IP Library Granted Patent US 12,611,955
Granted Patent B1
US 12,611,955 · App. 18/243,629 · Granted Apr 28, 2026

Smart load management apparatus and system for electric vehicle charging

Inventors: John Loren Passmore (Berkeley, CA); Jason Appelbaum (Oakland, CA)
Assignee: Evercharge, Inc.
B60L53/63B60L53/10B60L53/14B60L53/60G05B19/042G05B2219/2639Y04S10/126
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,611,955
App. No.
18/243,629
Granted
Apr 28, 2026
Kind
B1
Abstract

Embodiments of the inventive concept measure the amount of electrical power being consumed in one or more houses or buildings, before the utility meter or meters. These measurements are used by a smart load manager (SLM) apparatus, in addition to information about the maximum capacity of the electrical lines that are being measured, to maximize the number of electric vehicle supply equipment (EVSE) units that can be installed in the one or more buildings, and maximize the amount of power that is available for electric vehicle (EV) charging at any given time.

Claims (32)

1 . A smart load manager apparatus for electric vehicle charging, the apparatus comprising:

a communication unit configured to communicate with one or more electric vehicle supply equipment (EVSE) units;

a power measurement unit coupled to the communication unit, and configured to measure an active power load value being drawn over an electrical line, wherein the power measurement unit is configured to measure the active power load value at a location between an electrical meter of at least one of a house or a building, and an electric utility provider, and wherein the power measurement unit is installed at a location between the electrical meter of the at least one of the house or the building, and the electric utility provider;

a microprocessor coupled to the communication unit and the power management unit;

a storage device coupled to the microprocessor; and

a real-time power management logic section coupled to the microprocessor, and configured to periodically calculate at least one of a house-wide available power value or a building-wide available power value dependent on the active power load value, wherein:

the microprocessor is configured to execute logic associated with the real-time power management logic section;

the real-time power management logic section is configured to cause to be stored by the storage device a maximum installed power load value for the at least one of the house or the building; and

the real-time power management logic section is configured to determine the at least one of the house-wide available power value or the building-wide available power value by subtracting the active power load value from the maximum installed power load value.

2 . The smart load manager apparatus for electric vehicle charging of claim 1 , wherein the microprocessor is configured to cause the communication unit to communicate with the one or more EVSE units dependent on the active power load value being drawn over the electrical line.

3 . The smart load manager apparatus for electric vehicle charging of claim 1 , wherein the real-time power management logic section is configured to power load balance the one or more EVSE units using the communication unit dependent on the at least one of the house-wide available power value or the building-wide available power value.

4 . The smart load manager apparatus for electric vehicle charging of claim 1 , wherein the real-time power management logic section is configured to determine a buffer-reduced maximum installed power load value by subtracting a safety buffer value from the active power load value.

5 . The smart load manager apparatus for electric vehicle charging of claim 4 , wherein the real-time power management logic section is configured to determine the at least one of the house-wide available power value or the building-wide available power value by subtracting the active power load value from the buffer-reduced maximum installed power load value.

6 . The smart load manager apparatus for electric vehicle charging of claim 1 , wherein:

the real-time power management logic section is configured to determine an EVSE load power value for each of the one or more EVSE units; and

the real-time power management logic section is configured to control the EVSE load power value for each of the one or more EVSE units dependent on the at least one of the house-wide available power value or the building-wide available power value.

7 . The smart load manager apparatus for electric vehicle charging of claim 6 , wherein:

the real-time power management logic section is configured to determine a non-EVSE load power value by subtracting the EVSE load power value for all of the one or more EVSE units from the active power load value; and

the real-time power management logic section is configured to power load balance the one or more EVSE units dependent on the non-EVSE load power value.

8 . The smart load manager apparatus for electric vehicle charging of claim 7 , wherein the real-time power management logic section is configured to periodically adjust an allocation of power to the one or more EVSE units dependent on changes over time in the non-EVSE load power value.

9 . A computer-implemented method for electric vehicle charging, the method comprising:

installing a power measurement unit at a location between an electrical meter of at least one of a house or a building, and an electric utility provider;

measuring, by the power measurement unit, an active power load value being drawn over an electrical line, wherein measuring includes measuring the active power load value at a location between the electrical meter of the at least one of the house or the building, and the electric utility provider;

communicating, by a communication unit, the active power load value of the at least one of the house or the building to one or more electric vehicle supply equipment (EVSE) units;

causing, by a microprocessor that is coupled to the communication unit and the power management unit, the communication unit to communicate with the one or more EVSE units dependent on the active power load value being drawn over the electrical line;

periodically calculating, by a real-time power management logic section that is coupled to the microprocessor, at least one of a house-wide available power value or a building-wide available power value dependent on the active power load value;

executing, by the microprocessor, logic associated with the real-time power management logic section;

causing to be stored, by the real-time power management logic section, in a storage device, a maximum installed power load value for the at least one of the house or the building; and

determining, by the real-time power management logic section, the at least one of the house-wide available power value or the building-wide available power value by subtracting the active power load value from the maximum installed power load value.

10 . The method of claim 9 , further comprising power load balancing, by the real-time power management logic section, the one or more EVSE units using the communication unit dependent on the at least one of the house-wide available power value or the building-wide available power value.

11 . The method of claim 9 , further comprising determining, by the real-time power management logic section, a buffer-reduced maximum installed power load value by subtracting a safety buffer value from the active power load value.

12 . The method of claim 11 , further comprising determining, by the real-time power management logic section, at least one of the house-wide available power value or the building-wide available power value by subtracting the active power load value from the buffer-reduced maximum installed power load value.

Assignments (2)
SECURITY INTEREST Recorded Jan 21, 2026
From: EVERCHARGE, INC.
To: MASSACHUSETTS DEVELOPMENT FINANCE AGENCY
Reel/Frame 073538/0289 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 19, 2023
From: PASSMORE, JOHN LOREN; AP, JASON
To: EVERCHARGE, INC.
Reel/Frame 064953/0106 →
Continuity (3)
Continuation 17398986 · Aug 10, 2021
Continuation 16354025 · Mar 14, 2019
Provisional Application 62643043 · Mar 14, 2018
References Cited (2)
US 20110004358A1 · Pollack · 2011 [cited by examiner]
US 20160221453A1 · Bridges · 2016 [cited by examiner]