IP Library Granted Patent US 12,466,670
Granted Patent B2
US 12,466,670 · App. 18/268,969 · Granted Nov 11, 2025

Bucket wheel chute assembly

Inventors: Hubert Pfandl (Styria, AT); Alexanda Damion Bozward (Perth, AU); Rudolf Pletz (Styria, AT); Christopher Robert Muller (Perth, AU); Georg Leitner (Styria, AT)
Assignee: KOCH SOLUTIONS GMBH
B65G65/20E02F3/181E02F7/06
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,466,670
App. No.
18/268,969
Granted
Nov 11, 2025
Kind
B2
Abstract

A bucket wheel chute assembly comprising a frame and a bucket wheel chute. The bucket wheel chute comprising a plurality of wear plates. The bucket wheel chute comprising a first chute section and a second chute section and is detachably attached to the frame. At least one of the first chute section and second chute section is detachably attached to the frame by a first movable attachment means.

Claims (15)

1 . A bucket wheel chute assembly comprising:

a frame and a bucket wheel chute, the bucket wheel chute comprising a plurality of wear plates forming a chute surface, the bucket wheel chute comprising a first chute section and a second chute section, each of the first chute section and second chute section comprising at least one wear plate and is detachably attached to the frame, and wherein at least one of the first chute section and second chute section is detachably attached to the frame by a first movable attachment means configured for moving relative to the frame, such that the first chute section and second chute section may be at least partially separated while being attached to the frame, wherein the first chute section is detachably attached to the frame by a first moveable attachment means and the second chute section is detachably attached to the frame by a second movable attachment means.

2 . The bucket wheel chute assembly according to claim 1 , wherein the first chute section and the second chute section are individually detachable from the frame.

3 . The bucket wheel chute assembly according to claim 1 , wherein the frame has a distal end and a proximal end and wherein the first moveable attachment means is configured to move in a direction from the distal end of the frame to the proximal end of the frame.

4 . A bucket wheel chute assembly comprising:

a frame and a bucket wheel chute, the bucket wheel chute comprising a plurality of wear plates forming a chute surface, the bucket wheel chute comprising a first chute section and a second chute section, each of the first chute section and second chute section comprising at least one wear plate and is detachably attached to the frame, and wherein at least one of the first chute section and second chute section is detachably attached to the frame by a first movable attachment means configured for moving relative to the frame, such that the first chute section and second chute section may be at least partially separated while being attached to the frame, wherein the frame comprising at least one sliding member and wherein the first movable attachment means and/or second moveable attachment means is a sliding assembly configured to slide along the sliding member.

5 . The bucket wheel chute assembly according to claim 1 , wherein the first chute section is configured to move from an operating position in which the first chute section contacts the second chute section, into a maintenance position in which the first chute section is separated from the second chute section thereby providing a free space adjacent the second chute section, and wherein the second chute section is configured to move towards to the free space when the first chute section is in the maintenance position.

6 . The bucket wheel chute assembly according to claim 1 , wherein the first chute section and/or second chute section is configured to pivot relative to the frame such that a back side of the first chute section and/or second chute section may be oriented substantially upwards.

7 . The bucket wheel chute assembly according to claim 1 , wherein the bucket wheel chute assembly additionally comprising one or more actuator devices configured for moving the first chute section and/or second chute section.

8 . A method for removing a bucket wheel chute from a bucket wheel chute assembly comprising:

a frame and a bucket wheel chute, the bucket wheel chute comprising a plurality of wear plates forming a chute surface, the bucket wheel chute comprising a first chute section and a second chute section, each of the first chute section and second chute section comprising at least one wear plate and is detachably attached to the frame, and wherein at least one of the first chute section and second chute section is detachably attached to the frame by a first movable attachment means configured for moving relative to the frame, such that the first chute section and second chute section may be at least partially separated while being attached to the frame the method comprising the steps of:

separating the first chute section from the second chute section by moving the first chute section relative to the second chute section thereby providing a free area adjacent the second chute section; and

moving the second chute section towards the free area.

9 . The method for removing a bucket wheel chute according to claim 8 , wherein the method further comprises the step of pivoting the first chute section and or second chute section relative to the frame such that the back side of the first chute section and/or second chute section is oriented substantially upwards.

10 . The method for removing a bucket wheel chute according to claim 8 , wherein the method further comprises the step of detaching the first chute section and/or the second chute section from the frame.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 5, 2024
From: FLSMIDTH A/S
To: KOCH SOLUTIONS GMBH
Reel/Frame 066348/0936 →
Priority Claims (1)
DK PA 2020 01439 · Dec 21, 2020 · national
Continuity (1)
Related Publication 20240059509A1 · Feb 22, 2024
References Cited (14)
US 3774741A · Johnson · 1973 [cited by examiner]
US 5035313A · Smith · 1991 [cited by examiner]
US 8051970B2 · Shaber · 2011 [cited by examiner]
US 12152365B2 · Pletz · 2024 [cited by examiner]
US 20020189916A1 · Cole · 2002 [cited by examiner]
US 20210355650A1 · De Wet · 2021 [cited by examiner]
CN 108569570A · 2018 [cited by examiner]
CN 110203711A · 2019 [cited by examiner]
EP 439891A · 1991 [cited by examiner]
JP 2019006548A · 2019 [cited by examiner]
KR 20140074012A · 2014 [cited by examiner]
WO 2020077402A1 · 2020 [cited by applicant]
IPSearch History Feb. 3, 2025 UTC; InnovationQ+ ; https://iq.ip.com/discover/searchhistory?id=5889731 (Year: 2025). [cited by examiner]
International Search Report and Written Opinion dated Mar. 21, 2022, 12 pages. [cited by applicant]