited by applicant]
Wikipedia contributors. (Dec. 5, 2021). Blind Landing Experimental Unit. In Wikipedia, The Free Encyclopedia. Retrieved from https://en.wikipedia.org/w/index.php?title=Blind_Landing_Experimental_Unit&oldid=1058748820. [cited by applicant]
Wikipedia, URL: https//en.wikipedia.orgwikiAutoland, Downloaded Sep. 28, 2021, 9 pages. [cited by applicant]
Abzug MJ, Larrabee EE. (2002). Airplane stability and control: a history of the technologies that made aviation possible. Cambridge University Press, ISBN 978-0-521-80992-4. [cited by applicant]
Final Report on the accident on Jun. 1, 2009 to the Airbus A330-203 registered F-GZCP operated by Air France flight AF 447 Rio de Janeiro-Paris; Bureau d'Enquetes et d'Analysis. [cited by applicant]
Flight Envelope Protection: https://en.wikipedia.org/wiki/Flight_envelope_protection (accessed Apr. 2, 2024). [cited by applicant]
North, David. (2000) “Finding Common Ground in Envelope Protection Systems”. Aviation Week & Space Technology, Aug. 28, pp. 66-68. [cited by applicant]
Pratt, R. (2000). Flight control systems: practical issues in design and implementation. Institution of Electrical Engineers. ISBN 978-0-85296-766-9. [cited by applicant]
Risukhin V. (2001). Controlling Pilot Error: Automation. McGraw-Hill Professional. ISBN 978-0-07-137320-3. [cited by applicant]